Pacific Rock Quarry Expansion Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Pacific Rock seeks approval for a 60-year extension to its surface mining operations, authorizing the expansion of its existing facility to mine and export up to 29.7 million tons of material, with an annual limit of 468,000 tons and a daily cap of 1,500 tons. The project includes excavation across 172.8 acres within a 204.4-acre CUP area, with operations conducted Monday through Saturday from 7:00 a.m. to 4:00 p.m., and a maximum of 60 truckloads per day for combined hauls of aggregate, soil, concrete, and asphalt. The mining process involves blasting, mechanical sorting, crushing, and stockpiling, with materials segregated by size and type for sale as rip-rap, road base, or recycled products. The facility will also import and process up to 100,000 cubic yards of soil and 30,000 cubic yards of concrete and asphalt annually for recycling. The final reclaimed surface will feature three graded pads at elevations of 190, 250, and 300 feet with 1:1 slope ratios and slopes up to 750 feet high, designated for open space and agricultural use. Tree removal will occur as needed, subject to county tree protection regulations. The mine will be expanded incrementally by quadrants, requiring a detailed phasing plan and compliance reports before each phase is approved. Overnight storage of mining equipment and haul trucks is permitted on-site, with 10 parking spaces including one ADA-compliant space. The CUP will expire on June 18, 2086, and all activities must adhere to applicable state codes for vehicle hauling, environmental mitigation, and reclamation standards.

General Info

Pacific Rock seeks 60-year extension to mine 29.7 million tons annually, up to 468,000 tons, with reclamation and recycling operations.

Agency

California → Ventura County

NAICS

212319 - Other Crushed and Broken Stone Mining and QuarryingView NAICS

Place of Performance

Howard Road and Pancho Road, Thousand Oaks, CA, 93010

Set-Aside

NONE

Documents

(3)

Pacific Rock Quarry Expansion Project Notice of Determination LU10-0003

PDFnotice-of-determination

Pacific Rock Quarry Expansion Project Final Environmental Impact Report Volume II Appendices May 2025

PDFenvironmental-impact-report

FEIR_Vol I_Main_May 2025_final_ocr

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Ventura County
Contacts2 people available
OfficeN/A
Organization / Agency
California → Ventura County
Office AddressN/A
Contacts
Jane FarkasJ. Elinor Consulting, Principal/Applicant Representative

Full Description

Show more
Pacific Rock requests that a modified CUP be granted, and an amended Reclamation Plan be approved, to authorize the continued operation and expansion of the existing Pacific Rock surface mining facility for a 60-year period. (See Notice of Determination for additional detail.) The proposed expanded mining facility involves the excavation and export of approximately 13.2 million tons (19.8 million cubic yards) of mined material. The reclamation plan maps, and cross sections depict the volume of material to be excavated and the proposed finished slope contours after each phase of the mining operations are completed. The ultimate configuration of the Final Reclaimed Surface (FRS) of the mine will include three large, graded pad areas. The finished grades of these pads will be at elevations of approximately 190-feet, 250-feet, and 300-feet. The FRS will include slopes of 1:1 (horizonal: vertical) slope ratio with a maximum slope height of approximately 750-feet along the northerly side of the mine. Detailed information on the configuration of the FRS, and on all other requirements for reclamation of the mined lands at the Pacific Rock Mine are included in the proposed amended Reclamation Plan (Exhibit 9). The proposed project to expand the mine includes the eventual removal of protected trees. Authorization for this tree removal is requested as part of the project and must comply with the County Tree Protection Regulations as described in Mitigation Measure 810-6. Surface mining activities will continue to be conducted at the facility using explosives to lift and loosen exposed bedrock. This material will continue to be initially sorted into size classes by pushing the material over a steep slope with a front-end loader or a bulldozer. The heavier (larger) pieces of rock are collected from the base of the working slopes for sale as rip-rap or to be crushed for use as road base or other customer specified materials. Material will be further sorted by passing through vibrating scalp screens. Material that does not pass through the screens will be crushed and conveyed back to the screens for additional sorting. Materials will continue to be placed in stockpiles on the mining site and segregated by material type and grain size. In addition to the production and export of mined materials, the facility will also import concrete, asphalt, and soil to the site to be processed and recycled. Mined materials will continue to be exported from the site to market using heavy haul trucks. Such trucks are also used to haul concrete, soil, and asphalt materials to and from the site. All project-related hauling truck traffic is subject to all applicable provisions of the California Vehicle Code and Streets and Highways Code. The authorized mining facility is subject to the operational limitations summarized as follows: Facility Component or Activity To be authorized CUP LU10-0003 CUP Area: 204.4 acres Mining (Excavation) Area and Facilities: 172.8 acres Reclamation End Use: Open Space and Agriculture Annual Production: 468,000 tons Maximum Production (Export) Per Day: 1,500 tons Surface Mining and Processing Methods: Blasting, sorting, processing (crushing) and stockpiling. Structures and Equipment: Aggregate processing facilities, mobile equipment, bunkers, scale, scale house, storaqe bins, etc. Soils Imports and Exports: A maximum of 100,000 cubic yards per year Concrete and Asphalt Recycling: A maximum of 30,000 cubic yards per year Day and Hours of Operation, Mining Excavation and Processing: Monday through Saturday, 7:00am to 4:00pm Maximum Daily Haul Truck Traffic (combined trips for the hauling of aggregate, soil, concrete and asphalt): 120 one-way trips (60 truckloads) per operating day (no change from previous CUP). Maximum material volume excavated and exported from the site under this permit and associated Approved Reclamation Plan: 29,700,000 tons (19,800,000 cubic yards) Vehicle Parking Spaces: 10, including one ADA space Overnight parking of material haul trucks and storage of mobile mining equipment: Mobile mining equipment appurtenant to the subject mining facility and hauling trucks are authorized to be stored overnight on the project site. CUP term limit: 60-years, expiring on June 18, 2086. The mined lands at the site will be reclaimed to an end use of open space and agriculture in accordance with the proposed amended Reclamation Plan. This mining expansion authorized by this project description is anticipated to occur in phases by quadrants. Condition No. 32, Mine Expansion Phasing Plan, requires the development of a Mine Expansion Phasing Plan which identifies the geographic quadrants for expansion of the mined area within the CUP boundary. Prior to the issuance of a Zoning Clearance authorizing expansion and ground disturbing activities within an identified quadrant, the Permittee must submit to the Planning Division for review and approval a Permit Conditions of Approval/ Mitigation Monitoring and Reporting Program (COAs/MMRP) Report demonstrating compliance with the applicable permit COAs/MMRP for the requested quadrant.

Similar Contracts

Same NAICS industry code

NAICS: 212319
New
Federal
56--MRG RIPRAP STOCKPILE
Solicitation # 140R4026Q0098
The Bureau of Reclamation’s Upper Colorado Regional Office is seeking information from qualified small businesses to assess their ability to supply, haul, and stockpile riprap for river-maintenance and emergency protection efforts along the Middle Rio Grande in New Mexico. This sources-sought notice, issued under solicitation number 140R4026Q0098 and classified as a total small business set-aside under FAR 19.5, is not a solicitation for proposals but a market research tool to identify capable contractors. The requirement calls for the delivery of 9,680 tons of riprap across three designated sites: 3,300 tons of 12-inch nominal diameter material at Bernalillo, 5,500 tons of 16–24 inch riprap at HWY 380, and 880 tons of 16–24 inch riprap at RM 201.8, with the latter contingent upon approval from Sandia Pueblo. If approval is denied, the material must be redirected to Bernalillo. All work must be completed by July 1, 2027, with mobilization beginning no later than 15 calendar days after the Notice to Proceed. Responses are due by July 8, 2026, at 10:00 AM PST and must be emailed to Savanna Manning at savanna_manning@ios.doi.gov, including the respondent’s SAM.gov Unique Entity Identifier, business size status, capability statement, and details of three similar past projects—all submitted as unclassified Word or PDF files. Contractors must comply with strict material specifications, including a minimum specific gravity of 2.65, absorption not exceeding 2%, sulfate soundness loss under 10%, and angular, clean, uncontaminated rock conforming to ASTM standards. Delivery and stockpiling require dust abatement measures, and all riprap must be weighed by certified public weighmasters with detailed tickets submitted monthly. Safety is paramount: contractors must submit a safety program and traffic control plan 15 days prior to mobilization, designate an onsite safety representative physically present during all operations, and submit monthly accident reports. Material testing results, source locations, and weighmaster certifications must be provided ahead of delivery. Work hours are restricted to Monday through Friday, 6:00 a.m. to 6:00 p.m., and the contractor must secure all access, THPO
Upper Colorado Regional Office

POSTED

2 days ago

DEADLINE

in 4 days
View Details