Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Pacheco Pumping Plant Pump 12 Rebuild

Active
VW0725State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

N/A

Place of Performance

5750 Almaden Expressway San Jose, California 95118, CA, USA

Set-Aside

NONE

Documents

7

FC 1915 Contractor Safety Qualification Packet

PDF, High priority: read this first9 pages · past-performance
High

ITB VW0725 Bid Table - Pump 12 and Cone Valve

DOCX, High priority: read this first5 pages · bid-schedule
High

ITB VW0725 - Pacheco Pumping Plant Pump 12 Rebuild

PDF, High priority: read this first108 pages · itb
High

Pacheco Pumping Plant Pump 12 Rebuild - Contract A5867PC

DOCX, High priority: read this first18 pages · contract-document
High

Rotovalve Operation and Maintenance Manual - Apache Pumping Units

PDF, High priority: read this firstspecifications
High

Valley Water Insurance Requirements - Contract A5867PC

DOCX, High priority: read this first10 pages · specifications
High

Attachment B - PPP Pump OEM documents.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

Contract opportunity posted

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Purchasing Services Unit #820 Department of Santa Clara Valley Water District
Contacts1 person available
OfficeCA, USA

Full Description

Show more
Scope: The Pacheco pumping plant is a remote facility located in Merced County, on the western side of the San Luis Reservoir. PPP is operated by Valley Water and is owned by the United States Bureau of Reclamation (USBR).The Contractor shall furnish all materials, incidentals, auxiliaries, and labor compliant with prevailing wage requirements—led by a trained and certified supervisory-level mechanic—to document, remove, transport, disassemble, inspect, rebuild, reinstall, and test the pump and 24” cone valve in accordance with these specifications and industry best practices.The Contractor shall also coordinate with Valley Water staff to complete all tasks, including, but not limited to, scheduling, work progress, witness inspections, deviations, and all other matters pertaining to the work.
Notes: Bidder’s Security must be submitted in the form of a verified e-Bond through either Surety2000 at http://www.surety2000.com or Tinubu at https://www.tinubu.com/ebonding in PlanetBids before the latest date and time for submitting Bid Proposals as specified in the Procurement Schedule. The PlanetBids contract ID for this project is VW0725. The Bidder’s PlanetBids vendor identification number may also be necessary for the Bidder’s Security.

More opportunities from California → Purchasing Services Unit #820 Department of Santa Clara Valley Water District

Same awarding agency

SLED
COYOTE-ALAMITOS CANAL SHOTCRETE REPAIRS
Solicitation # VW0733
The Santa Clara Valley Water District is soliciting bids under solicitation VW0733 for localized shotcrete repairs at three separate locations along the Coyote-Alamitos Canal in and near San Jose, California. The scope of work includes sawcutting and removing damaged shotcrete, preparing substrates, installing approximately 2,750 square feet of 3-inch by 3-inch welded wire mesh, and placing approximately 26.6 cubic yards of 4,000-psi wet-mix shotcrete with a broom finish. The contractor is responsible for all labor, materials, equipment, and environmental protections, including the installation of straw wattles and temporary rain bypasses. Work is scheduled to be substantially completed within 30 calendar days of the Notice to Proceed, with final completion and approval required within 45 days. The desired overall completion date is December 31, 2026. The contract will be awarded to the lowest responsive and responsible bidder based on the Grand Total Bid Price. Bidders must submit their proposals electronically via the PlanetBids portal by November 10, 2026, including a verified e-Bond of at least 10% of the total bid amount. As a public works project, the contract is subject to California Prevailing Wage Law and requires compliance with various labor codes, including non-discrimination and apprentice employment regulations. For contracts exceeding 25,000 dollars, both performance and payment bonds equal to 100% of the bid price are required. Payment will be made per completed line item within 30 days of receipt of a proper invoice, not to exceed the lump sum bid price.

POSTED

16 days ago

DEADLINE

in 13 days
View Details
SLED
On-Call Mechanical Maintenance Services
Solicitation # VW0737
The Santa Clara Valley Water District (Valley Water) is soliciting bids under solicitation VW0737 for on-call mechanical maintenance services. The selected contractor will provide as-needed utility maintenance, troubleshooting, repair, fabrication, like-for-like replacement, restoration, inspection, adjustment, and emergency dispatch support to preserve and restore existing utility systems. This is a public works contract that excludes general building maintenance, staff augmentation, and the creation or expansion of assets beyond their existing intended function. Work is authorized through individual task orders issued by the Project Manager, with specific schedules and locations defined within each order. The contract will be awarded to the lowest responsive and responsible bidder. Responsiveness is based on following all directions and submitting all required documentation, while responsibility is determined by the bidder's experience, resources, safety record, and past performance with public entities. Bidders must provide hourly rates for labor classifications including foremen, journeyman mechanics, welders, millwrights, and fabricators. Required submittals include a bid bond of at least 10 percent of the proposal amount, a non-collusion declaration, and a contractor safety qualification packet. The successful bidder must provide performance and payment bonds totaling 100 percent of the awarded contract amount within ten calendar days of the notice of award. Compliance with California Labor Code is mandatory, including the payment of general prevailing wage rates, adherence to workers' compensation requirements, and the prohibition of wage kickbacks. Contractors must maintain payroll records for four years following the notice of completion and acceptance. All work must be performed in a professional, code-compliant manner and is subject to review and acceptance by Valley Water based on the authorized task order scope and applicable industry standards. Bids must be submitted electronically via the PlanetBids portal by the specified deadline.

POSTED

17 days ago

DEADLINE

in 16 days
View Details
SLED
Generator and Transfer Switch Installation
Solicitation # VW0732
Solicitation VW0732, issued by the Santa Clara Valley Water District, is a lump sum public works contract for the installation of a district-furnished 25 KVA permanent standby generator and a 100A automatic transfer switch at the Bailey Avenue Line Valve Vault. The scope of work includes all labor, materials, and supervision for concrete pad work, equipment mounting, trenching, raceway systems, and the installation of a security fence and locked enclosure. A critical technical requirement is the integration of the system into the District's SCADA system to provide remote start capabilities and status and alarm notifications for operations staff. The project also requires the contractor to handle generator permitting and provide comprehensive project documentation, including as-built drawings and final closeout records. The contract will be awarded to the lowest responsive and responsible bidder based on the Grand Total Bid Price. Bidders must submit a bid bond of at least 10 percent of the total proposal and, if successful, provide performance and payment bonds for 100 percent of the contract value. Compliance with California prevailing wage rates, OSHA regulations, and NEC standards is mandatory. Additionally, bidders must demonstrate a good faith effort to include DGS-certified small businesses and provide a conflict of interest disclosure. The project involves a rigorous inspection process, including preliminary and final inspections by Valley Water to verify that workmanship meets industry standards and all functional requirements are met through testing and commissioning.

POSTED

30 days ago

DEADLINE

in 2 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS