Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Homeland Security was posted on July 10, 2017. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Overhead Garage Door Renewal

Awarded
HSCG4217QQNEC52Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238290
New
Centennial JCC Panic Hardware Services (Electrical Room Egress Doors)
Solicitation # Panic Hardware (Electrical Room Egress Doors)
Management & Training Corporation is soliciting bids for the installation of commercial-grade panic hardware on electrical room egress doors at the Centennial Job Corps Center in Nampa, Idaho. The project requires the contractor to bypass internal lock mechanisms and install Grade I panic bars, exterior trim, rim cylinders, strikes, and door closers at five specific locations: the B-Cafeteria, CM-Men's Dorm, CW-Women's Dorm, D-Recreation, and F-Vocational. All work must comply with NEC 2023 Article 110.26(C)(3), NFPA 101 Life Safety Code, and the Americans with Disabilities Act. Performance requirements include a site survey to verify door dimensions and fire ratings, followed by a minimum of 10 consecutive cycle tests to ensure fail-safe operation. This is a fee-for-service subcontracting opportunity set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified entities. Bidders must submit a lump sum price and individual pricing per deficiency by December 1, 2026. Required submission documents include a bid sheet, a completed supplier packet with a W-9 and self-certification form, and three references for projects of similar scope. The contract is subject to various federal regulations, including FAR 52.222-4 for work hours and safety, and prevailing wage rates for building construction in Canyon and Gem Counties, Idaho, as specified in General Decision Number ID20250106. Final acceptance is contingent upon inspection by MTC at the designated point of delivery.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 3 hours ago

DEADLINE

in about 1 month
NAICS: 238290
New
SLED
Pauma Security Gate
Solicitation # 2026-27-06
Solicitation 2026-27-06 for the Valley Center Pauma Unified School District involves the fabrication and installation of automated, keypad-entry hinging steel security swing gates at entry and egress driveways in Valley Center, California. The project requires two powder-coated steel double swing gates, each 18 feet wide by 5 feet tall, and explicitly prohibits the use of chain link options. Key technical components include a mounted Knox switch with Fire Department filing, two entry remotes, gate hold timers, a mounted strobe detector for emergency vehicles, and a keypad similar to the Door King 1506-086. The contract value is capped at 1,000,000 dollars, and the award will be granted to the lowest responsive and responsible bidder. Eligible bidders must hold a California contractor's license C13 or C-61/D28 and comply with prevailing wage requirements and Department of Industrial Relations registration. The project mandates a payment bond for 100 percent of the total bid price and a DVBE participation goal of at least 3 percent. Required submissions include a comprehensive bid packet featuring non-collusion affidavits, Iran Contracting Act certification, and fingerprinting certifications. Performance must be coordinated with the Director of Maintenance and Operations, with work hours restricted to 7:00 am to 5:00 pm, Monday through Friday. Additionally, contractors must adhere to strict hazardous material standards and California Air Resources Board compliance, with the district maintaining the right to terminate the agreement upon 30 calendar days written notice.
Valley Center Pauma USD

POSTED

about 19 hours ago

DEADLINE

in 5 days
NAICS: 238290
New
SLED
Districtwide Elevator And Wheelchair Lift Service, Preventive Maintenance, And Repairs Maintenance Services
Solicitation # 27.004
The Hayward Unified School District is soliciting bids under solicitation number 27.004 for districtwide elevator and wheelchair lift service, preventive maintenance, and repairs. The selected contractor will be responsible for the systematic examination, maintenance, and repair of all owned or leased systems, including hydraulic, electrical, and mechanical components, to ensure they remain in safe and usable condition. This contract requires the provider to hold an active C-11 Elevator Contractor license from the State of California and comply with all local and state codes, including Title 24 of the California Code of Regulations. The award will be granted to the lowest responsive and responsible bidder based on the rates provided in the bid form. Performance of regular services typically occurs Monday through Friday during standard business hours, while emergency repairs must be available 24 hours a day, seven days a week. The contractor must provide a bid bond of at least 10 percent of the bid amount and subsequently provide payment and performance bonds upon award. Invoicing is conducted monthly, with a requirement that authorized materials be invoiced at no more than 15 percent above the vendor's cost. Key compliance requirements include paying prevailing wages per the California Labor Code, submitting to fingerprinting and felony conviction certifications, and maintaining a minimum one-year warranty on work. All contracts are governed by the laws of the State of California.
Hayward Unified School District

POSTED

about 21 hours ago

DEADLINE

in 19 days

General Info

Contract Value

$4,600

NAICS

238290 - Other Building Equipment Contractors

Place of Performance

USCG TRACEN Cape May 1 Munro Ave, CAPE MAY, NJ, 08204, USA

Set-Aside

NONE

Award Issued Date

Documents

5

Garage_Door_Repair.1449.pdf

PDF

RFI.docx

DOCX

RFI.docx

DOCX

RFQ_Solicitation_FE_Garage_Door.docx

DOCX

SOW_Garage_Door.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseAwarded
Posted

Combined Synopsis

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Homeland Security → Tracen Cape MAY(00042)
Contacts1 person available
OfficeCAPE MAY, NJ, 08204, USA
Office AddressCAPE MAY, NJ, 08204, USA
Contacts
Mark A BlaesiContracting Officer

Full Description

Show more
1. GENERAL REQUIREMENTS: The work consists of providing all labor, materials, and equipment, as required to renew 12'2" x 12' Clopay model 3200 (or equivalent) insulated garage door (6 section, chocolate brown), with three look out insulated glass windows and one pass thru door (one window in the door) on building 157 (Central Supply) garage entrance at Coast Guard TRACEN located at 1 Munro Ave. Cape May, NJ 08204. 2. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK: Upon acceptance, the Contractor shall commence work NLT Thirty (30) days after notice to proceed, and work diligently to complete the entire project to be ready for use NLT thirty five (35) working days after contract award. 3. SCOPE OF WORK: 1) Remove existing 6 section insulated garage door, sections only. 2) Dispose of garage door sections. 3) Install new 12'2" x 12' Clopay model 3200 (or equivalent) insulated garage door (6 section, chocolate brown), with three look out insulated glass windows and one pass thru door (one window is in the door). 4) Door sections shall be installed on existing garage door side tracks. 5) Existing electric garage door opener shall be attached to the new garage door sections. 6) Door sections shall be 2-1/8" thick with a stucco embossed texture on both sides. 7) Exterior door section color: Chocolate Brown. 8) Interior door section color: White. 9) Weather-stripping: Provide complete perimeter seals. Provide flexible top seal, flexible jamb seal and U shaped bottom seal. 10) Contractor shall take measures to ensure Coast Guard property is protected and remain secure in work area. 11) All areas must be restored to pre-install condition. 4. SITE VISIT: All prospective contractors are strongly encouraged to visit the site to verify any/all quantities before submitting proposals. Interested parties shall make arrangements for a site visit with Bill Geib at +1 (555) 000-0000. 5. DESIGNATED CONTRACTING OFFICER'S QA EVALUATOR (QAE) REPRESENTATIVE: The designated Contracting Officer's QAE representative and Point of Contact for this project is Bill Geib at +1 (555) 000-0000. Inquiries concerning any phase of the specification before or after award shall be made to Mark Blaesi (at) contact@example.gov. 6. CONDITIONS AFFECTING THE WORK: The Offeror should visit the site and take such other steps as may be reasonably necessary to ascertain the nature and location of the work, the general and local conditions which can affect the cost of the work thereof. Failure to do so will not relieve bidders from responsibility for estimating properly the difficulty or cost of successfully performing the work. The Government will assume no responsibility for any understanding or misrepresentations concerning conditions made by any of its officers or agents prior to the execution of the contract, unless included in the request for quotes, the specification or related documents. 7. AFTER AWARD OF THE CONTRACT: The Contractor must immediately notify the Contracting Officer's QAE representative of their intended start date. The work shall be done in accordance with the specification in Section Three. 7.1. The Contractor shall consider items in BOLD as having mandatory due dates. Items in italics are deliverables or events that must be reviewed and/or approved by the QAE prior to proceeding to next deliverable or event in this SOW. Item SOW Reference Deliverable/ Event Due By Distribution 1 After Award of The Contract (7) Post Award Conference (optional at discretion of government) Within 7 days of award QAE/ Contracting Officer/Contractor 2 Scope (3) Materials lead time Within 7 days of award QAE 3 Scope (3) Anticipated Work Schedule Within 2 days of award QAE 4 Worker List See section 14 5 days prior to work commencing QAE 5 Commence Work See section 2 Within 20 days of award QAE 6 Complete Work See section 2 Within 35 days of award QAE 8. ORAL MODIFICATION: No oral statement of any person other than the Contracting Officer shall in any manner or degree, modify or otherwise affect the terms of the contract. 9. WORKMANSHIP: All work shall be accomplished with the best standard practices, and by workmen thoroughly experienced in the required trades. The work shall be supervised by experienced personnel and shall be satisfactory to the Contracting Officer. 10. PERMITS: The Contractor shall without additional expense to the Government, obtain all appointments, licenses, and permits required for the prosecution of the work. The Contractor shall comply with all applicable federal, state, and local laws. 11. CLEAN UP: All trash and debris shall be removed from the site daily. The job site shall be left in a clean and neat manner. 12. WORK OUTSIDE REGULAR HOURS of (0730 to 1600 Mon-Fri): If the Contractor desires to carry on work on Saturday, Sunday, holidays, or outside the unit's regular hours, a written request must be submitted to the Contracting Officer's QAE Representative for approval consideration. The Contractor shall allow ample time to enable satisfactory arrangements to be made by the Government for inspecting the work in progress. 13. UPON COMPLETION OF WORK: Contact the Contracting Officer's QAE Representative to arrange for inspection/acceptance of work. 14. IDENTIFICATION OF CONTRACTOR PERSONNEL AND VEHICLES: The Contractor shall provide a detailed list of all employees to the QAE Representative five (5) days prior to commencing work. The employee list shall contain the employee's full name, date and place of birth, current address, and last four (4) of SSN. The TRACEN Cape May Security Officer will be given a copy of the employee list and grant access for entry. Each Contractor provided vehicle or towed trailer shall show the Contractor's name so that it is clearly visible on the vehicle. A valid state license plate and safety inspection sticker is required. All vehicles operated on Government property shall be maintained in a good state of repair. 15. SAFETY REQUIREMENTS: 1. Responsibilities: a. All Contractors working on TRACEN Cape May shall abide by all federal safety regulations as published by the Occupational Health and Safety Administration, 29 CFR 1910 (series) and 29 CFR 1926 (series). Contractor written safety programs shall be reviewed by the Safety Officer prior to starting work. b. Written notification must be provided to the TRACEN Cape May Safety Officer, Jonathan Trainor (at) +1 (555) 000-0000 in their capacity as Fire Marshal of any activity that could potentially cause fire or explosion or that change or reduces the capability of fighting a fire or explosion. Some examples of qualifying activities are: A fire hydrant or fire suppression system that must be taken out of service for any reason, electrical work that affects fire alarm systems, introduction of hazardous or flammable material onto the unit, and blocking of any egress routes or emergency vehicle routes. Inclusion of their information in the contract constitutes written notification as long as the outsource review sheet is signed by Safety Officer. c. Copies of the following must be provided to the Safety Officer prior to starting work in affected areas: Confined Space Entry Permits, Hot Work Chits, and Dig Chits. Confined space clearance must be conducted by a certified marine chemist and permit required spaces will have a copy of the permit posted on site during work. Hot work will only be conducted with permission and a fire watch must be posted during work. d. Lock Out/Tag Out requires notification and coordination with facilities and will not be conducted by a Contractor on TRACEN Cape May. A Facilities Division representative is required for all Contractor Lock Out/Tag Out needs and shall be coordinated by the Safety Officer listed above. 2. Rights: a. Every employee working on TRACEN Cape May has the right to a safe and healthy work place. The Contractor has the responsibility and right to stop unsafe work. QAE's and the Safety Officer may also institute a work stoppage relating to unsafe practices or immediate danger to life and health situations. 16. ENVIRONMENTAL PROTECTION REQUIREMENTS: a. All Contractors working on TRACEN Cape May shall abide by all federal environmental regulations as published by the Environmental Protection Agency, 40 CFR (series). Contractor written environmental management and pollution prevention programs shall be reviewed by the Environmental Protection Specialist Chris Hajduk (at) +1 (555) 000-0000, prior to starting work and must be in accordance with the Unit Environmental Guide. b. Written notification must be provided to the Environmental Protection Specialist of any activity that could potentially cause a permit violation on TRACEN Cape May Some examples of qualifying activities are: any activity that could result in a spill, discharge into a waterway, or introducing a hazardous material into the environment. c. Copies of the following must be provided to the Environmental Protection Specialist prior to starting work in affected areas: Material Safety Data Sheets, permits, and notices of intent. d. Hazardous materials used by a Contractor are required to be disposed of by that Contractor. Disposal must be in accordance with federal, state, and local guidelines. 1. GENERAL REQUIREMENTS: The work consists of providing all labor, materials, and equipment, as required to renew 12'2" x 12' Clopay model 3200 (or equivalent) insulated garage door (6 section, chocolate brown), with three look out insulated glass windows and one pass thru door (one window in the door) on building 157 (Central Supply) garage entrance at Coast Guard TRACEN located at 1 Munro Ave. Cape May, NJ 08204. 2. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK: Upon acceptance, the Contractor shall commence work NLT Thirty (30) days after notice to proceed, and work diligently to complete the entire project to be ready for use NLT thirty five (35) working days after contract award. 3. SCOPE OF WORK: 1) Remove existing 6 section insulated garage door, sections only. 2) Dispose of garage door sections. 3) Install new 12'2" x 12' Clopay model 3200 (or equivalent) insulated garage door (6 section, chocolate brown), with three look out insulated glass windows and one pass thru door (one window is in the door). 4) Door sections shall be installed on existing garage door side tracks. 5) Existing electric garage door opener shall be attached to the new garage door sections. 6) Door sections shall be 2-1/8" thick with a stucco embossed texture on both sides. 7) Exterior door section color: Chocolate Brown. 8) Interior door section color: White. 9) Weather-stripping: Provide complete perimeter seals. Provide flexible top seal, flexible jamb seal and U shaped bottom seal. 10) Contractor shall take measures to ensure Coast Guard property is protected and remain secure in work area. 11) All areas must be restored to pre-install condition. 4. SITE VISIT: All prospective contractors are strongly encouraged to visit the site to verify any/all quantities before submitting proposals. Interested parties shall make arrangements for a site visit with Bill Geib at +1 (555) 000-0000. 5. DESIGNATED CONTRACTING OFFICER'S QA EVALUATOR (QAE) REPRESENTATIVE: The designated Contracting Officer's QAE representative and Point of Contact for this project is Bill Geib at +1 (555) 000-0000. Inquiries concerning any phase of the specification before or after award shall be made to Mark Blaesi (at) contact@example.gov. 6. CONDITIONS AFFECTING THE WORK: The Offeror should visit the site and take such other steps as may be reasonably necessary to ascertain the nature and location of the work, the general and local conditions which can affect the cost of the work thereof. Failure to do so will not relieve bidders from responsibility for estimating properly the difficulty or cost of successfully performing the work. The Government will assume no responsibility for any understanding or misrepresentations concerning conditions made by any of its officers or agents prior to the execution of the contract, unless included in the request for quotes, the specification or related documents. 7. AFTER AWARD OF THE CONTRACT: The Contractor must immediately notify the Contracting Officer's QAE representative of their intended start date. The work shall be done in accordance with the specification in Section Three. 7.1. The Contractor shall consider items in BOLD as having mandatory due dates. Items in italics are deliverables or events that must be reviewed and/or approved by the QAE prior to proceeding to next deliverable or event in this SOW. Item SOW Reference Deliverable/ Event Due By Distribution 1 After Award of The Contract (7) Post Award Conference (optional at discretion of government) Within 7 days of award QAE/ Contracting Officer/Contractor 2 Scope (3) Materials lead time Within 7 days of award QAE 3 Scope (3) Anticipated Work Schedule Within 2 days of award QAE 4 Worker List See section 14 5 days prior to work commencing QAE 5 Commence Work See section 2 Within 20 days of award QAE 6 Complete Work See section 2 Within 35 days of award QAE 8. ORAL MODIFICATION: No oral statement of any person other than the Contracting Officer shall in any manner or degree, modify or otherwise affect the terms of the contract. 9. WORKMANSHIP: All work shall be accomplished with the best standard practices, and by workmen thoroughly experienced in the required trades. The work shall be supervised by experienced personnel and shall be satisfactory to the Contracting Officer. 10. PERMITS: The Contractor shall without additional expense to the Government, obtain all appointments, licenses, and permits required for the prosecution of the work. The Contractor shall comply with all applicable federal, state, and local laws. 11. CLEAN UP: All trash and debris shall be removed from the site daily. The job site shall be left in a clean and neat manner. 12. WORK OUTSIDE REGULAR HOURS of (0730 to 1600 Mon-Fri): If the Contractor desires to carry on work on Saturday, Sunday, holidays, or outside the unit's regular hours, a written request must be submitted to the Contracting Officer's QAE Representative for approval consideration. The Contractor shall allow ample time to enable satisfactory arrangements to be made by the Government for inspecting the work in progress. 13. UPON COMPLETION OF WORK: Contact the Contracting Officer's QAE Representative to arrange for inspection/acceptance of work. 14. IDENTIFICATION OF CONTRACTOR PERSONNEL AND VEHICLES: The Contractor shall provide a detailed list of all employees to the QAE Representative five (5) days prior to commencing work. The employee list shall contain the employee's full name, date and place of birth, current address, and last four (4) of SSN. The TRACEN Cape May Security Officer will be given a copy of the employee list and grant access for entry. Each Contractor provided vehicle or towed trailer shall show the Contractor's name so that it is clearly visible on the vehicle. A valid state license plate and safety inspection sticker is required. All vehicles operated on Government property shall be maintained in a good state of repair. 15. SAFETY REQUIREMENTS: 1. Responsibilities: a. All Contractors working on TRACEN Cape May shall abide by all federal safety regulations as published by the Occupational Health and Safety Administration, 29 CFR 1910 (series) and 29 CFR 1926 (series). Contractor written safety programs shall be reviewed by the Safety Officer prior to starting work. b. Written notification must be provided to the TRACEN Cape May Safety Officer, Jonathan Trainor (at) +1 (555) 000-0000 in their capacity as Fire Marshal of any activity that could potentially cause fire or explosion or that change or reduces the capability of fighting a fire or explosion. Some examples of qualifying activities are: A fire hydrant or fire suppression system that must be taken out of service for any reason, electrical work that affects fire alarm systems, introduction of hazardous or flammable material onto the unit, and blocking of any egress routes or emergency vehicle routes. Inclusion of their information in the contract constitutes written notification as long as the outsource review sheet is signed by Safety Officer. c. Copies of the following must be provided to the Safety Officer prior to starting work in affected areas: Confined Space Entry Permits, Hot Work Chits, and Dig Chits. Confined space clearance must be conducted by a certified marine chemist and permit required spaces will have a copy of the permit posted on site during work. Hot work will only be conducted with permission and a fire watch must be posted during work. d. Lock Out/Tag Out requires notification and coordination with facilities and will not be conducted by a Contractor on TRACEN Cape May. A Facilities Division representative is required for all Contractor Lock Out/Tag Out needs and shall be coordinated by the Safety Officer listed above. 2. Rights: a. Every employee working on TRACEN Cape May has the right to a safe and healthy work place. The Contractor has the responsibility and right to stop unsafe work. QAE's and the Safety Officer may also institute a work stoppage relating to unsafe practices or immediate danger to life and health situations. 16. ENVIRONMENTAL PROTECTION REQUIREMENTS: a. All Contractors working on TRACEN Cape May shall abide by all federal environmental regulations as published by the Environmental Protection Agency, 40 CFR (series). Contractor written environmental management and pollution prevention programs shall be reviewed by the Environmental Protection Specialist Chris Hajduk (at) +1 (555) 000-0000, prior to starting work and must be in accordance with the Unit Environmental Guide. b. Written notification must be provided to the Environmental Protection Specialist of any activity that could potentially cause a permit violation on TRACEN Cape May Some examples of qualifying activities are: any activity that could result in a spill, discharge into a waterway, or introducing a hazardous material into the environment. c. Copies of the following must be provided to the Environmental Protection Specialist prior to starting work in affected areas: Material Safety Data Sheets, permits, and notices of intent. d. Hazardous materials used by a Contractor are required to be disposed of by that Contractor. Disposal must be in accordance with federal, state, and local guidelines.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS