This Solicitation opportunity from Florida was posted on January 10, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The contract titled "Orange Camp Road and Martin Luther King Jr. Boulevard Intersection Improvements" involves the widening of a roundabout from 2 to 4 lanes at a key intersection in Florida. Issued by the Engineering & Construction department under the State and Local Entity Division (SLED) in Florida, the solicitation (number 25-B-36SR) was posted on January 10, 2026, with a response deadline set for February 12, 2026. The work will be performed in Florida, with project management and procurement contacts based in DeLand, FL. The primary point of contact for the project is Dennisse Zornan, a Civil Engineer II and Project Manager, while Shaira Resto serves as the Procurement/Contracts Manager.
Bidders are required to complete a Prime/Subcontractor form detailing all subcontractors involved, including their company details, scope, and percentage of work. This ensures local bid preference considerations and confirms that subcontractors hold necessary licenses. The prime contractor retains responsibility for subcontractor compliance and must obtain prior approval for any subcontractor changes from the county project manager. The solicitation focuses on improving traffic flow and safety by upgrading the intersection infrastructure with lane widening, ensuring enhanced capacity and operational efficiency.
General Info
Widen roundabout from 2 to 4 lanes at Florida’s Orange Camp Road and MLK Jr. Boulevard intersection.
HighAI Summary for 25-B-36SR: Orange Camp Road and Martin Luther King Jr. Boulevard Intersection Improvements: Invitation for Bid (IFB) issued by Volusia County for the construction of intersection improvements at Orange Camp Road and Martin Luther King Jr. Boulevard, featuring a roundabout and 2-4 lane widening. Released January 11, 2026, with a response deadline of February 12, 2026. The estimated construction cost is $703,592.62 with a total contract time of 230 days.
PDF
PDF, High priority: read this first63 pages · contract-document
HighAI Summary for Construction Contract C2013 for Orange Camp Road and MLK Jr Boulevard Intersection Improvements: This document is a construction contract (Contract No. C2013, ITB No. 25-B-36SR) between the County of Volusia and a contractor for the Orange Camp Road and MLK Jr Boulevard intersection improvements project. It includes detailed articles covering contract documents, permits, contractor services, scope of work, compensation, personnel, insurance, dispute resolution, termination, liability, government compliance, and miscellaneous provisions. The contract is federally funded under a Local Agency Program and requires compliance with federal procurement and construction guidelines. The document incorporates exhibits such as general and special conditions, bid documents, plans, technical specifications, and wage rates. The contract emphasizes contractor responsibilities, project site conditions, and compliance with permits and laws.
PDF
PDF, High priority: read this first42 pages · general-conditions
HighAI Summary for Exhibit A General Conditions 25-B-36SR: This document is Exhibit A titled 'General Conditions' for contract number 25-B-36SR. It includes a detailed table of contents covering definitions, preliminary matters, contract document interpretation, insurance and bonds, contractor responsibilities, county rights, changes in work, contract price and time adjustments, warranties, payments, suspension and termination, dispute settlement, and miscellaneous provisions. The document defines key terms used throughout the contract such as Acceptance, Affidavit, Bid Documents, Change Order, Contractor, County, and others, establishing the legal and procedural framework for contract execution and administration.
PDF
PDF, High priority: read this first1 page · special-conditions
HighAI Summary for Exhibit B Special Conditions 25-B-36SR: This document is Exhibit B titled 'Special Conditions' for project 25-B-36SR. It supplements the general conditions without replacing or deleting them. The content includes project sign standards specifying materials and construction details for signage, such as exterior grade plywood, white background with black lettering, and pressure treated support posts. The document also references approval by county standards and construction engineer, with a revision date of 02-11-03.
PDF
PDF, High priority: read this first7 pages · insurance-requirements
HighAI Summary for Exhibit C Insurance Requirements 25-B-36SR: This document, Exhibit C Insurance Requirements for contract 25-B-36SR, details the types and minimum limits of insurance coverage the Contractor must maintain during the contract term. It includes requirements for Workers Compensation, Commercial General Liability, Auto Liability, and Excess Liability policies with specific coverage limits and conditions such as waiver of subrogation, additional insured status for the County and FDOT, and notification of cancellation. The document also outlines conditions for subcontractors, claims-made policies, risk retention groups, and disposal site insurance. It serves as a critical contractual exhibit ensuring the Contractor's compliance with insurance obligations to protect the County and related parties.
PDF
PDF, High priority: read this first22 pages · bid-documents
HighAI Summary for Exhibit C Required Bid Documents 25-B-36SR: This document, titled Exhibit C Required Bid Documents 25-B-36SR, serves as a comprehensive checklist and instruction set for bidders submitting proposals for the Orange Camp Road and MLK Jr. Boulevard Intersection Improvements project. It includes mandatory forms such as bid proposals, bid bonds, certifications regarding debarment and scrutinized companies, proof of insurance, and compliance with FDOT DBE and Equal Opportunity requirements. The document emphasizes the importance of using the provided forms without alteration and outlines consequences for non-compliance or submission of false certifications. It also details good faith efforts for DBE compliance and provides an important notice regarding insurance and bond requirements upon award recommendation. The document is critical for ensuring responsive and compliant bid submissions.
PDF
PDF, High priority: read this first28 pages · specifications
HighAI Summary for Exhibit E LAP Division 1 Specifications FY 2526: This document, titled 'Exhibit E LAP Division 1 Specifications' and revised on 6-27-24 with a further update on 8-23-24 for fiscal year 2025-26, provides construction checklist specifications from the Department of Transportation Standard Specifications for Road and Bridge Construction. It includes definitions and terms related to engineering roles, such as Contractor's Engineer of Record and Specialty Engineer, outlining qualifications and responsibilities. The scope of work section details procedures for alteration of plans or character of work, including allowable costs for extra work with specific payment guidelines for labor, materials, supplies, and equipment. The document references compliance with the Local Programs Manual and Federal and State requirements, serving as a technical guide for construction contracts under the Local Agency Program.
PDF
PDF, High priority: read this first19 pages · technical-specifications
HighAI Summary for Exhibit F - Volusia County Roadway Technical Specifications 25-B-36SR: This document, dated August 11, 2025, is Exhibit F containing the Volusia County Roadway Technical Specifications for project 25-B-36SR. It outlines detailed technical requirements and revisions to the Florida Department of Transportation (FDOT) Standard Specifications for Road and Bridge Construction. Key sections include Mobilization/Demobilization, Maintenance of Traffic and Dust Abatement, Clear and Grubbing, Excavation and Embankment, Optional Base Course materials, and Superpave Asphalt Concrete specifications. The document specifies payment terms, construction sign requirements, traffic control measures, and material standards essential for project execution.
PDF
PDF, High priority: read this first24 pages · contract-plans
HighAI Summary for Exhibit G - Contract Plans and Tabulation of Quantities for Volusia County Road Project 454286-1-58-01: This document, titled Exhibit G, contains the contract plans and tabulation of quantities for the Volusia County road project 454286-1-58-01 involving Orange Camp Road and Dr Martin Luther King Jr Beltway roundabout. It includes detailed roadway plans, signing and pavement marking plans, temporary traffic control plans, overhead sign cross sections, mast arm data, and verified utility locates. The plans adhere to Florida Department of Transportation standards and Volusia County technical specifications dated August 11, 2025. Key content includes pay item quantities, traffic control notes, mast arm assembly data, and foundation notes based on geotechnical borings. The engineer of record is William R. Lyon, PE, and the document supports construction and traffic management for the project.
PDF
PDF, High priority: read this first6 pages · wage-determination
HighAI Summary for Exhibit H Wage Rate Table 010226 25-B-36SR: This document is a wage determination for highway construction projects in Volusia County, Florida, effective January 2, 2026. It supersedes the previous wage determination FL20250274 and includes detailed prevailing wage rates and fringe benefits for various construction labor classifications such as carpenters, electricians, laborers, operators, and truck drivers. The document also references applicable Executive Orders 13706 and 13658 regarding paid sick leave and minimum wage requirements for federal contractors. It provides identifiers for union, union average, survey, and state adopted rates, explaining their significance and update procedures.
XLSX
XLSX, High priority: read this firstitb
HighAI Summary for ITB 25-B-36SR - Exhibit C Bid Form: Bid Tab/Bid Form for Volusia County ITB No. 25-B-36SR (Contract No. C2013) regarding the Orange Camp Road and Dr. MLK Jr. Intersection Improvement. The document contains a detailed bid schedule with pay items for mobilization, traffic maintenance, signage, and thermoplastic markings.
XLS
XLS, High priority: read this first1 page · prime-subcontractor-form
HighAI Summary for ITB 25-B-36SR Prime-Subcontractor Form for Contractors: This document is the Prime-Subcontractor Form associated with Invitation to Bid (ITB) number 25-B-36SR. It requires bidders to list all subcontractors proposed for the project, including company names, addresses, dollar values, and percentages of work performed. The form emphasizes that failure to complete and return it will result in a non-responsive bid. It also mandates that the prime contractor ensures all subcontractors hold appropriate licenses and that any changes to subcontractors require prior approval from the County Project Manager. The form includes instructions for completing dollar values assigned to each contractor, ensuring totals match the Total Base Bid and sum to 100%. This form is critical for bid submission compliance and subcontractor disclosure.
XLS
XLS, High priority: read this first1 page · prime-sub-form
HighAI Summary for ITB No. 25-B-##XX Prime/Subcontractor Form: This document is a Prime/Subcontractor Form associated with ITB No. 25-B-##XX, version dated January 15, 2025. It requires bidders to list all subcontractors proposed to perform work on the project, including company names, addresses, dollar values, and percentage of work performed. The form emphasizes that failure to complete and return it may result in a non-responsive bid. It also notes that the prime contractor is responsible for ensuring subcontractors hold appropriate licenses and that any changes require prior approval from the County Project Manager. The form is used to determine local bid preference and includes instructions for self-performing primes and subcontractor disciplines.
PDF
PDF, High priority: read this first24 pages · contract-plans
HighAI Summary for Orange Camp MLK Roundabout Signing and Marking Plans 100%: This document contains the 100% complete signing and pavement marking plans for the Orange Camp Road and Dr Martin Luther King Jr Beltway Roundabout project (Project No. PC3413) in Volusia County, Florida. It includes an index of roadway plans, tabulation of quantities, general notes, temporary traffic control plans, overhead sign cross sections, and verified utility locates. The plans are governed by Volusia County Technical Specifications (August 11, 2025), Florida Department of Transportation Standard Plans FY 2025-26, and other applicable federal, state, and local standards. The document is digitally signed and sealed by professional engineers responsible for various components. It provides detailed construction standards, specifications, and quantities for mobilization, traffic maintenance, steel mast arm assemblies, rapid flash beacons, ground sign assemblies, and thermoplastic markings. The design speed is 40 MPH.
DOCX
DOCX, High priority: read this first1 page · rfb
HighAI Summary for Orange Camp Rd & MLK Jr Blvd Intersection Improvements Construction Bid Request: This document is a construction bid request for the Orange Camp Road and MLK Jr. Boulevard Intersection Improvements project. It includes key project details such as location, engineer's estimate of $703,600, required performance and payment bonds, project completion timeline of 115 days, liquidated damages of $1,685 per day, and contract type as unit price. It specifies required permits from SJRWMD, FDOT, and FDEP NPDES, and notes a pre-bid conference meeting. The document also highlights grant involvement and the need to attach required documents including scope of services, technical specifications, drawings, permits, and bid forms.
PDF
PDF, High priority: read this first2 pages · performance-payment-bond
HighAI Summary for Performance and Payment Bond for Orange Camp Road and MLK Jr. Boulevard Intersection Improvements: This document is a Performance and Payment Bond related to the County Contract No. C2013 for the Orange Camp Road and MLK Jr. Boulevard Intersection Improvements project in DeLand, Florida. It complies with Section 255.05 of the Florida Statutes and binds the Contractor and Surety to the County of Volusia for payment and performance obligations. The bond ensures the Contractor will perform the contract, make prompt payments to claimants, indemnify the Owner for losses due to Contractor default, and guarantee the work and materials as specified. It includes provisions for changes to the contract and legal requirements for claim actions. The document requires signatures and seals from the Contractor, Surety, and witnesses.
PDF
PDF, High priority: read this first14 pages · ifb
HighAI Summary for Volusia County Bid 25-B-36SR Orange Camp Road and MLK Jr. Blvd Intersection Improvements: This Invitation for Bid (IFB) from Volusia County, Florida, solicits bids for the Orange Camp Road and Martin Luther King Jr. Boulevard Intersection Improvements project in DeLand, Florida. The bid number is 25-B-36SR with contract number C2013. The estimated construction cost is $703,592.62, and the total contract time is 230 days. Bids are due by 3:00 p.m. local time on February 12, 2026, and must be submitted electronically via the County's new E-Bid/RFx software powered by OpenGov. A pre-bid meeting is scheduled for January 21, 2026. The document includes detailed instructions to bidders, bid bond requirements, rights reserved by the County, and compliance with ADA and public records laws. The document emphasizes the bidder's obligation to inform itself of all project conditions and the County's right to reject any or all bids.
PDF
PDF, High priority: read this first231 pages · ifb
HighAI Summary for Volusia County Bid 25-B-36SR Orange Camp Road and MLK Jr. Blvd Intersection Improvements: This Invitation for Bid (IFB) document, Bid No. 25-B-36SR, Contract No. C2013, issued by Volusia County, Florida, solicits bids for the Orange Camp Road and Martin Luther King Jr. Boulevard Intersection Improvements project in DeLand, Florida. The bid due date is February 12, 2026, with a total contract time of 115 days and an estimated construction cost of $703,592.62. The document includes instructions for bidders, bid bond requirements, a pre-bid meeting notice, and compliance with ADA and public records laws. It emphasizes electronic bid submission via OpenGov and outlines the County's rights regarding bid acceptance and contract award.
XLSX
XLSX, Low priority2 pages · bid-tab
LowAI Summary for FDOT LAP OC MLK Roundabout Bid Tab 454286-1-58-01: This document is a bid tabulation for the FDOT LAP Orange Camp Road at Dr MLK Jr Beltway Roundabout project, identified by Financial Project ID 454286-1-58-01 and Federal Aid No. D524-091-B. It lists various bid items including mobilization, maintenance of traffic, signing and pavement marking, steel mast arm assemblies, rapid flashing beacons, ground sign assemblies, and thermoplastic markings. Quantities and units are provided, but cost per unit and total cost values are zero or not listed. The document serves to summarize bid items and quantities for the project.
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.