Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Orr Springs Road Fuels Reduction Project

Forecast
2025-E0079State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Orr Springs Road Fuels Reduction Project, managed by Mendocino County under solicitation 2025-E0079, aims to establish emergency ingress and egress routes by creating a shaded fuel break extending 30 feet from the road edge. The project is divided into two alignments: Alignment 1 from Ukiah to Orr Springs and Alignment 2 from Comptche to Ukiah. The primary objectives are to improve road visibility for residents and emergency traffic, enhance forest health and resilience by removing excess fuel loads, and preserve biodiversity. This project is classified as a statutory exemption under California Public Resources Code Section 21080.49(b) as a defensible space fire clearance project for a public roadway serving a community of 30 or more dwelling units. Technical specifications require the removal of shrubs and trees with a diameter of 10 inches or less, measured at four and a half feet above the ground. Trees exceeding 10 inches in diameter must be pruned to 6 feet above the ground and 15 feet above the paved road surface. Work will be performed using manual and manual-mechanical methods to avoid ground disturbance, with cut materials dragged by hand to a chipper for on-site broadcasting or hauling. All operations must comply with Mendocino Department of Transportation traffic control requirements. Administrative oversight is provided by Christy Gard and Julia Krog, with the project located within the cities of Ukiah and Comptche in California.

General Info

Mendocino County fuels reduction project creating shaded fuel breaks along Orr Springs Road.

Agency

California → Mendocino County

Place of Performance

Ukiah, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Mendocino County
Contacts2 people available
OfficeN/A
Organization / Agency
California → Mendocino County
Office AddressN/A
Contacts
Christy GardAdministrative Analyst

Full Description

Show more
Notice of Exemption for Orr Springs Road Fuels Reduction Project. The goals of the project are to establish emergency ingress and egress routes by creating a shaded fuel break 30 feet from the road edge. Benefits of this project will also include preservation of biodiversity, improvement of forest health and increased forest resilience by removing excess fuel loads. Improvements to road visibility will benefit residents of the project area and traffic on Orr Springs and Comptche-Ukiah Roads during emergencies. The project area is within 30 feet of the road in two alignments. Alignment 1 is from Ukiah to Orr Springs and Alignment 2 is Comptche to Ukiah. Project specifications prescribe the removal of shrubs and trees 10 inches in diameter at four and half feet above the ground and smaller. Trees larger than 10 inches in diameter will be pruned to 6 feet above the ground, and 15 feet above the paved surface of the road. Work will be completed using manual and manual-mechanical treatment methods (no ground disturbing activities are proposed). Cut material will be dragged by hand to a chipper. Chips will be broadcast on-site or hauled to an appropriate location. Hand crews will use chainsaws, pole-saws, hand tools, and all broadcast chipping will be done from established roads away from drainages and watercourses. Operations will comply with local traffic control requirements defined by the Mendocino Department of Transportation.

Similar Contracts

Same NAICS industry code

NAICS: 561730
New
SLED
Parks and Recreation Maintenance Mowing Group 1
Solicitation # 270180
The City of Tucson is soliciting proposals for a term contract to provide professional mowing, string trimming, and edging services for Parks and Recreation Maintenance Group 1. This solicitation, number 270180, requires contractors to be licensed landscape contractors (B-3, B-5) and to provide all necessary labor, equipment, and materials. The scope of work includes maintaining various sites, such as Abraham Lincoln Park and Reid Park Annex Fields, with seasonal frequencies requiring weekly service from May through September and monthly service from October through April. Contractors must implement a comprehensive quality control program, submit weekly performance reports, and adhere to strict guidelines regarding chemical applications and equipment use. The contract is subject to extensive regulatory and federal compliance mandates, including HUD and FTA terms, ARPA requirements, and Davis-Bacon prevailing wage rates. Key obligations include adherence to the Americans with Disabilities Act, non-discrimination policies, and stringent cybersecurity frameworks such as NIST and ISO/IEC 27001. Proposals must be submitted via the City's online procurement portal by November 12, 2026, and must include a pricing proposal, a signed Offer and Acceptance form, and a valid business license. Evaluation may include interviews and investigations into the offeror's financial stability and competence.
Parks and Recreation

POSTED

about 4 hours ago

DEADLINE

in 11 days
View Details
NAICS: 561730
New
SLED
Blue Heron Golf Course Grounds Maintenance Five Year Contract
Solicitation # BPM059646
The County Commissioners of Queen Anne's County are soliciting proposals for a five-year grounds maintenance contract at the Blue Heron Golf Course in Stevensville, Maryland, spanning from January 1, 2027, to December 31, 2031. The selected contractor will be responsible for comprehensive turf care, including mowing, fertilizing, weed control, and aeration of tees, greens, fairways, and roughs, as well as bunker maintenance, light tree pruning, and the operation and repair of the irrigation system. The contractor must provide all necessary equipment and maintain the surrounds of the maintenance building, while the owner will provide the maintenance shop area and cover electrical costs for the irrigation system. Proposals will be evaluated based on price and experience, with a mandatory requirement that the contractor or their principal representatives possess at least six years of experience as a golf course superintendent. Submissions must be delivered in three paper-bound hard copies by December 1, 2026, and must include a qualification statement, fee summary, disclosure form, and SDAT registration. Special consideration may be given to local vendors who allocate 50 percent or more of the bid value to businesses within Queen Anne's County. Quality standards will be verified through monthly meetings, and any disputes regarding maintenance quality will be arbitrated by representatives from the University of Maryland's College of Agriculture and Natural Resources.

POSTED

about 5 hours ago

DEADLINE

in 25 days
View Details
NAICS: 561730
New
SLED
Lot Mowing and Trash/Debris Removal and Disposal Services
Solicitation # 26-TG01452
Solicitation 26-TG01452 is an Invitation to Bid issued by Hernando County, Florida, for as-needed lot mowing and trash/debris removal and disposal services. The contract will primarily support the Code Compliance Department for non-grant related work, with potential use by the Housing and Supportive Services Department for projects tied to Community Development Block Grants. Services are to be performed at various unimproved lots and residential or commercial improved properties throughout the county. Key performance standards require grass to be cut to a height of three inches, with bush hogging utilized for field grasses. All collected debris must be disposed of at the Hernando County Northwest Waste Management Facility, and contractors must provide individual weight slips and dump charges with their invoices as proof of compliance. This is a Firm Fixed Price term contract with bids submitted electronically via the eProcurement Portal by November 9, 2026. Evaluation is based on price, completeness, compliance, and the bidder's resources, including a mandatory list of equipment and personnel. Required equipment includes a commercial mower, a bush hog or tractor, and a truck and trailer capable of hauling 1,000 pounds. The county reserves a local preference for tie-breaking in favor of businesses located within Hernando County. Awarded vendors must undergo an equipment inspection by Code Enforcement before the intent to award is finalized. Administrative requirements include invoicing within ten business days of work completion, with payments made via ACH in no less than forty-five days. The contract incorporates various federal and state regulations, including the Davis-Bacon Act for prevailing wages, the Build America, Buy America Act, and specific record retention requirements of three years for federal grant funding. Contractors must adhere to standard work hours of Monday through Friday, 7:00 AM to 3:00 PM, and provide a current certificate of insurance before commencing work. Bidders are required to submit at least three references from similar projects completed within the last seven years.
Code Enforcement

POSTED

about 7 hours ago

DEADLINE

in 3 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS