Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Nebraska was posted on November 13, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

OPW 54423: 156th Street Bridge North Bank Repair

Closed
CI-2024-0378State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground utilities such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, subsurface investigation, shoring, and site clearing. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with environmental support services including SWPPP and quality control. Kiewit is specifically seeking qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Furthermore, Kiewit prioritizes bidders who can demonstrate an ability to maintain labor harmony on the project. Interested firms must contact Lead Estimator Ken Johnston to receive an Invitation to Bid through the Building Connected electronic system. The deadline for bid submissions is November 18, 2025, at 2:00 p.m.
Kiewit Infrastructure West Co.

POSTED

about 2 hours ago

DEADLINE

in 7 days
NAICS: 237310
New
SLED
RFB-PARKS-MISSISSIPPI RIVER BLVD RETAINING WALLS REBID
Solicitation # 1777
The City of Saint Paul Parks Department is soliciting bids for the Mississippi River Blvd Trail Improvement Project, which involves the removal and reconstruction of retaining walls, trails, and fencing near Princeton Avenue. The scope of work includes the removal of existing Loffelstein walls and bituminous walks, the installation of soldier pile walls with galvanized steel bridge plank lagging, and the paving of a new bituminous trail. The base bid must include an ADA trail transition to connect to the existing trail. Key deliverables include site protection, erosion control, and the installation of concrete pile caps and structural backfill. The contract will be awarded to the lowest responsible base bidder based on an evaluation of their experience, financial resources, and technical capabilities. Bidders must submit their responses via the City of Saint Paul Supplier Portal by December 9, 2026, using the required Excel bid form. Mandatory compliance requirements include adhering to the City of Saint Paul Little Davis-Bacon prevailing wage standards and Affirmative Action/Equal Employment Opportunity specifications. Upon award, the successful contractor must provide performance and payment bonds, certificates of insurance, and human rights compliance documentation. The work is subject to a one-year guarantee from the date of substantial completion.
City of Saint Paul

POSTED

about 10 hours ago

DEADLINE

in 28 days
NAICS: 237310
New
SLED
RFB-PW-SAINT ANTHONY MILL&VERLAY 2026
Solicitation # 1785
The City of Saint Paul Parks Department is soliciting bids for the 2026 Saint Anthony Mill and Overlay project, located along Saint Anthony Avenue and Rondo Avenue between Snelling Avenue and Marion Street. The scope of work focuses on pavement resurfacing via a standard 2-inch mill and overlay, as well as significant pedestrian and safety enhancements. Key deliverables include the construction of curb extensions, ADA-compliant pedestrian ramps, concrete curb replacement, storm sewer installation, and the paving of off-street bike paths. All work must adhere to the City of Saint Paul Department of Public Works governing specifications and the 2026 MnDOT Schedule of Materials Control. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit all documentation through the City of Saint Paul Supplier Portal by December 7, 2026, at 2:00 PM CST. Required financial protections include a performance bond and a payment bond, each equal to 100% of the contract amount, and general liability insurance with a $1,500,000 per occurrence limit. The project is subject to the Little Davis-Bacon Ordinance regarding prevailing wages and includes a Vendor Outreach Program to encourage the participation of local small, woman-owned, and minority-owned businesses. Contractors must also provide a signed statement under oath verifying compliance with minimum criteria per Minnesota Statutes.
City of Saint Paul

POSTED

about 10 hours ago

DEADLINE

in 26 days

AI Contract Overview

Show more

The contract OPW 54423 pertains to the repair of ongoing scour at the north pier of the 156th Street bridge, located approximately 300 feet south of West Center Road in Omaha, Nebraska. The project is scheduled to commence with an anticipated Notice to Proceed date of February 10, 2025, and involves addressing structural issues caused by scour at the bridge's north pier to ensure its stability and safety. Bidders are invited to submit their proposals in response to the solicitation, which is managed by Douglas County under the Nebraska organization, with a project size estimated between $500,000 and $1,500,000. The contract requires a bid bond, certified check, or equivalent security, issued by a Nebraska-licensed surety or recognized financial institution, with original documents due within seven days of bid closing. The procurement process emphasizes compliance with bid submission protocols, including the upload of bid bonds and adherence to specified deadlines. The project does not include a Small and Disadvantaged Business Enterprise (SBE) reserve, and the response deadline is December 4, 2024. This contract is part of the county’s ongoing infrastructure maintenance efforts, ensuring the structural integrity of key transportation routes in the region.

General Info

Place of Performance

NE, USA

Set-Aside

NONE

Documents

8
XLSX, High priority: read this firstbid-submittal
High
PDF, High priority: read this firstrfb
High
XLSX, High priority: read this firstparticipation-disclosure
High
XLSX, High priority: read this firstcompliance-form
High
PDF, High priority: read this firstaffidavit
High
PDF, High priority: read this firstitb
High
XLSX, Low prioritycertificate-of-compliance
Low
XLSX, Low prioritybid-bond
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNebraska → Douglas County
ContactsNo contacts available
OfficeN/A
Organization / AgencyNebraska → Douglas County
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
OPW 54423: 156th Street Bridge North Bank Repair:  City of Omaha is requesting bids from qualified companies, herein called Bidder, Contractor, Vendor, Supplier, or other pronouns used in their place, for all work and/or goods set forth in the specifications.  
SCOPE:  This project involves the repair to ongoing scour at the north pier of the 156th Street bridge approximately 300 feet south of West Center Road.  
Anticipated Notice to Proceed date:   Monday, 2/10/2025   This bid does not have an SEB reserve.
Requirement for Bid Bond:  The surety company issuing the bid bond should be licensed by the State of Nebraska and listed on the current edition of Circular 570 of the United States Department of the Treasury.  Acceptable substitutes for a bid bond: a certified check, an official bank check, a cashier's checks drawn on a national bank or a bank chartered under the laws of the state, payable to City of Omaha, or lawful money of the United States, or a United States Government Bond (negotiable).  LETTERS OF CREDIT ARE NOT AN ACCEPTABLE SUBSTITUTE FOR A BID BOND AND WOULD BE CAUSE FOR REJECTION OF BID.   The bid bond amount is listed in the Attributes section.
A copy of the bid bond/acceptable substitute shall be uploaded in the Response Attachments section.  The original document must be received by the City Clerk, 1819 Farnam Street LC-1, Omaha-Douglas Civic Center, Omaha, NE 68183 within seven (7) calendar days of the closing date and time indicated.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS