Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of The Interior was posted on September 21, 2016. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

P--Demolition Service, Elwha/Altair, Olympic N.P.

Awarded
P16PS02700Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

General Info

Contract Value

$33,980

NAICS

238910 - Site Preparation Contractors

Place of Performance

CO

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

4 updates
PhaseAwarded
Posted

Combined Synopsis

Notice updated

The notice title changed. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Dsc Contracting Services Division
ContactsNo contacts available
OfficeDenver, CO, 80225, USA
Office AddressDenver, CO, 80225, USA
ContactsNo contact information available

Full Description

Show more
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2005-89 (effective 9/5/16). It is the contractor's responsibility to be familiar with applicable clauses and provisions. Clauses and provisions can be found at https://www.acquisition.gov/?q=/browse/far/52. The solicitation number is P16PS02700, and the solicitation is issued as a Request for Quotation. The NAICS code is 238910, Site Preparation Contractors, with an associated small business size standard of $15 million. This solicitation is for a service (not construction), is a 100% total small business set-aside, and will result in a firm fixed price contract to a single vendor determined to be responsive and responsible. The Government will consider past performance in determining responsibility. ATTACHMENTS TO THIS SOLICITATION. All attachments can be accessed via the link to FedConnect, or by going directly to the FedConnect website at https://www.fedconnect.net. Once at the FedConnect home page, click "Search Public Opportunities Only." Next screen, under Search Criteria, change the drop-down menu selection to read "Reference Number," then type in solicitation number P16PS02700 and click "search." Next screen, click the underlined text that is the title of the solicitation, shown as "Demolition Service, Elwha/Altair, Olympic N.P." Next screen is the overview screen. On the right-hand side, is the list of documents posted, showing the SF-1449 solicitation form and all attachments. The attachments must be opened individually, and can be downloaded and saved or printed. Besides the SF-1449 solicitation form, there are eight attachments total, as follows: Attachment 1, Combined Synopsis-Solicitation (full text version) Attachment 2, Scope of Work Attachment 3, Site Photos Attachment 4, Altair CG Asphalt Demolition Plan ("CG" means campground) Attachment 5, Altair CG CS Demolition Plan ("CS" means comfort station, which is a restroom facility) Attachment 6, Elwa CG Demolition Plan Attachment 7, Elwha CG CS Demolition Plan Attachment 8, DOL Wage Rates DESCRIPTION. The National Park Service, Olympic National Park (OLYM), has a requirement for removal of the restroom buildings, water stations, septic tanks and associated piping at Altair and Elwha campgrounds. At Altair campground work also includes the removal of asphalt paving. The river has changed course and has severely eroded the bank dropping a good portion of the lower part of the campground into the river. The park needs to be proactive and remove other items that could be in danger of collapsing into the river during storm events or high water. The park has proposed a plan to retain the upper portion of the campground for use as a picnic area. All objects in the lower terrace of the campground need to be removed. At the Elwha campground the river flowed through the campground depositing over three feet of silt. The park has removed the silt from around the restroom building. Work includes one bid option to remove fire rings, food storage cabinets, and picnic tables in the Elwha campground. Unless specified to be salvaged, all demolished materials are to be removed from the park and disposed of or recycled at appropriate facilities. Olympic National Park encourages the contractor to recycle as many materials as is practical, such as asphalt paving, concrete, and metal roofing. Pressure wash and/or steam clean all construction equipment including hauling vehicles before entering Olympic National Park for the first time; subsequent entries will not require pressure washing unless the vehicle shows signs of mud, plant material, or other substances that could be considered harmful. Note: Removal and relocation of the concrete vault toilets are not part of this contract. SAFETY: Contractors are required to comply with all OSHA regulations and maintain a safe working environment. Contractor will need to pay attention to weather and river conditions to safely accomplish the work. This description does not contain all of the information contained in the project Scope of Work. Offerors shall refer to Attachment no. 2, Scope of Work, as well as review the other four other attachments that comprise site plans and photographs, Attachments no. 3 through 7, all available in FedConnect. PERFORMANCE PERIOD and SITE ACCESS. The Olympic Hot Springs Road is currently closed to the public due to a washout. Road repair is currently underway by OLYM¿s road crew, scheduled to be completed in September 2016, to be followed by a paving contract. The paving contract is soon to be awarded with an anticipated start date the third or fourth week of September 2016, which will fully re-open the once completed. Due to the dynamic nature of the Elwha River, the demolition work of this contract should start as soon as possible after the re-opening of the road, and preferably be completed by the end of October 2016. ELWHA and ALTAIR CAMPGROUND LOCATIONS. There are no physical addresses for these two campgrounds. Both campgrounds are located off of Olympic Hot Springs Road within Olympic National Park. The turn-off from US Highway 101 onto Olympic Hot Springs Road is approximately 10 miles West of Port Angeles, WA. Once you turn off of Highway 101 onto Olympic Hot Springs Road, the Elwha Campground is approximately 3 miles up the road, and the Altair Campground is approximately 4.4 miles up the road (1.4 miles further up the road past the Elwha Campground). The Elwha Campground is on the left side, and the Altair Campground is on the right side. Olympic Hot Springs Road is currently closed to all public access because road repairs are underway, as explained above. QUOTES ARE DUE AT 4PM PACIFIC TIME (PT) ON FRIDAY, SEPTEMBER 16, 2016. QUESTIONS REGARDING THIS SOLICITATION. Questions may be asked via email, writing "P16PS02700/QUESTION" in the subject line, and sending the email to contact@example.gov. All questions must be submitted no later than 3pm on Wednesday, September 14, 2016. NOTE: This synopsis page contains only a partial amount of information contained in this solicitation. Please refer to the Standard Form 1449 and Attachments 1 through 8, available at FedConnect. Click on the link below, following the instructions provided above, to access the complete solicitation package in FedConnect. The government reserves the right to cancel this solicitation.

More opportunities from Department Of The Interior → Dsc Contracting Services Division

Same awarding agency

NAICS: 237990
New
Federal
Y--Timucuan Ecological and Historic Preserve TIMU-335
Solicitation # 140P2026R0081
Solicitation 140P2026R0081 is a Small Business Set-Aside, Firm-Fixed-Price contract issued by the National Park Service for the stabilization of the Kingsley Plantation shoreline at the Timucuan Ecological and Historic Preserve in Jacksonville, Florida. The project, identified as TIMU-335507, aims to repair and extend a seawall damaged by Hurricane Ian to protect critical cultural and ecological resources. The scope of work is divided into three primary CLINs: the installation of a new weatherable rigid vinyl sheet pile wall with tie rods in front of the existing wall, the extension of the wall eastward using structural FRP composite sheet piles, and comprehensive site restoration including excavation, backfilling, sodding, sea grass restoration, and the installation of limestone riprap. The estimated construction magnitude is between 1 million and 5 million dollars, with a mandatory performance period of 259 calendar days. Award will be determined using the Best Value Continuum Tradeoff Process, where non-price factors—specifically technical approach, schedule, and management approach—are significantly more important than price. Contractors must adhere to strict environmental protection protocols to safeguard aquatic species, wetlands, and endangered wildlife, including manatees and sea turtles, in compliance with the Marine Mammal Protection Act and the Endangered Species Act. Additional requirements include adherence to the Davis-Bacon Act for prevailing wages, ADA compliance for public dock walkways, and the use of biodegradable or recyclable packaging. Proposals must be submitted electronically in two volumes by November 13, 2026, and include a bid bond and detailed past performance data.
Other Heavy and Civil Engineering Construction

POSTED

1 day ago

DEADLINE

in 15 days
View Details
NAICS: 221320
New
Federal
Y--GRCA 257282 - Replace Wastewater Plant at South Ri
Solicitation # 140P2026R0101
Solicitation 140P2026R0101 is an unrestricted full and open competition Invitation for Bid issued by the National Park Service, DSC Contracting Services Division, for the replacement of the South Rim Wastewater Treatment Plant at Grand Canyon National Park, Arizona. The project involves the construction of a GD Membrane Bio-Reactor wastewater treatment plant, including new treatment facilities, administrative and support buildings, and process systems. The scope of work encompasses complete demolition and removal of existing infrastructure, site preparation, grading, paving, fencing, and improvements to the facility access road. A critical requirement is that the existing plant must remain in permitted operation until the new facility is accepted by the government, and the contractor must provide a 12-month operational support period. The contract is a firm-fixed-price acquisition with a magnitude exceeding 100 million dollars. The mandatory period of performance is 1095 calendar days, scheduled from February 1, 2027, to February 1, 2030. Award will be based on a multi-factor, best-value tradeoff process evaluating technical experience, technical approach, key personnel experience, and price. Required deliverables include a detailed commissioning plan covering startup sequencing, operator training, and regulatory coordination. The contractor must furnish performance and payment bonds and comply with union prevailing wage rates, Department of the Interior cybersecurity requirements, and ADA/ABA accessibility standards.
Sewage Treatment Facilities

POSTED

1 day ago

DEADLINE

in 20 days
View Details
NAICS: 237310
Federal
Z--BRCA 310427 Southbound Shuttle Stop
Solicitation # 140P2026R0065
Solicitation 140P2026R0065 is a small business set-aside for the construction of the Southbound Shuttle Stop at Bryce Canyon National Park, Utah. Managed by the National Park Service Denver Service Center, this firm-fixed-price contract has an estimated value between $1,000,000 and $5,000,000. The scope of work includes shuttle stop improvements, the addition of lanes, culvert installation, trail realignment, retaining wall construction, ADA ramp and sidewalk installation, and the placement of shelters and MUTCD-compliant signage. Due to the project's location, the contractor must implement protective measures for the adjacent UT Prairie Dog Habitat and ensure all equipment is clean and free of contaminants. The performance period is scheduled from May 1, 2027, to September 28, 2027, with a total duration of 150 calendar days following the notice to proceed. Award will be determined using the Best Value Continuum Tradeoff Process, evaluating technical approach, schedule, project experience, key personnel, and past performance alongside proposed pricing. Requirements include the submission of bid, performance, and payment bonds, compliance with Davis-Bacon Act wage determinations, and adherence to OSHA safety standards. Proposals must be submitted electronically in separate technical and price volumes, with a final response deadline of November 3, 2026.
Highway, Street, and Bridge Construction

POSTED

13 days ago

DEADLINE

in 5 days
View Details
NAICS: 237110
Federal
Y--HAVO 326181 Rehabilitate Rainshed&Water Treatment
Solicitation # 140P2026R0091
Solicitation 140P2026R0091 is a firm-fixed-price construction contract issued by the National Park Service Denver Service Center to rehabilitate the Rainshed and Water Treatment System at Hawaii Volcanoes National Park. The project scope includes the rehabilitation of the rainwater catchment and water treatment systems, the replacement of Building 43 with a new metal building, and the replacement of Building 241 with a new open-air and CMU structure. Additional optional requirements include replacing the perimeter fence, repairing the water treatment system, and replacing ground catchment pavement. The project has a mandatory performance period of 610 calendar days, with primary CLINs scheduled from November 1, 2026, to July 3, 2028. The government will award the contract using a best value tradeoff process, evaluating non-price factors such as project experience, technical approach, management approach, and construction schedule against proposed pricing. Bidders must comply with the Davis-Bacon Act for prevailing wages and adhere to Buy American Act and Build America Buy America standards. Technical requirements include ADA compliance, the implementation of a Quality Control Plan, and adherence to specific environmental standards regarding ozone-depleting substances and recycled content. Due to the site's nature, the project involves Section 106 mitigation for historic buildings and requires careful construction phasing to ensure water production is not compromised. Proposals must be submitted electronically, and the awardee will be required to provide performance and payment bonds within 10 days of award.
Water and Sewer Line and Related Structures Construction

POSTED

16 days ago

DEADLINE

in 8 days
View Details
NAICS: 237310
Federal
Z--YELL 338223 - Bridge Preservation
Solicitation # 140P2026R0073
Solicitation 140P2026R0073 is a Small Business Set-Aside for bridge preservation services at Yellowstone National Park, Wyoming, managed by the National Park Service Denver Service Center. The project involves the rehabilitation of three specific bridges: Lava Creek, Thumb Creek, and an Unnamed Creek bridge. The scope of work includes concrete spall and structural repairs, crack sealing, stone masonry repointing, bridge expansion joint maintenance, painting of railings, and the application of epoxy overlays via hydro-demolition. Additional requirements include erosion repair, pavement markings, and strict traffic control. The anticipated period of performance is 155 calendar days from the Notice to Proceed, with an estimated contract value between $1 million and $5 million. The contract will be awarded using the Best Value Continuum Tradeoff Process, where non-price factors—specifically technical approach, project experience, key personnel, and past performance—are significantly more important than price. Required key personnel include a Site Superintendent with at least five years of experience and OSHA 30 certification, and a Traffic Control Supervisor with three years of experience meeting MUTCD standards. Contractors must adhere to strict work hour restrictions from 7 AM to 7 PM and comply with environmental protections for wildlife and cultural resources. Performance and payment bonds are required at 100 percent of the contract price, and the project is subject to Davis-Bacon Act labor standards. Proposals are due by October 30, 2026.
Highway, Street, and Bridge Construction

POSTED

16 days ago

DEADLINE

in 1 day
View Details
NAICS: 237110
Federal
Y--GRTE 237343 - Rehab 4 Lazy F Ranch
Solicitation # 140P2026R0098
Solicitation 140P2026R0098 is a Total Small Business Set-Aside for the rehabilitation of the historic 4 Lazy F Ranch in Grand Teton National Park, Wyoming, to provide employee housing. The project scope includes the comprehensive rehabilitation of one lodge, eight cabins, one garage, two outbuildings, and a water well structure. Key technical requirements involve structural repairs, historic preservation, and the installation of new potable water and wastewater systems, including a sanitary sewer collection system and lift station. The project is estimated to exceed 10 million dollars and has a mandatory negotiable performance period of 170 calendar days, with work beginning within 10 days of award. The procurement will be awarded using the Best Value Continuum Tradeoff Process, where non-price factors—technical approach, project experience, schedule, and past performance—are collectively equal in importance to price. Contractors must adhere to strict environmental and safety standards, including the management of lead-based paint and asbestos, compliance with the Davis-Bacon Act, and mitigation of impacts on bald eagle nesting and roosting bats. Proposals must be submitted electronically by November 20, 2026, and must include a detailed technical approach and a phasing plan to minimize park operational disruptions. Required insurance includes general liability of 500,000 dollars and employer liability of 100,000 dollars.
Water and Sewer Line and Related Structures Construction

POSTED

24 days ago

DEADLINE

in 22 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS