Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Government of Canada was posted on January 26, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

PARACHÈVEMENT DE L’ÉTANCHÉITÉ DE LA COUVERTURE DU STADE OLYMPIQUE (LOT 0701)

Closed
20118930International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238160
New
SLED
Fishermen's Terminal C-15 Building ImprovementThe Port of Seattle through its Waterfront Project Management division is preparing to undertake significant improvements to Building C-15 at Fishermen’s Terminal, focusing on structural and exterior upgrades to extend the building’s service life and enhance functionality. The project scope includes replacing the entire roof gutter system, installing new rooftop vents, replacing 151 windows, repairing or replacing exterior cladding, and rectifying structural issues in the tower structure. These upgrades aim to address long-term wear, improve weather resistance, and ensure compliance with current building standards. The work is classified under NAICS code 238160, indicating it falls under roofing subcontracting services, and is being managed as a procurement forecast with no specific set-aside designation at this stage. Valarie Jarvi serves as the primary point of contact for inquiries, with Rod Jackson listed as the project manager, both reachable through the Port of Seattle’s official channels. The solicitation is posted on the Port’s internal procurement platform with a published date of July 26, 2026, indicating this is a pre-solicitation notice intended to inform potential contractors and gather market feedback ahead of formal bidding. The physical work will occur exclusively at Fishermen’s Terminal in Seattle, though no specific street address or zip code is provided. Interested parties are directed to the online portal for further details as the procurement process advances.
Waterfront Project Management

POSTED

about 5 hours ago

DEADLINE

N/A
NAICS: 238160
New
Federal
Roof Replacement – Davisville Housing UnitsThe contract entails a full roof replacement for the Davisville Housing Units, requiring complete tear-off of existing roofing, thorough structural inspection, installation of new underlayment, and placement of approved roofing materials that meet federal standards. All work must ensure durability, weather resistance, and compliance with applicable building codes to safeguard the integrity of the housing units. The project is classified as a subcontract under a Total Small Business Set-Aside, meaning only small businesses certified under SBA guidelines are eligible to compete. The North American Industry Classification System code 238160 specifically identifies this as a roofing contract, aligning it with industry-specific requirements for residential construction and repair. The solicitation was posted on July 25, 2026, with a firm deadline for responses set for August 24, 2026, at 5:00 PM. The contracting entity is Ser South Mabo (54000), operating under the Department of the Interior, though specific location details such as city, state, or zip code for the place of performance or office address are not provided. Interested parties must access the opportunity through the provided SAM.gov link to obtain full technical specifications, submission guidelines, and any supplemental documentation necessary for compliance. The contract is structured to support small business participation while ensuring the housing units receive high-quality, federally compliant roofing systems.
Ser South Mabo (54000)

POSTED

1 day ago

DEADLINE

in 29 days
NAICS: 238160
New
Federal
PLUM ORCHARD MANSION GUTTERS AND FLASHING REPLACEMThe contract involves the replacement of copper gutters and flashing at Plum Orchard Mansion and the full roof replacement at Davisville Housing units located within Cumberland Island National Seashore, with work to be performed under a firm fixed-price construction contract governed by FAR Part 36. The solicitation is designated as a Total Small Business Set-Aside under NAICS code 238160, restricting eligibility to small businesses with average annual receipts not exceeding $19.0 million, and requires all offerors to be actively registered in SAM.gov with a valid Unique Entity ID. Proposals must be submitted electronically by August 24, 2026, through SAM.gov, with no hard-copy submissions permitted, and include mandatory representations and certifications attesting to small business status and compliance with federal contracting requirements. A site visit is required, though specific dates are not yet announced, and all technical specifications, evaluation criteria, and detailed performance requirements will only be available in the full solicitation package to be released on or after July 24, 2026. The contracting office is the Department of the Interior, Ser South Mabo (54000), based in Homestead, Florida, with William Vazquez as the primary point of contact for inquiries. Payment details, accounting codes, inspection standards, and packaging requirements are not disclosed in the current pre-solicitation materials but are expected to be detailed in the formal RFP. The work will be inspected and accepted at the project site by the National Park Service, and no alternate delivery or acceptance locations are specified. No cost estimates, CLINs, or option clauses are listed, and the evaluation methodology—including whether award will be based on lowest price technically acceptable or trade-off—is not yet defined. Contractors must monitor SAM.gov daily for amendments and ensure full compliance with all administrative and regulatory obligations prior to submission.
Ser South Mabo (54000)

POSTED

1 day ago

DEADLINE

in 29 days
NAICS: 238160
New
SLED
Wyoming Boys School Roof Replacements - State Construction Dept.The Wyoming State Construction Department is soliciting bids for a roof replacement project at the Wyoming Boys School in Worland, Wyoming, with all submissions due by 1:00 p.m. Mountain Time on August 31, 2026, through the Public Purchase online bidding system. The project entails removing existing single-ply membrane roofing from four dormitory buildings and part of the maintenance building, repairing damaged decking as necessary, installing new roofing materials, flashing, and trim, and replacing any wet insulation. The total scope involves approximately 455 squares of roofing work. All bids must be submitted via the Public Purchase platform using official State of Wyoming forms; only submissions completed and fully uploaded by the deadline will be accepted, as the system locks precisely at the deadline and incomplete submissions will be disqualified. Bidders are required to register on Public Purchase in advance, noting that account activation may take up to 24 hours, and must access all project documents, addenda, and responses to questions exclusively through the website. Questions regarding the bid must be submitted via Public Purchase no later than 1:00 p.m. MT on August 17, 2026, with all answers provided to all prospective bidders by August 21, 2026, through official addenda or posted responses on the platform; no inquiries received after the cutoff date will be addressed, and communication via phone, email, or fax is not permitted. The solicitation number is 27-0674, and the bid documents, including specifications and plans, are available for download only to registered users on Public Purchase. The primary point of contact is Lenora Simpson, reachable at (307) 777-3558 or lenora.simpson1@wyo.gov, with further guidance on registration available through an official guide posted online. Bidders are responsible for monitoring the Public Purchase site regularly for updates, addenda, and clarifications throughout the bidding period.
Wyoming State Construction Department

POSTED

2 days ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The contract involves the complete provision of labor, materials, equipment, machinery, services, and all related accessories necessary for the installation of the waterproofing system on the metal roof of the Olympic Stadium in Montréal. The scope encompasses tasks such as fabrication, delivery, storage, installation, testing, commissioning, and warranty of the materials and equipment as detailed in the plans and specifications prepared by STGM. The contractor is responsible for supplying everything required for a complete and compliant installation, including documentation, scaffolding if needed, testing devices, and all safety and protection measures. Coordination with the construction manager and the Olympic Park staff is essential to secure workspace, storage areas, and site access, ensuring the smooth progress of the project. Additional requirements include the submission of shop drawings, technical data sheets, certificates, and work methods for approval; daily cleaning and maintenance of the worksite; traffic control and signaling compliant with the project's safety program; management of environmental nuisances such as noise, dust, and contaminants; execution of required tests and related documentation; waste disposal in approved locations; and strict adherence to protection of existing surfaces and structures. The contractor must also ensure proper mobilization, lifting plans approved by a certified engineer, and installation of temporary protections like fences and guardrails. All activities, especially those involving work at height, must follow approved methods in coordination with the construction management, with mandatory participation in daily coordination meetings to harmonize site operations.

General Info

Complete waterproofing installation on Montréal Olympic Stadium roof including materials, labor, testing, safety, and coordination.

Agency

Government of Canada → Parc olympique

NAICS

238160 - Roofing ContractorsView NAICS

Place of Performance

Montréal, CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Parc olympique
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → Parc olympique
Office AddressN/A
Contacts
Ndiaye BoubacarContracting Authority

Full Description

Show more
Les travaux consistent principalement en la fourniture de la main-d'œuvre, des matériaux, des équipements, du matériel et des services nécessaires pour exécuter l’installation du complexe d’étanchéité de la toiture métallique du Stade olympique. La portée exacte est présentée aux plans et devis du présent appel d’offre. L’ENTREPRENEUR doit notamment fournir (et sans s’y limiter) la main-d’œuvre, la documentation, l'équipement, la machinerie, l'échafaudage si applicable, les supports, les services, les appareils d'essais, les matériaux et tous les accessoires nécessaires pour la fabrication, la fourniture, la livraison, l'entreposage, l'installation, les essais, la mise en service et la garantie de l'équipement et des matériaux, pour les ouvrages décrits ci-haut. Les travaux décrits ci-dessus ne sont pas limitatifs. Les travaux sont définis plus spécifiquement dans les documents et les plans et devis préparés par STGM et bonifiés dans les clauses particulières du présent appel d’offre. Il est entendu que tous les dispositifs ou accessoires nécessaires pour une installation complète doivent être fournis et installés même s'ils ne sont pas spécifiquement décrits. Le contenu du présent article ne doit pas être considéré comme limitatif. Pour plus de détails et de précisions, se référer au plans et devis et autres documents faisant partie du présent mandat. Les annexes O et R (Plans renforcements en structure toiture métallique et élévation des consoles et goulottes sont présentées à titre de complément d’information. Aucun étaiement des dalles existantes n’est autorisé dans le cadre du présent projet. En plus des exigences indiquées au devis, les éléments suivants devront également être inclus dans le cadre du présent contrat: · Tous les équipements, outillages et matériaux nécessaires aux travaux tels que spécifiés aux plans et devis; · Les dessins d’atelier, fiches techniques, certificats, méthodes de travail et échantillons de tous les produits fournis devront être présentés à l’Ingénieur pour approbation; · Faire l’identification de tous les éléments requis selon les prescriptions des devis techniques en respectant les standards du Parc olympique; · Toutes les mesures de sécurité et de protection propre aux travaux du présent appel d’offres; · Le nettoyage et l’entretien de façon journalière du chantier et des accès; · La signalisation et les signaleurs requis pour la circulation sur les sites du projet pour toutes manutentions d’équipement et de matériaux du présent lot, et ce conformément au Programme-cadre de prévention du maître d’œuvre, joint à l’Annexe A du présent document. · Coordination avec le Gérant de construction pour obtenir les espaces d’entreposage et superficie de travail requis dans le cadre des travaux; · Tous les mesurages nécessaires à la réalisation complète des travaux du présent appel d’offres; · Les déplacements des travailleurs sur le site pour atteindre leur lieu de travail; · Les frais de pension et de déplacements de tous les travailleurs et sous-traitants; · La gestion du bruit, de la poussière, des éclats de béton, de la peinture, des odeurs, de l’eau ou de tout autre contaminant propre à ses travaux; · Tous les essais demandés et la documentation s’y rattachant; · Le plan de levage, les procédures de travail et les attestations d’installation temporaire signés et scellés par un ingénieur membre de l’OIQ, si requis; · L’élaboration des méthodes de travail; · L’évacuation de tous les rebuts propres à ses travaux, hors des limites du chantier, dans un endroit approprié, situé aux emplacements définis pour l’entreposage des conteneurs à déchets et en respect des normes en vigueur; · La coordination avec le Parc olympique pour obtenir les accès aux locaux; · L’ENTREPRENEUR a l’obligation de coordonner ses besoins en termes de lieux de travail sur le site lors de rencontres journalières de coordination avec GCPC et les différents intervenants du projet (POD); · Lors des travaux en hauteur, une méthode de travail qui doit être approuvée par le Gérant de construction; · La protection des surfaces et ouvrages existants lors des travaux du présent lot; · Remettre en place toutes les protections provisoires comme les clôtures de protection, les fermetures de plancher et les garde-corps de toutes les ouvertures concernées par ces travaux; · Le hissage de tout son matériel, équipement et outillage; · La mobilisation et l’organisation du chantier et des espaces d’entreposage selon les Plans d’Installation de Chantier (PIC) du Maître d’œuvre;