This Solicitation opportunity from Nevada was posted on May 22, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

P2A Pump Station Rehabilitation Project

Closed
1775 Addendum 1State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
San Vicente and Mt. Olivette Reservoir Improvements Project - Construction
Solicitation # SP2797-CT
The San Vicente and Mt. Olivette Reservoir Improvements Project (SP2797-CT) is a construction solicitation issued by the City of Santa Monica's Public Works Engineering Division. The project involves addressing civil, mechanical, structural, and electrical deficiencies for four water reservoirs located at the Mt. Olivette Reservoir and the San Vicente Reservoir. With a project estimate of $27,344,000, the work requires a contractor holding a Class A General Engineering license. The estimated contract duration is 730 calendar days, although some contract documents reference a term of 520 days from the notice to proceed. Liquidated damages for delays are set at $13,200 per day. Bids must be submitted electronically via the OpenGov Procurement portal, with a final deadline of October 29, 2026, at 3:00 PM PT. Submission requirements include a bid guarantee of at least 10 percent of the bid amount and certification of a mandatory pre-bid job walk. Awarded contractors must provide Labor and Material Payment and Performance Bonds for 100 percent of the contract sum. The scope of work includes strict adherence to local noise ordinances, prevailing wage requirements, and technical specifications for potable water materials and electrical labeling. Performance is subject to inspection by the City and its designated engineers at both the project site and the place of manufacture.
D500 PUBLIC WORKS - ENGINEERING DIVISION

POSTED

about 8 hours ago

DEADLINE

in 9 days
NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 15 hours ago

DEADLINE

in 15 days

AI Contract Overview

Show more

The P2A Pump Station Rehabilitation Project at 7100 East Carey Avenue in Las Vegas, Nevada, encompasses a comprehensive modernization effort to enhance the efficiency and reliability of the facility’s critical infrastructure. Key improvements include upgrading four pumps to boost output, replacing the existing NV transformer, installing new emergency generator equipment, and modernizing electrical controls to meet current standards. The scope also involves expanding the suction and discharge piping, improving onsite drainage systems, and upgrading the HVAC infrastructure to support operational demands. All work must be completed within 300 consecutive calendar days from the Notice to Proceed, with this timeframe explicitly covering resolution of all punch list items, final cleanup, and demobilization. The project’s estimated budget ranges from $7.5 million to $9.5 million, reflecting the scale and complexity of the upgrades. The solicitation for this project is identified as Addendum 1 under solicitation number 1775, posted on May 22, 2026, with responses due by June 24, 2026. The contracting authority is the Nevada Government Marketplace, operating under the Nevada agency, with the place of performance confirmed in North Las Vegas. Dave Tanner of the City of North Las Vegas serves as the primary point of contact, reachable via email at [email hidden]. All details and documentation can be accessed online through the Nevada IONWAVE portal at the provided UI link, though no specific set-aside or NAICS code is indicated in the available data. The project is being managed as a public infrastructure initiative with no apparent classification restrictions on bidder eligibility.

General Info

P2A Pump Station rehab in North Las Vegas includes pump, electrical, piping, and HVAC upgrades within 300 days, budget $7.5M–$9.5M.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNevada Government Marketplace
Contacts1 person available
OfficeNV, USA
Organization / AgencyNevada Government Marketplace
Office AddressNV, USA
Contacts

Full Description

Show more
The P2A Pump Station Rehabilitation Project is located at 7100 East Carey Avenue, Las Vegas, NV 89030 . The project includes upgrades to four pumps to increase output, upgrades to the electrical controls to modern standards, increases to the suction and discharge piping size, onsite drainage improvements, HVAC upgrades, replacement of emergency generator, and replacement of the existing NV transformer. The Project shall be completed within three hundred (300) consecutive calendar days from the date specified in the Notice to Proceed, which time shall include resolution of all punch list items, final cleanup and demobilization. The estimated monetary range of the project is $7,500,000 to $9,500,000.

More opportunities from Nevada Government Marketplace

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS