Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Government of Canada was posted on January 26, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

PARACHÈVEMENT DE L’ÉTANCHÉITÉ DE LA COUVERTURE DU STADE OLYMPIQUE (LOT 0701)

Closed
20118930International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238160
New
Inland Empire Job Corps-Request for Quote Roof Design & Build
Solicitation # inland-empire-job-corps-request-quote-roof-design-build
Management & Training Corporation is seeking quotes for a fixed-price design-build subcontract to construct an over-build enclosure for the lower roof of Building G at the Inland Empire Job Corps Center in San Bernardino, California. The project involves designing and installing a roof covering approximately 800 gross square feet, featuring a 3% sloped roof with a single ply, EPDM 60 mil roofing system over wood or metal decking. The scope includes structural framing that extends existing bearing walls or utilizes a new post-beam system, the installation of three LED strip light fixtures with one emergency backup, and strict adherence to OSHA safety standards and the Architectural Barriers Act Accessibility Standard of 2007. The total period of performance is 240 days, with a requirement to complete the work within 100 consecutive business days following the Notice to Proceed. Bids are due by November 2, 2026, and will be evaluated based on overall best value. This is a small business set-aside opportunity open to various SBA certifications. For bids equal to or greater than $25,000, a bid bond of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. Bidders must conduct a physical site visit and sign an attendance roster to be eligible. The project is subject to Construction Wage Rate Requirements, necessitating compliance with California prevailing wages and the submission of weekly certified payroll reports. Additionally, all inspections and testing must be conducted by an independent, third-party agency registered in California. Required insurance minimums include 1 million dollars per occurrence for general liability, 1 million dollars for auto, and 500,000 dollars for workers compensation.
Inland Empire Job Corps

POSTED

about 7 hours ago

DEADLINE

in 6 days
NAICS: 238160
New
SLED
Mesilla Valley Community of Hope Building 5 Re-roof
Solicitation # 26-27-035
Solicitation 26-27-035, issued by the City of Las Cruces Public Works department, is for the re-roofing of Building 5 at the Mesilla Valley Community of Hope located at 999 W. Amador Avenue, Las Cruces, New Mexico. The project has an estimated total cost of 400,000.00 dollars and involves the removal and replacement of all existing insulation, roof membrane, and metal roofing. The scope of work includes the installation of thermoplastic membrane roofing, standing seam metal roofing, and sheet metal flashing and trim, along with additional insulation and cricketing materials to enhance drainage and performance. Additionally, the contractor must replace ceiling tiles and repair deteriorated stucco and windows at the clerestory. The facility must remain fully operational throughout construction, requiring materials to be procured and delivered prior to demolition to minimize disruption. Bids are due by 2:00 pm on November 3, 2026, and must be submitted via the OpenGov portal. The contract will be awarded based on the lowest individual, grouped, or lump sum unit price, with preferences of up to 10 percent available for New Mexico resident veterans, New Mexico residents, local Las Cruces businesses, and the use of recycled content. Awarded contractors must provide performance and payment bonds, proof of insurance, and adhere to prevailing wage rates as per Wage Decision DA-26-3243-B. All work must comply with SMACNA and AAMA 2605 standards, OSHA safety regulations, and New Mexico Administrative Code licensing requirements. The contract includes a one-year correction period for defective materials and workmanship, with liquidated damages set at 500 dollars per day.
Public Works

POSTED

1 day ago

DEADLINE

in 7 days
NAICS: 238160
New
SLED
TDF - PIF Rooftop Walkway SP
Solicitation # B-54660
The Illinois Department of Human Services is soliciting bids for the installation of approximately 2,000 feet of anti-slip roofing walkway pads at the TDF Rushville facility. The project requires 1,600 feet of Versico brand pads for existing tan TPO roofing and 400 feet of Firestone brand pads specifically for the Gamma housing unit roof. All pads must be 34 inches wide with a minimum thickness of 150 mil, feature a raised diamond plate tread pattern, and include safety yellow edges if available from the manufacturer. Installation must be performed by an approved Versico and/or Firestone installer in accordance with manufacturer specifications and ASTM standards. To be considered responsive, the prime vendor must perform at least 51 percent of the work using permanent, full-time W-2 employees who have been employed for at least 30 consecutive days prior to bid submission. Vendors must certify compliance with the Illinois Prevailing Wage Act, the Illinois Department Human Rights Act, and various state certifications regarding legal entity status, felony convictions, and tax delinquency. The contract includes a 12-month warranty period and allows for termination for convenience with 30 days' written notice. Payments are processed according to the State Prompt Payment Act, and the contract is contingent upon the availability of funds from the Illinois General Assembly or federal sources.
MENTHLTH444 - Mental Health

POSTED

1 day ago

DEADLINE

in 22 days

AI Contract Overview

Show more

The contract involves the complete provision of labor, materials, equipment, machinery, services, and all related accessories necessary for the installation of the waterproofing system on the metal roof of the Olympic Stadium in Montréal. The scope encompasses tasks such as fabrication, delivery, storage, installation, testing, commissioning, and warranty of the materials and equipment as detailed in the plans and specifications prepared by STGM. The contractor is responsible for supplying everything required for a complete and compliant installation, including documentation, scaffolding if needed, testing devices, and all safety and protection measures. Coordination with the construction manager and the Olympic Park staff is essential to secure workspace, storage areas, and site access, ensuring the smooth progress of the project. Additional requirements include the submission of shop drawings, technical data sheets, certificates, and work methods for approval; daily cleaning and maintenance of the worksite; traffic control and signaling compliant with the project's safety program; management of environmental nuisances such as noise, dust, and contaminants; execution of required tests and related documentation; waste disposal in approved locations; and strict adherence to protection of existing surfaces and structures. The contractor must also ensure proper mobilization, lifting plans approved by a certified engineer, and installation of temporary protections like fences and guardrails. All activities, especially those involving work at height, must follow approved methods in coordination with the construction management, with mandatory participation in daily coordination meetings to harmonize site operations.

General Info

Complete waterproofing installation on Montréal Olympic Stadium roof including materials, labor, testing, safety, and coordination.

Agency

Government of Canada → Parc olympique

Place of Performance

Montréal, CAN

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Parc olympique
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → Parc olympique
Office AddressN/A
Contacts
Ndiaye BoubacarContracting Authority

Full Description

Show more
Les travaux consistent principalement en la fourniture de la main-d'œuvre, des matériaux, des équipements, du matériel et des services nécessaires pour exécuter l’installation du complexe d’étanchéité de la toiture métallique du Stade olympique. La portée exacte est présentée aux plans et devis du présent appel d’offre. L’ENTREPRENEUR doit notamment fournir (et sans s’y limiter) la main-d’œuvre, la documentation, l'équipement, la machinerie, l'échafaudage si applicable, les supports, les services, les appareils d'essais, les matériaux et tous les accessoires nécessaires pour la fabrication, la fourniture, la livraison, l'entreposage, l'installation, les essais, la mise en service et la garantie de l'équipement et des matériaux, pour les ouvrages décrits ci-haut. Les travaux décrits ci-dessus ne sont pas limitatifs. Les travaux sont définis plus spécifiquement dans les documents et les plans et devis préparés par STGM et bonifiés dans les clauses particulières du présent appel d’offre. Il est entendu que tous les dispositifs ou accessoires nécessaires pour une installation complète doivent être fournis et installés même s'ils ne sont pas spécifiquement décrits. Le contenu du présent article ne doit pas être considéré comme limitatif. Pour plus de détails et de précisions, se référer au plans et devis et autres documents faisant partie du présent mandat. Les annexes O et R (Plans renforcements en structure toiture métallique et élévation des consoles et goulottes sont présentées à titre de complément d’information. Aucun étaiement des dalles existantes n’est autorisé dans le cadre du présent projet. En plus des exigences indiquées au devis, les éléments suivants devront également être inclus dans le cadre du présent contrat: · Tous les équipements, outillages et matériaux nécessaires aux travaux tels que spécifiés aux plans et devis; · Les dessins d’atelier, fiches techniques, certificats, méthodes de travail et échantillons de tous les produits fournis devront être présentés à l’Ingénieur pour approbation; · Faire l’identification de tous les éléments requis selon les prescriptions des devis techniques en respectant les standards du Parc olympique; · Toutes les mesures de sécurité et de protection propre aux travaux du présent appel d’offres; · Le nettoyage et l’entretien de façon journalière du chantier et des accès; · La signalisation et les signaleurs requis pour la circulation sur les sites du projet pour toutes manutentions d’équipement et de matériaux du présent lot, et ce conformément au Programme-cadre de prévention du maître d’œuvre, joint à l’Annexe A du présent document. · Coordination avec le Gérant de construction pour obtenir les espaces d’entreposage et superficie de travail requis dans le cadre des travaux; · Tous les mesurages nécessaires à la réalisation complète des travaux du présent appel d’offres; · Les déplacements des travailleurs sur le site pour atteindre leur lieu de travail; · Les frais de pension et de déplacements de tous les travailleurs et sous-traitants; · La gestion du bruit, de la poussière, des éclats de béton, de la peinture, des odeurs, de l’eau ou de tout autre contaminant propre à ses travaux; · Tous les essais demandés et la documentation s’y rattachant; · Le plan de levage, les procédures de travail et les attestations d’installation temporaire signés et scellés par un ingénieur membre de l’OIQ, si requis; · L’élaboration des méthodes de travail; · L’évacuation de tous les rebuts propres à ses travaux, hors des limites du chantier, dans un endroit approprié, situé aux emplacements définis pour l’entreposage des conteneurs à déchets et en respect des normes en vigueur; · La coordination avec le Parc olympique pour obtenir les accès aux locaux; · L’ENTREPRENEUR a l’obligation de coordonner ses besoins en termes de lieux de travail sur le site lors de rencontres journalières de coordination avec GCPC et les différents intervenants du projet (POD); · Lors des travaux en hauteur, une méthode de travail qui doit être approuvée par le Gérant de construction; · La protection des surfaces et ouvrages existants lors des travaux du présent lot; · Remettre en place toutes les protections provisoires comme les clôtures de protection, les fermetures de plancher et les garde-corps de toutes les ouvertures concernées par ces travaux; · Le hissage de tout son matériel, équipement et outillage; · La mobilisation et l’organisation du chantier et des espaces d’entreposage selon les Plans d’Installation de Chantier (PIC) du Maître d’œuvre;

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS