Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on March 6, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

P481 Energy Resilience Phases 3 & 4, Various Locations at Mountain Warfare Training Center, Bridgeport, California

Closed
N6247325RP481Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237130
New
SLED
Installation of Buried Fiber Optic Cable Stanton North Substation to Hoskins Substation
Solicitation # 26085
The Nebraska Public Power District is soliciting bids for Request for Bid No. 26085 to install approximately six miles of underground fiber optic cable between the Stanton North and Hoskins Substations in northeast Nebraska. The scope of work encompasses all labor, materials, and supervision required for staking, material coordination, property owner contacts, and right-of-way restoration. Specifically, the contractor will install 48-strand buried fiber optic cable provided by the contractor and 48-strand all-dielectric fiber provided by the District. The project must adhere to RUS Form 515a and IEEE Standard 1333-1994 for guided boring. Work is expected to be awarded by November 25, 2026, with a final completion deadline of April 15, 2027. Bids are due by November 13, 2026, and must include a completed pricing spreadsheet and current all-inclusive equipment and labor rates. Evaluation factors for the award include quoted price, conformance with specifications, past schedule performance, and the bidder's financial responsibility and experience. To qualify, bidders must certify the completion of at least three similar buried fiber optic installation projects within the last five years. Payment terms specify that 95 percent of the price is paid within 30 days of acceptable performance, with 5 percent retained until final acceptance. An optional pre-bid teleconference is scheduled for November 5, 2026, to review contract specifications.
Nebraska Public Power District

POSTED

about 13 hours ago

DEADLINE

in 15 days
NAICS: 237130
New
Federal
B21 Utilities & Site Improvements, Communications & Electrical Infrastructure, Dyess AFB OT Feasibility & Business Feedback
Solicitation # W9126G27R1CSY
The U.S. Army Corps of Engineers, Fort Worth District, is conducting market research via a Sources Sought notice for the B-21 Utilities and Site Improvements project at Dyess Air Force Base, Texas. This initiative aims to establish high-reliability primary electrical power distribution and dedicated fiber-optic communications infrastructure to support the bed-down of the B-21 weapons system. The scope includes the installation of single-mode fiber optic cables, telephone system expansion, power cabling in concrete encased ducts, pole-mounted conductors, and associated transformers and switchgear. The project also encompasses site improvements such as earthwork, grading, and erosion control. The estimated Construction Cost Limitation is $28,550,000, though an $8 million electric substation and specific end-user network equipment are expressly excluded from this contract. The government is currently evaluating whether to utilize a traditional Federal Acquisition Regulation based contract or an Other Transaction Agreement under 10 U.S.C. section 2808a. If a collaborative procurement framework is chosen, a two-phase selection process will be implemented, focusing first on technical capability, past performance, and collaborative execution history, followed by an evaluation of final technical and price proposals. The project must adhere to strict Department of Defense standards, including UFC 1-200-01 for general building requirements, UFC 4-010-01 for antiterrorism, and UFC 4-010-06 for cybersecurity of facility-related control systems. The anticipated period of performance is 690 calendar days from the notice to proceed, with a required beneficial occupancy date of March 8, 2030.
W076 Endist Ft Worth

POSTED

about 14 hours ago

DEADLINE

in 14 days
NAICS: 237130
New
SLED
De Palma Road Electrical Conduit Installation Project
Solicitation # TLARC-819
The County of Riverside is soliciting bids for the De Palma Road Electrical Conduit Installation Project (Project No. D4-0072) located in the Community of Horsethief Canyon, California. The project involves the excavation and backfill of approximately 1,000 feet of trenching, the installation of 685 feet of 1.5-inch and 350 feet of 3-inch electrical conduit and handholes, and the installation of 6-inch Type D concrete curb per County Standard No. 204. All work must adhere to Southern California Edison plans and be completed within 30 working days from the commencement date specified in the County's written order. The estimated project cost is 209,000 dollars. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals by December 2, 2026, at 1:30 P.M. Pacific Time, including a non-collusion declaration and a bid guarantee of 10 percent of the total bid. The awarded contractor must provide performance and payment bonds, comply with California State Labor Code prevailing wage requirements, and adhere to specific affirmative action plans based on contract value and employee count. Payments will be made monthly, with the Owner paying 90 percent of the value of labor and materials incorporated into the work and 75 percent of materials stored on site, subject to certification by the Architect.
COUNTY OF RIVERSIDE

POSTED

about 18 hours ago

DEADLINE

in about 1 month
NAICS: 237130
New
SLED
Installation Of Street Lighting On Raymond Avenue From Maple Street To North City Limits
Solicitation # 2026-IFB-CIV-0549
The City of Pasadena Department of Public Works is soliciting bids under solicitation number 2026-IFB-CIV-0549 for the installation of a new street lighting system on Raymond Avenue, extending from Maple Street to the North City Limits. The project requires the contractor to furnish and install concrete street lighting standards, foundations, LED luminaires and fixtures, conduits, conductors, pull boxes, and other appurtenant work. Key technical deliverables include 29W or 50W LED replacements, galvanized steel conduits, and 6 foot Type S Scroll Arms. The contractor must provide all necessary labor, materials, and equipment, ensuring compliance with the ADA, CBC, Title 24, and PROWAG accessibility guidelines. Bids must be submitted electronically via the City of Pasadena eProcurement Portal by 2:00 pm on November 17, 2026. Qualified bidders must provide evidence of experience with two similar governmental projects and submit several mandatory documents, including Form AA-1, Form AA-2 for labor exceeding 25,000 dollars, a non-collusion declaration, and a DHS contract disclosure. A bid security of five percent of the total bid price is required, and the successful awardee must provide material and faithful performance bonds for 100 percent of the base bid. Work must commence within 15 calendar days of the Notice to Proceed and be completed within 20 working days. Invoicing is handled through the city's Vendor Invoice Portal, with payments issued on Tuesdays and Thursdays.
City of Pasadena Department of Public Works

POSTED

about 18 hours ago

DEADLINE

in 19 days
NAICS: 237130
New
SLED
115kV Transmission Line 1266 Rebuild Stanton North Substation to Dead-End Structure 79
Solicitation # 26-012
Nebraska Public Power District is soliciting sealed bids for Contract No. 26-012 to rebuild approximately 4.05 miles of the 115kV transmission line 1266, extending from the Stanton North substation to Dead-End Structure 79. The scope of work requires the contractor to provide all labor, supervision, equipment, and miscellaneous materials to replace all structures, conductors, shield wires, and hardware. Key technical deliverables include the installation of 28 wood H-Frame tangent structures and one tubular steel monopole dead-end on a drilled pier, upgrading the conductor to 954 kcmil 45/7 ASCR Rail, and installing 0.551 diameter fiber optic ground wire and EHS steel shield wire. The project also involves tree clearing, site preparation, and the removal of existing structures and conductors. Bids are due by 2:00 p.m. CST on December 2, 2026, and must be submitted as sealed hard copies to the Procurement Department in Columbus, Nebraska. The award will be based on the lowest cost and best bid, with evaluation factors including technical conformance, schedule capability, financial standing, and past performance history. Prospective bidders are encouraged to attend an optional pre-bid teleconference and site visit on November 23, 2026. Required submission documents include a signed proposal page, a completed price quotation table, a W-9 form, and bid security in the form of a certified check, irrevocable letter of credit, or bid bond. The successful contractor must provide a performance bond and maintain workers compensation and commercial general liability insurance.
Nebraska Public Power District

POSTED

1 day ago

DEADLINE

in about 1 month

General Info

NAICS

237130 - Power and Communication Line and Related Structures Construction

Place of Performance

Bridgeport, CA, 93517, USA

Set-Aside

NONE

Documents

2

P-481 Energy Resilience Phases 3 & 4 - Mountain Warfare Training Center

PDF, Low prioritysources-sought
Low

Sources Sought Contractor Information and Experience Forms - Project P-481

PDF, Low prioritysources-sought
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navfacsyscom Southwest
Contacts1 person available
OfficeSAN DIEGO, CA, 92132-0001, USA
Office AddressSAN DIEGO, CA, 92132-0001, USA

Full Description

Show more
The Marine Corps Mountain Warfare Training Center Bridgeport (MWTC) is a mountain warfare training center whose mission is to conduct Marine Air Ground Task Force exercises, develop warfighting doctrine, and support research, development, testing, and evaluation (RDT&E) of equipment for use in mountain warfare operations. Readiness is dependent on having a reliable and resilient energy infrastructure. Achieving energy readiness in Bridgeport is challenging for two (2) primary reasons. First, the installation is the last customer on the Southern California Edison (SCE) utility feed. Second, the base is located in an unforgiving, remote, and arduous area of the Sierra Mountains in California. Every year, the base experiences power outages due to extreme snowfall, sub-zero temperatures, forest fires, heat waves, power quality issues, and other planned and unplanned utility grid events. The base regularly operates for minutes up to weeks, off a single generator with aged infrastructure and inadequate controls. This is a significant vulnerability. Bridgeport is addressing these issues with project P-480. The project focuses on enhancing the reliability and redundancy of the electrical distribution system and enhancing resiliency. The end state of this project is a reliable, resilient, efficient, and cybersecure microgrid that will provide the base the ability to operate critical installation services and mission essential functions off the grid for several weeks with N+1 redundancy. Below is the project: P-481 The project must provide a 1 MW generator to increase resilience of base-wide backup system. This generator will augment the renewable energy system, meet the complete power needs of the installation, and provide N+1 redundancy to the existing 1 MW generator. This1 MW generator will primarily run during times of extended island mode, and in support of the DERs, to maximize renewable production and extend available fuel supply. This level of redundancy is crucial to ensure continuity of operations during sub-zero temperature events and during fires when SCE has grid outages. The project must provide 500 kW of solar photovoltaics. The PV systems must connect to the microgrid. The PV must work in conjunction with the BESS to maximize the use of renewable power. In addition, the configuration will allow the base to continue producing, consuming, and charging the BESS with PV-generated electricity, even when MWTC is disconnected from the SCE grid. The project must supply additional electrical infrastructure to accommodate the additional distributed sources throughout the installation. This includes providing conductors, coordinating with SCE, installing disconnects and other requirements to successfully interconnect the additional sources to the grid. These upgrades are required for the installation of the additional PV assets described above to connect to the grid and offset utility costs or extend duration while islanded. The control system that modernizes the equipment must permit synchronization of the SCE power source, two (2) generators, and the BESS along with the PV; the control system must improve power quality and must allow for the installation to remain off SCE power (island) by utilizing power generated from the generators, BESS, and photovoltaic systems on the installation. Currently, photovoltaic systems are not utilized when SCE power is removed and must be manually turned on. The control system must automatically utilize PV even upon loss of SCE power. The control system shall integrate with the point of common coupling and allow for transition between sources of power in order to minimize the installation's loss of power from a utility outage. During periods which the installation is not connected to SCE (islanded), the control system must regulate the output of the photovoltaic systems at the multipurpose building (Building 4044) to stabilize the installation's distribution grid and maintain a minimum load on the generator. In order to utilize the multipurpose building's (Building 4044) photovoltaic systems output after loss of utility power, a fiber optic cable connection must be provided from the controls in Building 2003 to the photovoltaic system. The project must provide microgrid control functions and equipment required to perform these functions. Advanced controls on all DERs must be provided to expand the microgrid and increase system telemetry throughout buildings to increase efficiency and control loads during grid-tied and islanded operations. The controls will provide capabilities including, but not limited to, the following: (a) - Smart controls capable of taking input from the upstream sensors and automatically engaging the necessary DERs to detect, signal and automatically engage the necessary controls and equipment to ensure a continuous flow of - clean electric power to the installation, preventing outages and power fluctuations that can be damaging to electrical and electronic equipment, thereby reducing maintenance and repair costs. (b) providing grid-interactive economic opportunities to produce savings by taking advantage of varying utility rates throughout the day and year. (c) Implement programmed operation modes to optimize base operations based on conditions such as maximum duration, mission-support or normal day-to-day operations. (d) Communications capabilities to promptly and automatically notify personnel if the control system changes system operations, such as when responding to an incoming power fluctuation and engaging installation DERs. The project is to provide and Energy Management Information System (EMIS). The energy management information system (EMIS) must integrate the DDC, AMI, and, microgrid monitoring and control in a single historian, with access to a single software suite for visualization, analytics, and fault detection. This will allow operators to view data in a customized way and be alerted to maintenance needs, energy savings opportunities, and understand interactions between systems that would be otherwise unknown. The project must provide a building to house all of the associated microgrid, building, AMI and any other related utility controls, control/monitoring stations, databases/servers and support personnel. This building is to provide central monitoring/control area for all facility related control systems and equipment including servers, communication nodes and operator interfaces. This project includes engineering calculations and studies as required by FC1-300-09N. However, the coordination, load flow and arc flash studies must determine the best scheme and protection of the entire microgrid for both grid-tied and islanded operations during the design. These studies inform the required electrical upgrades, generate required arc-flash labels, and provide documentation for SCE. This project must provide training, simulation, and documentation. This includes a complete package of standard operating procedures (SOPs) and emergency operating procedures (EOPs) and in-depth training on the system capabilities, operations, functions, etc. Electronic operation, maintenance, and sustainment instruction (eOMSI) manuals for the EMIS and microgrid system, detailing the operation, commissioning, and maintenance of the system must be proviced. The contractor will also provide a simulated environment for the system for training operators, testing upgrades and performing what-if scenarios. The contractors will prepare maintenance schemes, providing maintenance cost, energy cost, manpower and expected equipment reliability data for all developed maintenance schemes. MWTC facilities leadership will determine which scheme to implement, but all developed schemes will be detailed and delivered to MWTC facilities leadership. The manuals will detail system modes from fully automatic to manual, describe how to perform outage drills, and provide detailed information on efficiency when operating in a prescribed mode. A complete mirrored system, "sandbox" environment will be provided to assist with training and to ensure that system changes (such as patching) will not affect system operation. These documents will help ensure the installation maintains the best possible technologically-advanced maintenance plan at the lowest possible cost while maintaining equipment and system reliability and energy conservation. Cybersecurity is critical to implementing this project. Certification and Accreditation is required for all FRCSs included in this project. The control systems (including systems separate from an energy management control system) will be designed, acquired and executed in accordance with DoDI 8500.01, DoDI 8510.01, Department of Defense Risk Management Framework (RMF) per UFC 4-010-06, Cybersecurity of Facility-Related Control systems, and UFC 1-200-01, General Building Requirements Section 3-6.5, and other relevant FRCS cybersecurity requirements. All equipment installed (hardware and software) will be open protocol, have the ability to connect to existing and future systems, and will include the proper firewalls. Upon project completion, the MWTC will have an authority to operate (ATO), and a functional and cybersecure FRCSs. Option 1: Provide an additional 500kW of solar photovoltaics. This would increase the Base Bid solar photovoltaic production from 500kW to 1MW. Option 2: Provide an additional 500kW of solar photovoltaics. This would increase the Base Bid (500kW) and Option 1 (500kW) solar photovoltaic production to 1.5MW. Option 3: Provide an additional 500kW of solar photovoltaics. This would increase the Base Bid (500kW), Option 1 (500kW), and Option 2 (500kW) solar photovoltaic production to 2MW. Option 4: Provide a building to house all of the associated microgrid, building controls, AMI and any other related utility controls, control/monitoring stations, databases/servers and support personnel. This building is to provide central monitoring/control area for all facility related control systems and equipment including servers, communication nodes and operator interfaces. Option 5: The project must Provide 500 kW Battery Energy Storage System (BESS) to augment the BESS installed from another project. Provide an additional 3 MWh of energy. Expand grid-facing energy storage system, which will work in conjunction with distributed energy resources (DERs), to allow the continuous flow of clean power to the MWTC grid. The BESS must allow the MWTC to be entirely powered by renewable energy during most daylight hours, making MWTC a model of resilience in a cold weather environment. During a multi-day winter outage, the storage will balance load and generation between the PV and the new 1 MW generator. While grid connected, the storage will be used to manage peak demand and support the SCE grid by responding to frequency and voltage transients. Furthermore, stabilizing the grid locally might reduce the likelihood of an outage. The system will disconnect if an unstable grid is detected.

More opportunities from Department Of Defense → Navfacsyscom Southwest

Same awarding agency

NAICS: 238990
New
Federal
IDIQ JOC All Other Specialty Trades Projects
Solicitation # N6247324R0035
Solicitation N6247324R0035 is a Firm-Fixed Price Indefinite Delivery Indefinite Quantity Job Order Contract (IDIQ JOC) set aside 100 percent for HUBZone Small Businesses. Managed by NAVFAC Southwest, the contract covers all other specialty trade work under NAICS 238990 at Marine Corps Base Camp Pendleton and Naval Weapons Station Seal Beach, California, and other approved locations. The contract has a total ceiling value not to exceed 49 million dollars, featuring a two-year base period from February 18, 2027, to February 17, 2029, with three additional option years. Individual task orders are constrained by a minimum value of 2,000 dollars and a maximum of 1.5 million dollars. Award will be based on the Lowest Priced Technically Acceptable (LPTA) offer, with non-price factors evaluated on an acceptable or unacceptable basis. These factors include team composition and management, construction experience requiring at least three relevant projects, past performance rated satisfactory or higher, and safety data including DART and TCR rates for the previous five years. Pricing is based on R.S. Means cost data software, and offerors must provide a coefficient breakdown for pre-priced and non-pre-priced work. Contractors must comply with strict administrative requirements, including electronic invoicing via the DoD Wide Area Workflow system and the submission of daily quality control reports. Mandatory certifications include Cybersecurity Maturity Model Certification Level II and adherence to the Davis-Bacon Act for wage determinations. Proposals must be submitted electronically via the PIEE Solicitation Module and include a bid bond of at least 20 percent of the bid price for Proposed Task Order 0001.
All Other Specialty Trade Contractors

POSTED

3 days ago

DEADLINE

in 25 days
View Details
NAICS: 238210
New
Federal
IDIQ JOC TOTAL SMALL-BUSINESS SET-ASIDE FOR ELECTRICAL AND OTHER WIRING INSTALLATION PROJECTS AT VARIOUS GOVERNMENT FACILITIES LOCATED WITHIN THE MARINE CORPS LOGISTICS BASE BARSTOW, MARINE CO
Solicitation # N6247324R2610
Solicitation N6247324R2610 is a Total Small-Business Set-Aside Indefinite Delivery Indefinite Quantity (IDIQ) Job Order Contract (JOC) issued by NAVFAC Southwest. The contract is for electrical and other wiring installation projects, including repair, renovation, and minor new construction, at various government facilities in California, specifically Marine Corps Logistics Base Barstow, Marine Corps Air-Ground Combat Center 29 Palms, Marine Corps Mountain Warfare Training Center Bridgeport, and Naval Air Weapons Station China Lake. The contract has a maximum value of 35,000,000 dollars and a total potential period of performance of eight years, consisting of a two-year base period and two three-year option periods. The government will utilize a Lowest Priced Technically Acceptable (LPTA) source selection process. Proposals are evaluated on a pass/fail basis for non-price factors, including the ability to manage multiple simultaneous projects, experience, past performance, and safety. The award will be made to the lowest-priced offeror that is determined to be technically acceptable and whose price for the seed project, Proposed Task Order 0001, is fair and reasonable. Pricing is based on a bid price coefficient applied to R.S. Means unit prices. Offerors must submit proposals electronically via the PIEE Solicitation Module by November 03, 2026. Required submissions include a CMMC certification form, a bid bond of 5,000 dollars, and detailed exhibits covering team composition, experience, past performance, and safety data. The contract mandates compliance with various federal regulations, including Davis-Bacon wage determinations, OSHA safety standards, and DFARS clauses regarding cybersecurity and restrictions on certain foreign materials and business operations.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

3 days ago

DEADLINE

in 5 days
View Details
NAICS: 562910
Federal
Request for Offer for RADMAC III Parcel E Remedial Action
Solicitation # N6247326RB009
Solicitation N62473-26-R-B-009 is a competitive request for offers under the RADMAC III multiple award contract for the second phase of remedial action at Parcel E, Hunters Point Naval Shipyard in San Francisco, California. The project focuses on remediating non-aqueous phase liquid contamination at Installation Restoration Site 03. Key technical requirements include shoreline excavation, confirmation sampling, shoreline revetment, in-situ stabilization, and the installation of a groundwater containment slurry wall and monitoring wells. The performance period is 60 months from the date of award, with work commencing within 15 calendar days of receipt. The contract will be awarded based on best value using a trade-off process, evaluating technical approach, local hiring, and price. Technical approach is weighted twice as heavily as local hiring, and combined, these non-price factors are approximately equal in importance to price. Offerors must maintain valid radioactive materials licenses from the NRC and the State of California and provide a dedicated Radiation Safety Officer. Compliance with both Service Contract Act and Davis-Bacon wage determinations is required. Proposals must be submitted electronically via the PIEE Solicitation Module, consisting of a combined non-price factor PDF and a separate price schedule in both PDF and Excel formats.
Remediation Services

POSTED

10 days ago

DEADLINE

in 5 days
View Details
NAICS: 561210
Federal
Base Operations Support Contract (BOSC) for Naval Air Weapons Station (NAWS) China Lake, California and Other Locations as Approved
Solicitation # N6247326R9953
Solicitation N6247326R0053 is a total small business set-aside for a single-award, Firm-Fixed Price, Indefinite Delivery Indefinite Quantity performance-based contract to provide Base Operations Support (BOSC) services for Naval Air Weapons Station (NAWS) China Lake, California. The contract encompasses a broad scope of recurring and non-recurring services across 18 annexes, including management and administration, public safety, air and port operations, ordnance, facility management, and environmental services. Specific technical requirements cover a wide array of utilities and maintenance tasks such as electrical power generation, water and wastewater systems, natural gas and steam plants, chiller plant operations, aviation fuel support, ground electronics, custodial services, pest control, integrated solid waste management, and grounds maintenance. The performance period consists of one base year, seven option years, and a six-month extension. The government will utilize a tradeoff process for award, where non-cost factors—specifically corporate experience, past performance, key personnel, quality management systems, and safety—are combined and considered significantly more important than price. Proposals must be submitted electronically via the PIEE Solicitation Portal under the administrative alias N6247326R9953, with the final submission deadline extended to November 12, 2026, at 2:00 PM PST. Contractors are required to adhere to strict regulatory standards, including CMMC cybersecurity levels, various military marking standards for shipping, and mandatory environmental compliance regarding protected species in the Mojave Desert. Invoicing is processed through the Wide Area Workflow system using the Navy Construction/Facilities Management Invoice document type.
Facilities Support Services

POSTED

about 2 months ago

DEADLINE

in 14 days
View Details
NAICS: 541330
Federal
Facility Optimization PlanningThe contract seeks the development of comprehensive facility optimization plans for Navy installations, with a focus on enhancing space utilization, improving operational efficiency, and advancing lifecycle management practices. The work is targeted specifically at Navy facilities in San Diego, California, 92132, and will involve assessing current infrastructure, identifying areas for improvement, and recommending actionable strategies that align with long-term readiness and sustainability goals. The effort falls under NAICS code 541330, indicating it is a professional, scientific, and technical service related to architectural and engineering activities, and is structured as a subcontract within the Department of Defense’s broader facility management initiatives under Navfacsyscom Southwest. Although no solicitation number or point of contact is provided, the contract was posted on July 10, 2026, and does not specify any set-aside classifications, meaning it is open to all eligible subcontractors regardless of size or status. The scope requires technical expertise in facility planning, data-driven analysis of space usage patterns, and integration of maintenance and modernization timelines to extend asset life and reduce waste. Contractors are expected to deliver detailed plans that support the Navy’s mission-critical operations through smarter use of physical assets, improved workflow, and proactive lifecycle decision-making without disruption to ongoing activities at the installations.
Engineering Services

POSTED

4 months ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS