Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on March 24, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

On-Call Wastewater Engineering Design Services

Closed
WEDS-RFQ 01-25State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 221320
New
Federal
Y--GRCA 257282 - Replace Wastewater Plant at South Ri
Solicitation # 140P2026R0101
Solicitation 140P2026R0101 is an unrestricted full and open competition Invitation for Bid issued by the National Park Service, DSC Contracting Services Division, for the replacement of the South Rim Wastewater Treatment Plant at Grand Canyon National Park, Arizona. This design-bid-build project involves the construction of a GD Membrane Bio-Reactor wastewater treatment plant, including new process systems, administrative and support buildings, and utility connections. The scope of work encompasses complete demolition and removal of existing infrastructure, site preparation, grading, paving, fencing, and improvements to the facility access road. The project also requires a 12-month operational support period following construction. The estimated magnitude of construction exceeds 100 million dollars, with a period of performance from February 1, 2027, to February 1, 2030, and a revised assumed Notice to Proceed date of April 1, 2027. The government will utilize a multi-factor, best-value tradeoff process for award, evaluating proposals based on technical experience, technical approach, management approach, key personnel experience, and price. Key personnel requirements include a Project Manager, Construction Superintendent, Quality Control Manager, Safety Specialist, and Historic Preservation Treatment Specialist. Contractors must provide performance and payment bonds and adhere to union prevailing wage rates. Technical requirements emphasize strict cybersecurity hygiene for SCADA/MES equipment, granting the government full access to software source code, and compliance with ADA standards. Invoicing is managed electronically through the U.S. Department of the Treasury's Invoice Processing Platform, requiring a draft review by the Contracting Officer's Representative seven days prior to final submission.
Dsc Contracting Services Division

POSTED

about 24 hours ago

DEADLINE

in 21 days
NAICS: 221320
Federal
Operations and Maintenance (O&M) Services for the SBIWTP
Solicitation # 191BWC26R0009
Solicitation 191BWC26R0009, issued by the International Boundary and Water Commission, seeks a contractor to provide Firm Fixed Price Operations and Maintenance (O&M) services for the South Bay International Wastewater Treatment Plant (SBIWTP) in San Ysidro, California. The contract is structured with a base year running from June 1, 2027, to May 31, 2028, and multiple option years extending through May 2031. A primary objective of the scope is managing plant operations, SCADA systems, and maintenance during the facility's expansion from 25 MGD to 50 MGD. The contractor must ensure 24/7 staffing, including a bilingual operator, and maintain strict compliance with the National Pollutant Discharge Elimination System (NPDES) permit and other regional water quality board regulations. Award will be based on the Highest Technically Rated with a Fair and Reasonable Price method, where non-price factors—such as plant operations, permit compliance, and staffing—are significantly more important than cost. Key requirements include the designation of a Project Manager, Superintendent, Site Safety and Health Officer, SCADA Specialist, and Asset Manager. The contractor is responsible for a wide array of deliverables, including a Phase-In Plan, Preventative Maintenance Plan, and monthly performance reports. Security is a high priority, requiring background investigations for personnel and adherence to NIST standards for protecting Controlled Unclassified Information. Performance will be monitored via a Quality Assurance Surveillance Plan focusing on regulatory compliance, uptime, and effluent quality.
Internat Boundary And Water Commission

POSTED

8 days ago

DEADLINE

in 2 months
NAICS: 221320
Federal
Waste Water Treatment Plant Services
Solicitation # FA448627Q0002
Solicitation FA448627Q0002 is a Request for Quotation issued by the Department of the Air Force for Waste Water Treatment Plant Services at Lajes Field in Praia da Vitoria, Azores, Portugal. The contractor will be responsible for the operation and maintenance of a waste water treatment plant with a capacity of 800,000 gallons per day, as well as the associated lift station, oil-water separator, and grease traps. Key requirements include providing a Lead Operator with a Level II or higher WPI Certification and at least three years of experience, implementing a 52-week preventive maintenance plan, and ensuring compliance with ISO/IEC 17025 laboratory standards and Portuguese decree law 183/2009 for waste landfills. The scope also encompasses corrosion control, painting, and the management of hazardous materials. The government intends to award a single Firm-Fixed-Price contract with a total duration not to exceed 66 months, consisting of a base period and four option periods. This is an unrestricted acquisition, and proposals must be submitted electronically by November 23, 2026, at 14:00 Azores Time. Offers are evaluated through a three-step sequential process: an administrative compliance review, a technical acceptability evaluation based on experience, approach, and a quality control plan, and finally a price evaluation in Euro currency. Award is contingent upon the availability of funds. Payments will be processed electronically via the Wide Area WorkFlow system.
FA4486 765 Abs Conf

POSTED

16 days ago

DEADLINE

in 26 days

General Info

Place of Performance

CA, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Palm Springs
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
The City of Palm Springs is requesting statements of qualifications from qualified professional firms to provide the City with On-Call Wastewater Engineering Design Services and related services as may be requested by the City for various City projects as may be assigned. This solicitation aims to hire one or more on-call firms to provide such services to the City. The City may assign projects at its sole discretion. The City, at its sole discretion, may select only one firm, or more than one firm, to provide the requested services.It will be the responsibility of the successful firm(s) to determine the necessary staffing level required to perform the scope of service as may be required for a project when assigned. The City will not provide dedicated workspace or office space, city staff or city resources, printing or copying services, or clericalassistance in the performance of this agreement. The City reserves the right to perform any portion of the scope of work with City personnel and/or by other Consultants. The City may assign projects at its sole discretion. Responsibilities may include, but are not limited to, the following:A. Improving wastewater infrastructure, such as pipelines and manholes.B. Treatment process optimization and upgrade of facilities.C. Assess the impacts of emerging contaminants in source waters on water and wastewater treatment plant compliance and public health.D. Preparation of Contract Documents for bidding purposes including final plans, specifications, cost estimates, constructability reviews to determine contract duration, and necessary addenda.E. Construction support services, including review and approval of shop drawings, respond to Request for Information, periodic progress meetings, and field consultation as necessary. Provide specialty construction engineering observations as requested.F. Environmental clearance for CEQA/NEPA.G. Other duties as requested by the City Engineer.

More opportunities from California → City of Palm Springs

Same awarding agency

NAICS: 237310
SLED
East Palm Canyon Bridge Project
Solicitation # 12-04
The East Palm Canyon Bridge Project (City Project No. 12-04) is a construction solicitation by the City of Palm Springs, California, for the widening and rehabilitation of the East Palm Canyon Drive Bridge and surrounding infrastructure. The scope of work is divided into three phases, encompassing bridge and roadway widening, architectural treatment and lighting, the construction of a bus pad, retaining walls, and a soundwall, as well as storm drain improvements and the relocation of an SCE capacitor bank. Additional add-alternate work includes expanded cold plane and overlay limits, water valve adjustments, and survey monument reestablishment. The project is estimated at 12 million dollars for the base bid and 380,000 dollars for the add-alternate work, with a total performance period of 350 working days from the date of the Notice to Proceed. The contract is governed by the 2024 Greenbook Standard Specifications for Public Works Construction and the 2021 Caltrans Standard Specifications. Award will be based primarily on the lowest overall cost to the City, provided the bidder is responsive and responsible. Key compliance requirements include adherence to the Davis-Bacon Act for prevailing wages, Buy America standards for materials, and strict environmental restrictions, specifically prohibiting construction equipment in the Palm Canyon Wash during the Casey’s June Beetle flight season from March 1 through June 30. Bidders must submit all documentation electronically and provide a bid bond, with the requirement to replace the performance bond with a warranty bond for 25 percent of the final contract price upon completion.
Highway, Street, and Bridge Construction

POSTED

8 days ago

DEADLINE

in 23 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS