Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on July 10, 2017. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Orwell Dam Worm Gear Boxes

Awarded
W912ES-17-T-0095Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333612
New
DIBBS
SPROCKET WHEEL
Solicitation # SPE7L4-27-T-0714
Solicitation SPE7L4-27-T-0714 is a request for the procurement of two sprocket wheels, identified by NSN 3020-01-701-5104, for the Department of Defense through the DLA Weapons Support LSO Combat Vehicles and Armament. The items must be manufactured in accordance with Basic Drawing NR 53711 8287884, Revision A, dated October 1, 2015. Delivery is required within five days after receipt of order, with an original required delivery date of October 20, 2026. The shipment is designated as an RDD 999/NMCS priority and must be delivered FOB Origin to the USNS John Lewis T-AO 205 in San Diego, California. The contract mandates strict adherence to the DLA Master List of Technical and Quality Requirements, which takes precedence over ASTM D3951 packaging standards. All packaging and labeling must comply with MIL-STD-129 and RP001, with inspection and acceptance occurring at the destination per FAR 52.246-2. Payment and receiving reports must be processed electronically via the Wide Area WorkFlow system. Additionally, the award is subject to various federal regulations, including the Buy American Act, DFARS cybersecurity reporting requirements, and the prohibition of covered defense telecommunications equipment. Offerors must provide representations regarding their small business status and compliance with domestic material restrictions.
DLA WEAPONS SUPPORT LSO COMBAT VEHICLES AND ARMAMENT

POSTED

1 day ago

DEADLINE

in 9 days

General Info

NAICS

333612 - Speed Changer, Industrial High-Speed Drive, and Gear Manufacturing

Place of Performance

Orwell Dam 14780 Orwell Road, FERGUS FALLS, MN, 56537-7228, USA

Set-Aside

NONE

Documents

1
PDF, Low priorityjustification-and-authorization
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseAwarded
Posted

Justification (J&A)

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W07V Endist St Paul
Contacts1 person available
OfficeSAINT PAUL, MN, 55101-1323, USA
Office AddressSAINT PAUL, MN, 55101-1323, USA

Full Description

Show more
The Manufacturer shall furnish two (2) replacement worm gear speed reducers and associated spare gear reducer seals for the Orwell Dam tainter gate operating machinery. 2.0 REFERENCES. AMERICAN GEAR MANUFACTURERS ASSOCIATION (AGMA) AGMA 2015/915-1 (2002A) Accuracy Classification System - Tangential Measurement Tolerance Tables for Cylindrical Gears AGMA 908 (1989B; R 1999) Information Sheet: Geometry Factors for Determining the Pitting Resistance and Bending Strength of Spur, Helical and Herringbone Gear Teeth ANSI/AGMA 2001 (2004D; R 2010) Fundamental Rating Factors and Calculation Methods for Involute Spur and Helical Gear Teeth ANSI/AGMA 2003 (2010D) Rating the Pitting Resistance and Bending Strength of Generated Straight Bevel, ZEROL Bevel, and Spiral Bevel Gear Teeth ANSI/AGMA 6001 (2008E; R 2014) Design and Selection of Components for Enclosed Gear Drives ANSI/AGMA 6013 (2006A; R 2011) Standard for Industrial Enclosed Gear Drives ANSI/AGMA 9002 (2004B; R 2011) Bores and Keyways for Flexible Couplings (Inch Series) ANSI/AGMA 9005 (2002E; R 2013) Industrial Gear Lubrication 3.0 GENERAL. Description, sizes and quantities of the required supply contract work items shall be as specified herein and in accordance with the attached reference documentation located in Part 2 - REFERENCE DOCUMENTATION. All supply contract work items shall be supplied directly by the worm gear speed reducer manufacturer. Removal of existing worm speed gear reducers and installation of the replacement worm gear speed reducers shall be performed by others. 4.0 SUBMITTALS. Government approval is required for the submittals listed below. Submittals shall be submitted electronically to the Government Technical Point of Contact. Manufacturer's Literature and Equipment Data Provide catalog cuts, dimensional drawings and material data for the proposed equipment that clearly indicates compliance with the requirements of these specifications and the drawings. AGMA ratings for gear quality of all gears and gear reducers and other pertinent information pertaining to the equipment shall be submitted. Manufacturer's Installation Procedures Provide detailed manufacturer's instructions concerning the installation and alignment procedures for the equipment to be furnished. Provide any special instructions for initial oil servicing, such as flushing requirements and procedures. Operation and Maintenance (O&M) Manual Submit an operation and maintenance manual in accordance with Paragraph 6.7, Operation and Maintenance Manual. Warranty. Submit warranty information in accordance with Paragraph 6.8, Warranty. 5.0 GOVERNMENT TECHNICAL POINT OF CONTACT. All submittals and technical questions regarding this scope of work shall be directed to the Government Technical Point of Contact listed below: Tom Lytle Mechanical Engineer U.S. Army Corps of Engineers 180 5th Street East, Suite 700 Saint Paul, Minnesota 55101-1638 contact@example.gov (651)-290-5027 6.0 WORM GEAR SPEED REDUCERS. The worm gear speed reducers supplied shall be of the exact make and model as those currently installed, except where variance is required. Information pertinent to the supply of replacement worm gear speed reducers is located in this paragraph and in PART 2 - REFERENCE DOCUMENTATION. Worm gear speed reducers shall be designed and manufactured in accordance with all applicable standards referenced in Paragraph 2.0 REFERENCES. All items shall be supplied in a new and unused condition. Refurbished or reconditioned worm gear reducers, to include gear reducer subcomponents, shall not be accepted. 6.1 Existing Worm Gear Speed Reducer Data. The following information applies to BOTH existing worm gear speed reducers. Manufacturer: Delroyd Type: Single Reduction Worm Gear Speed Reducer Model: E40 - S21 * Ratio: 9-2/3:1 Torque Output: No less than 4,000 in-lbs @ 1,150 RPM Input Speed (* The "S21" designator indicates a "special" design that is proprietary to the manufacturer. In this case there is evidence in local records that these worm gear speed reducers were originally supplied with longer than standard low speed output shafts. S21 models may also contain other non-standard features. The manufacturer shall be responsible for ensuring that characteristics of the new replacement worm gear speed reducers match those of the gear reducers that were originally supplied.) The following information applies only to the existing RIGHT SIDE worm gear speed reducer. Serial Number: 191841A Installation: Horizontal Rotational Configuration: B-1 ** Fan: Yes The following information applies only to the existing LEFT SIDE worm gear speed reducer. Serial Number: 191841B Installation: Horizontal Rotational Configuration: B-2 ** Fan: Yes (** As shown in the Delroyd Single Reduction Speed Reducers catalog, P-700-DWG.) 6.2 Variance from Existing Gear Reducers. For additional redundancy, a double high speed shaft shall be included on the LEFT SIDE replacement worm gear speed reducer. The extended shaft on the fan side of the gear reducer shall be coupled with a connection suitable for operation with a 3/4-inch square drive electric drill operator (see sketches titled "Variance from Existing Gear Reducers" in Part 2 - REFERENCE DOCUMENTATION). Provide removable guard over extended shaft. All modifications from standard models to include high speed shaft extension, installation of the 3/4-inch square drive coupler, modifications to the fan vent cover, and installation of the shaft guard shall be designed and completed by the manufacturer prior to delivery. 6.3 Additional Tainter Gate Operating Machinery Information. Prime Mover: Electric Motor, 5 HP, 1200 RPM Duty: Occasional, <1/2 Hour per Day Location (Outdoor/Indoor): Outdoor, Uncovered Location (Geographical): Minnesota, USA Ambient Temperature during Operation: -20'F - 110'F 6.4 Lubricants. The worm gear speed reducers shall be delivered free of all internal lubricants. The Government shall install lubricating oil after installation in accordance with the manufacturer's recommendations. The manufacturer shall submit any special instructions for initial servicing, such as flushing requirements and procedures. Hard copies of the initial servicing instructions shall also be included within the worm gear speed reducer packaging upon delivery. 6.5 Nameplates. Each worm gear speed reducer shall have the manufacturer's name, address, model number, catalogue number, and serial number attached to the gearbox housing. Plates shall be made from corrosion resistant metal with raised or depressed lettering and contrasting background. Nameplates shall be permanently attached. 6.6 Coatings. The worm gear speed reducers shall be provided with the manufacturer's standard, factory-applied coating system suitable for equipment installed in an outdoor environment. 6.7 Operation and Maintenance Manual. Unless otherwise specified, all operation and maintenance manuals must be comprehensive to the worm gear speed reducers. The following information shall be included in the O&M manual. a. Safety precautions b. Startup, shutdown, and post-shutdown procedures c. Normal operations d. Emergency operations e. Environmental conditions f. Lubrication data (to include initial servicing instructions) g. Preventive maintenance plan and schedule h. Cleaning recommendations i. Troubleshooting guides and diagnostic techniques j. Maintenance and repair procedures k. Removal and replacement instructions l. Spare parts and supply list m. Product submittal data n. O&M submittal data o. Parts identification p. Warranty information 6.8 Warranty. Provide warranty against defective materials, design or workmanship. Length of warranty shall be the standard manufacturer's warranty period and shall not be less than one (1) year. Upon receipt of notice from the Government of failure of any of the parts during the warranty period, new replacement parts shall be furnished and installed promptly at no additional cost to the Government. 7.0 SPARE PARTS. The manufacturer shall supply spare seals at the same time as the replacement worm gear speed reducers. All spares shall be individually packaged for long-term storage and labeled. It is assumed that the lip type oil seals on the high speed shaft at both the input and fan side interfaces are identical. If this correct, supply the following spare seals in the quantities listed: Part Unit of Issue Quantity High Speed Shaft Seal EA 6 Low Speed Shaft Seal EA 2 If the lip type oil seals on the high speed shaft are different on the input and the fan sides, notify the Government technical point of contact and supply the following spare seals in the quantities listed: Part Unit of Issue Quantity High Speed Shaft Seal (Input Side) EA 3 High Speed Shaft Seal (Fan Side) EA 3 Low Speed Shaft Seal EA 2 8.0 DELIVERY, STORAGE AND HANDLING 8.1 Shipment. Shipping shall be FOB Destination and pricing shall include the cost of delivery. Shipment address and point of contact for delivery and inspection is: John Fromuth U.S. Army Corps of Engineers Orwell Dam 14780 Orwell Road Fergus Falls, Minnesota 56537-7228 contact@example.gov (218)-736-6463 Each worm gear speed reducer shall be separately packaged and separately palletized for ease of handling. Unloading of the worm gear speed reducers at the project site shall be completed by Government personnel. The Contractor shall notify the government of the shipment at least 48 hours before the scheduled delivery date. All materials specified in this scope of work shall be delivered in one shipment. Delivery shall be between the hours of 8:00 A.M. and 3:00 P.M. Monday through Friday, except on Government holidays. Any delivery arriving after 3:00 P.M. will not be accepted by Government personnel until the next work period as designated above. 8.2 Delivery Date. The materials specified in this contract shall be delivered at the earliest possible date but no later than 15 September 2017. 8.3 Inspection, Delivery and Acceptance. Upon delivery to the project area, the worm gear speed reducers shall be visually inspected for damage in the presence of the Contracting Officer. The worm gear speed reducers will be accepted if, upon inspection, it is found to be in full compliance with the contract requirements and no damage is evident.

More opportunities from Department Of Defense → W07V Endist St Paul

Same awarding agency

NAICS: 541930
New
Federal
FY27 ASL Interpretation Services for USACE MVP
Solicitation # W912ES27QA005
Solicitation W912ES27QA005 is a firm fixed-price contract for American Sign Language (ASL) interpretation services to support the U.S. Army Corps of Engineers (USACE) St. Paul District in Saint Paul, Minnesota. This opportunity is a total small business set-aside under NAICS code 541930. The period of performance runs from November 15, 2026, to November 14, 2027, and consists of two primary line items: 300 hours of interpretation services and one general job. The government will award the contract to the responsible offeror providing the most advantageous offer, with the primary evaluation factor being the lowest hourly rate. Award considerations include the total price of all options and risk assessments from the Supplier Performance Risk System regarding item, price, and supplier performance. Offerors must submit their quotes electronically through the PIEE Solicitation Module by November 13, 2026. Compliance requirements include adherence to the Buy American and Balance of Payments Program, the Service Contract Act for prevailing wages in Minnesota and Wisconsin, and various non-discrimination and safety standards. While there is conflicting guidance regarding the use of Wide Area Workflow (WAWF), the St. Paul District indicates that invoices should be submitted according to the Statement of Work. All inspection and acceptance of services will occur on-site at the St. Paul District Army Corps Engineer Centre.
Translation and Interpretation Services

POSTED

2 days ago

DEADLINE

in 14 days
View Details
NAICS: 541620
New
Federal
Phase I Environmental Site Assessment at Lower Grey Cloud Slough Islands
Solicitation # W912ES27QA010
Solicitation W912ES27QA010 is a firm fixed price contract issued by the U.S. Army Corps of Engineers, St. Paul District, for a Phase I Environmental Site Assessment (ESA) at the Lower Grey Cloud Islands. This procurement is a total small business set-aside under NAICS code 541620. The period of performance is scheduled from December 1, 2026, to May 1, 2027, with the final delivery of the assessment requested by May 1, 2027. The project requires the contractor to produce a draft and final ESA report in Microsoft Word format, adhering to USACE 1165-2-132 and ASTM E1527-21 standards, along with native electronic formats for all maps, figures, and geospatial shapefiles. The contract will be awarded based on the lowest price technically acceptable (LPTA) criteria, with the government evaluating the total price of the basic requirement and any applicable options. Key administrative requirements include active registration in the System for Award Management (SAM) and compliance with various FAR and DFARS clauses, including cybersecurity reporting, Buy American preferences, and prevailing wage laws. Inspection and acceptance will be managed by Tom Reinhardt at the St. Paul District office in Minnesota. Invoices are to be submitted to the Contracting Officer's Representative, though the solicitation contains conflicting instructions regarding the use of Wide Area Workflow (WAWF).
Environmental Consulting Services

POSTED

2 days ago

DEADLINE

in 12 days
View Details
NAICS: 334513
New
Federal
Industrial Variable Frequency Drives (VFDs)
Solicitation # W912ES26QA115
Solicitation W912ES26QA115, issued by the U.S. Army Corps of Engineers St. Paul District, is a total small business set-aside for the procurement of factory-new, commercial-off-the-shelf ABB ACS880 Series Variable Frequency Drives (VFDs). These units are required for critical operations on the Dredge Goetz, including the cutter head, main pump motors, ladder, swing, spud, and carriage drives. To ensure system compatibility and prevent unacceptable downtime, the government has issued a brand name justification limiting competition to ABB brand spares. The requirement consists of four line items: one 690V Drive Module (430A), one 500V Wall-Mounted Drive (302A), one 500V Wall-Mounted Drive (124A), and two 690V Drive Modules (721A), all featuring specific factory-installed plus-codes and technical specifications. The contract will be awarded as a single firm-fixed-price agreement to the responsible offeror providing the most advantageous price. All equipment must be 100 percent factory-new, meeting IEEE, UL, and CE standards, and must include a minimum 12-month warranty from commissioning or 18 months from delivery. Deliverables include a technical data package and a Certificate of Conformance. Items must be crated per ASTM industrial standards, moisture-barrier wrapped, and marked with permanent OEM nameplates and DoD unique identification per MIL-STD-130. Delivery is required by February 26, 2027, to the Civil Works Service Base in Fountain City, Wisconsin, with shipping costs included in the CLIN pricing. Offers must be submitted in PDF format via the PIEE Solicitation Module by the final deadline of November 9, 2026.
Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial Process Variables

POSTED

3 days ago

DEADLINE

in 9 days
View Details
NAICS: 332439
New
Federal
2-20 foot Containers with Gantry Beam and Chain Lift
Solicitation # W912ES27QA004
Solicitation W912ES27QA004 is a total small business set-aside for a firm-fixed-price contract to procure two brand-new 20-foot High Cube open-side storage containers for the U.S. Army Corps of Engineers. The containers require custom structural steel fabrication of a 1-ton capacity Load Handling Equipment crane and hoist system, featuring a 6-foot external extension and an internal counterweight system. Key technical requirements include a design safety factor of 5:1 per ASME B30 standards, PE-stamped structural calculations, and compliance with EM 385-1-1. All modified components must be coated in industrial Safety Yellow paint and the units must be marked with DoD Item Unique Identification in accordance with MIL-STD-130. The contractor is responsible for turnkey ground delivery to Fountain City, Wisconsin, with a final delivery deadline of March 1, 2027. Final acceptance is contingent upon a physical inspection and successful field demonstration by USACE staff, including a 125% proof load test and verification that the hoist traverses the full length of the gantry rails without binding. Offerors must submit technical descriptions, product data sheets, and drawings via the PIEE Solicitation Module. Evaluation will be based on technical acceptability, price consistency with historical data, and risk assessments conducted through the Supplier Performance Risk System.
Other Metal Container Manufacturing

POSTED

3 days ago

DEADLINE

in 5 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS