Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

OSU-230429, Lima - Galvin Phase 2 Renovation Floor 3

Active
48897State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Ohio State University is soliciting bids for project OSU-230429, the Galvin Phase 2 Renovation Floor 3 at the OSU Lima Campus. The scope of work involves interior alterations and renovations across multiple levels, including the replacement of a fire pump in the basement, storefront system and soffit metal panel replacement on the first floor, and the installation of new finishes and plumbing fixtures in three third-floor toilet rooms. Additionally, the project requires combining existing fourth-floor toilet rooms to create a family accessible restroom equipped with an adult changing table. The work includes hazardous materials abatement for asbestos and lead, with a general contract estimate of 600,908.00 dollars. The contract will be awarded to the lowest responsive and responsible bidder, with a required completion duration of 116 days from the notice to proceed. Bidders must comply with Ohio prevailing wage rates, EEO requirements, and an EDGE participation goal of 5.0 percent. Submissions must include a bid security form or an alternative of 10 percent of the bid amount, and bidders must affirm compliance with Executive Order 2022-02D regarding Russian institutions. Evaluation factors for award include a review of the bidder's five-year regulatory history concerning OSHA, EPA, and prevailing wage violations, as well as their financial standing and project experience.

General Info

OSU Lima Campus Galvin Phase 2 renovation bid, $600,908 estimate, 116-day completion.

Agency

The Ohio State UniversityView Agency

NAICS

236220 - Commercial and Institutional Building ConstructionView NAICS

Place of Performance

OH, USA

Set-Aside

NONE

Documents

(6)

OSU-230429 Lima – Galvin Phase 2 Renovation Floor 3 Project Manual

PDF944 pagesspecifications

OSU-230429 Addendum No. 2 - Lima Galvin Phase 2 Renovation Floor 3

PDF1 pageamendment

OSU-230429 Lima Galvin Phase 2 Renovation Floor 3 Drawings

PDF40 pagesspecifications

Document 00 45 13 - Bidder's Qualifications

PDF3 pagespast-performance

OSU-230429 Lima Galvin Phase 2 Renovation Floor 3 Solicitation

PDF2 pagesitb

OSU-230429 Addendum No. 1 - Lima Galvin Phase 2 Renovation Floor 3

PDF7 pagesamendment

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyThe Ohio State University
ContactsNo contacts available
OfficeN/A
Organization / Agency
The Ohio State University
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
OSU Lima Campus: The project will include an interior alteration + renovate approximately 190 SF at the basement level to replace the fire pump, 845 SF of the first floor southeast and southwest vestibule storefront system, ceilings and exterior soffit metal panel replacement, 592 SF (3) third floor toilet rooms with new finishes and plumbing fixtures. (4) fourth floor combining both existing facility toilet rooms to create a family accessible toilet room with an adult changing table.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
SLED
DB Construction for HC-130J Flight Simulator Facility at USCG Elizabeth City, NC
Solicitation # 32000479
This design-build project involves the construction of a full motion Weapons System Trainer flight simulator facility for C-130J aircraft at USCG Base Elizabeth City, North Carolina. The approximately 13,000 gross square foot facility will include a simulator bay for Government Furnish, Government Installed equipment, classrooms, debriefing areas, administrative offices, and various support spaces such as electrical, mechanical, and telecommunications rooms. Site work includes the installation of sidewalks and landscaping while utilizing existing parking areas. The project is issued as a task order under the National Multiple Award Construction Contract III, Pool Two, with an estimated contract value of approximately 16 million dollars and a period of performance of 719 calendar days from award. The procurement utilizes a best-value tradeoff selection process, weighing price against non-price factors including planning, organization, communication, and the proposed construction approach. Technical requirements specify the use of Siemens Building Automation Systems for installation-wide compatibility and adherence to UFC 4-010-06 cybersecurity standards. All on-site personnel must be US citizens, and security clearance is managed via RAPIDGate. The project is subject to Davis-Bacon Act wage determinations for building and heavy construction in Pasquotank County. Quality control is mandated per FAR 52.246-12, with specific ASTM standards required for the testing of concrete, soil, and structural steel.
Bristol Alliance of Companies

POSTED

about 10 hours ago

DEADLINE

in 5 days
View Details
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
This solicitation is for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. The project involves a comprehensive scope of work including the construction of six Containerized Long Weapons Storage units, two Box G, and one Box H earth-covered high-explosive magazines, as well as a new Ordnance Operations building, Truck Inspection area, and Sentry building. Key technical requirements include the installation of overhead cranes, rigid inclusions, load transfer mats, and specialized grounding and lightning protection systems. The project also requires the demolition of 18 existing magazines and two specific buildings, along with extensive sitework involving rock excavation, grading, and wetland mitigation. The contract spans a duration of 1828 calendar days and covers a wide array of trades, including structural steel, concrete, electrical utilities, and mechanical systems. This opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, and SDVOSB firms under NAICS code 236220. Interested parties must submit their responses by October 31, 2026, and should contact Rahul Maheshwari at J & J Contractors, Inc. to obtain the bid invitation and necessary documentation.
J & J Contractors, Inc

POSTED

about 10 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 236220
New
SLED
Job Order Contract (JOC) for General Construction Services
Solicitation # 280-3130501-TS
The County of Orange, specifically for John Wayne Airport, is soliciting bids for a Job Order Contract (JOC) for General Construction Services under solicitation number 280-3130501-TS. This contract is a two-step procurement process where only pre-qualified contractors are eligible to submit bid proposals. The scope of work includes providing all labor, materials, permitting, tools, and equipment necessary for general construction services at John Wayne Airport and other County-owned facilities. The contract is effective for one year from the commencement date or until the maximum construction amount is expended, with an aggregate contract value not to exceed 9,000,000 dollars. Bids are due by October 2, 2026, at 2:00 pm via the OpenGov portal, and a mandatory pre-bid webinar was scheduled for September 23, 2026. Award determination is based on a weighted formula involving six adjustment factors applied to unit prices from the October 2026 Construction Task Catalog. Successful bidders must provide a 10 percent bid security and furnish both a Faithful Performance Bond and a Labor and Material Payment Bond in the amount of 2,666,666 dollars. Key requirements include compliance with California prevailing wage laws, adherence to the County's Safety and Loss Prevention Policy, and the submission of a Quality Control Plan within ten days of the award. Additionally, personnel must undergo security clearances, including fingerprinting and background checks, for access to secured facilities. The contract also includes preferences for County of Orange Local Small Businesses and Disabled Veteran Business Enterprises.
John Wayne Airport

POSTED

1 day ago

DEADLINE

in 13 days
View Details

More opportunities from The Ohio State University

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS