Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Commercial Flooring and Base Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Commercial Flooring and Base Installation involves the removal of existing flooring and cove base and the subsequent installation of new materials at The Ohio State University. The project is specifically focused on the renovation of Stillman Hall, with work designated for Rooms 130, 135, 145, and Corridor X107C. All materials and colors used must strictly adhere to the University's approved branding palette and the standards set by the OTDI-PLE Interior Designer. The opportunity was posted on October 30, 2026, with a response deadline of November 16, 2026. Falling under NAICS code 238330, the contract requires the selected provider to deliver fully installed flooring and cove base as part of a larger facility project managed by prime contractors.

General Info

Flooring and base installation for Stillman Hall renovation at The Ohio State University.

Place of Performance

Not specified

Set-Aside

NONE

Documents

This scope was carved out of OSU-270077.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Stillman Hall - Classroom Pool Rms 135 and 145

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyThe Ohio State University
ContactsNo contacts available
OfficeN/A
Organization / AgencyThe Ohio State University
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies and installs flooring for prime contractors on The Ohio State University facility projects, here a renovation of Stillman Hall. Removes existing flooring and cove base and installs new materials in Rooms 135/145, 130, and Corridor X107C. Materials and colors must comply with the University's approved branding palette and OTDI-PLE Interior Designer standards. Delivers installed flooring and cove base.

Similar Contracts

Same NAICS industry code

NAICS: 238330
New
Federal
Floor Refinishing Services
Solicitation # 70ZH1526QCGA00001
The U.S. Coast Guard Academy in New London, Connecticut, is seeking a qualified small business contractor for a Firm Fixed Price contract to provide comprehensive hardwood athletic basketball court refinishing services. The scope of work includes the inspection, preparation, sanding, refinishing, curing, and cleaning of two facilities: Roland Hall Gymnasium, approximately 17,422 square feet, which requires annual service, and Billard Hall Gymnasium, approximately 12,129 square feet, which requires bi-annual service. The contractor is responsible for providing all labor, materials, and equipment, including the use of commercial-grade indoor athletic finishes and the protection or reapplication of court markings to match existing colors and dimensions. The contract is structured with a base year running from January 1, 2027, to December 31, 2027, and four subsequent option years extending through December 31, 2031. Award will be determined using the Lowest Price Technically Acceptable (LPTA) approach, with technical acceptance based on the absence of sanding and finish defects and strict adherence to manufacturer curing requirements. This is a 100 percent Small Business Set-Aside under NAICS code 238330. Quotes are due by November 13, 2026, and must be submitted electronically to the contracting office. Performance requires compliance with EPA, OSHA, and State of Connecticut environmental laws, and payment will be processed through the Invoice Processing Platform.
USCG Academy

POSTED

about 14 hours ago

DEADLINE

in 13 days
View Details

More opportunities from The Ohio State University

Same awarding agency

New
SLED
Stillman Hall - Classroom Pool Rms 135 and 145
Solicitation # OSU-270077
Project OSU-270077 is a design-build renovation of Stillman Hall on the first floor, specifically targeting rooms 130, 135, 145, and corridor X107C. The primary objective is to modernize existing classrooms and create larger, collaborative learning spaces in alignment with university strategic goals. The scope includes extending room 135 into room 145, upgrading lighting and technology systems per University Building Design Standards, and updating finishes according to the approved branding palette. The design-builder is responsible for all demolition, wall patching, and modifications to HVAC and electrical systems. While furniture, fixtures, and equipment procurement is excluded, the design-builder must coordinate with the university vendor to ensure installation is complete before the Autumn 2027 semester. Two optional alternates are included: flooring replacement in corridors X105C and X106C, and finish and A/V pathway upgrades in lounge areas 103 and 107. The selection process follows a two-stage approach, beginning with a qualifications-based shortlisting and concluding with a Best Value selection during the Request for Proposal stage, where a competitive Guaranteed Maximum Price will be required. The project mandates participation in the Encouraging Diversity, Growth and Equity program and adherence to state prevailing wage laws. The design-builder will manage all phases from schematic design through closeout, utilizing an open book pricing method for subcontracts. All work must comply with university sustainability and safety standards, with final finish selections requiring approval from the OTDI-Physical Learning Environments Interior Designer. Closeout documentation must be submitted electronically via the e-Builder Project Management System.

POSTED

about 22 hours ago

DEADLINE

in 17 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS