On-Site Power Generation Services

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract entails the provision and operation of mobile generator sets to deliver reliable power for equipment and operations at remote mining and reclamation sites within San Bernardino County, California, specifically in the 92332 zip code area. The services are classified under NAICS code 221112, indicating a focus on electric power generation, transmission, and distribution, with the contract structured as a subcontract to support infrastructure needs in challenging, off-grid environments. The work requires continuous operational support to maintain power integrity for critical machinery, safety systems, and site logistics during active mining and environmental restoration activities. The contract was posted on June 5, 2026, and is administered by San Bernardino County under the California state framework, though no specific agency organization name or point of contact is provided. The place of performance is designated as a remote location where grid connectivity is unavailable, necessitating self-sustaining, mobile power solutions that can withstand harsh conditions and extended operational cycles. There is no set-aside designation specified, meaning the contract is open to all eligible bidders without preference based on size, ownership, or other classification. The official reference link directs to a public project portal for further details, but no additional procurement terms or performance metrics are included in the provided data.

General Info

Mobile generator sets to provide off-grid power for mining and reclamation sites in San Bernardino County, California.

Agency

California → San Bernardino County

Place of Performance

CA, 92332

Set-Aside

NONE

Documents

This scope was carved out of PROJ-2024-00123.

The full solicitation package (7 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

PROJ-2024-00123 Skanska Essex Sand & Gravel Mine

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Bernardino County
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → San Bernardino County
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Provision and operation of mobile generator sets to supply power for equipment and operations at remote mining and reclamation sites.

Similar Contracts

Same NAICS industry code

NAICS: 221112
New
Federal
SPE60427R0400 - MISO 2027
Solicitation # SPE60427R0400
Solicitation SPE60427R0400 is a request for proposal issued by DLA Energy for a Firm Fixed-Price Requirements Type contract to supply electricity, including ancillary and incidental services, to various Department of War and Federal Civilian facilities within the Midcontinent Independent System Operator (MISO) market area. The scope covers four specific locations: the Army Corps of Engineers, Scott Air Force Base, the US Department of Agriculture-National Center for Agriculture Utilization Research, and the Illinois Air National Guard. The contract features a 24-month delivery period starting from the May 2027 meter read date through the May 2029 meter read date, with a total estimated quantity of 240,033,144 kWh across four contract line item numbers. The award will be based on the best value, considering price and non-price factors. Past performance is the most critical non-price factor, followed by technical capability and risk, and finally small business participation. Price is weighted approximately equal to the combined non-price factors. Proposals must be submitted through the PIEE Solicitation module, and pricing will be handled via a reverse auction at a later date. Offerors must maintain active SAM registration and provide a Unique Entity Identifier and CAGE code. The contract incorporates standard commercial terms under FAR 52.212-4 and includes specific requirements for HUBZone and small business preferences, as well as Buy American and domestic commodity certifications.
DLA Energy

POSTED

3 days ago

DEADLINE

in about 1 month
View Details
NAICS: 221112
SLED
Northtown Backup Generating Facility
Solicitation # 25-SPPE-02
The Northtown Backup Generating Facility is a 97.3 megawatt diesel-fired emergency power system designed to provide uninterrupted backup power exclusively to the Northtown Data Center in San José, California, without any connection to the transmission or distribution grid. Located on a 28.5-acre site at the southwest corner of West Trimble Road and Orchard Parkway on APNs 101-02-018 and 101-02-021, the facility will consist of 42 diesel generators—40 rated at 3 megawatts each and two smaller units at 1.75 megawatts—arranged in two generation yards adjacent to the data center buildings. Of the 3-megawatt units, eight are designated as redundant to ensure reliability. The two smaller generators will support office loads, building systems, and life safety services. The facility will include a new 115-kilovolt to 34.5-kilovolt, 110-megavolt-ampere electrical substation with a two-bay, two-transformer design, allowing one transformer to be taken offline without loss of service, effectively providing 105 megavolt-amperes of redundancy. On-site diesel fuel storage capacity is 234,000 gallons, and the generators will operate using renewable diesel fuel to minimize emissions and comply with sustainability mandates. The project is subject to comprehensive environmental review under the California Environmental Quality Act and requires permits from the Bay Area Air Quality Management District, the City of San José, the California Department of Fish and Wildlife, and the Federal Aviation Administration for structure height compliance. It must also participate in San José Clean Energy’s Total Green program to ensure 100 percent carbon-free electricity use. The California Energy Commission is the lead agency overseeing the project and has determined it qualifies for an exemption under Public Resources Code §25541. All generators must meet Tier 4 emissions standards with controls for nitrogen oxides and diesel particulate matter. Environmental mitigation measures include noise reduction, wildfire risk management, and protection of biological and cultural resources, with preconstruction surveys mandated. The project is currently in the environmental review phase, with a public comment period scheduled from July 21 to August 20, 2026. No procurement or contract pricing details are available, and while the project is not governed by federal acquisition regulations, compliance with state and local environmental, zoning, and safety codes
Energy Commission

POSTED

3 months ago

DEADLINE

N/A
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS