Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Government of Canada was posted on January 26, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

PARACHÈVEMENT DE L’ÉTANCHÉITÉ DE LA COUVERTURE DU STADE OLYMPIQUE (LOT 0701)

Closed
20118930International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238160
New
OJCA Gym Roof Core Sampling
Solicitation # ojca-gym-roof-core-sampling
Education Training & Resources LLC is soliciting bids for a subcontracting opportunity to perform roof core sampling at the Oneonta Job Corps Academy in New York. The primary objective is to assess moisture levels in the existing insulation of a flat roof area installed in 1994 and a hip area installed in 2003 to determine if the roof is suitable for a coating over the existing membrane. The scope of work includes moisture assessment, drone footage review, the removal and temporary waterproof patching of roof sections, photo documentation of strata, and professional laboratory analysis. Bids are due by 12:00pm on September 16, 2026, and will be evaluated based on the best overall value rather than the lowest price. Qualified offerors must provide a detailed bid sheet with a cost breakdown, a proposed performance schedule, and all necessary New York State licensing and credentials. Required documentation includes a W-9, Vendor Acknowledgement Form, certificates of liability insurance, and certifications regarding the Davis-Bacon Act and anti-lobbying. The winning bidder must maintain an active registration in Sam.gov with a Unique Entity ID. The contract requires adherence to OSHA regulations, the National Electrical Code, and NFPA Standard No. 101. Final payment is contingent upon the submission of a signed punch list and applicable warranties. This opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, VOSB, and SDVOSB.
Education Training & Resources LLC

POSTED

about 10 hours ago

DEADLINE

in 6 days
NAICS: 238160
New
Federal
Building 20 Atrium Leak Mitigation
Solicitation # 127EAX26Q0107
Solicitation 127EAX26Q0107 is a combined synopsis and request for quotation issued by the USDA for the Building 20 Atrium Leak Mitigation project located at the National Centers for Animal Health in Ames, Iowa. This firm fixed price acquisition is a total small business set-aside under NAICS code 238160 for roofing contractors. The primary objective is to perform comprehensive inspection and testing of the Building 20 atrium system to identify the sources of water leaks. The contractor must deliver a prioritized report in zipped PDF format that includes photographic documentation of the system's condition, recommended repairs, and associated cost estimates to assist the government in budgeting and planning. The project requires a qualified contractor whose personnel possess at least five years of experience investigating leaks in commercial building atrium systems. Key personnel requirements include an OSHA-certified competent person with 30 hours of training serving as the on-site superintendent, while all other employees must have at least 10 hours of OSHA training. Work must commence within 10 calendar days of the notice to proceed and be completed within 90 calendar days. Award will be granted to the highest technically rated offeror, provided the price is fair and reasonable and past performance is acceptable or neutral. Proposals must be submitted as three separate PDF documents, including a signed SF1442, a price proposal for the base period, and a technical proposal covering the work plan, key personnel, and performance schedule.
Csa Southwest 7 Usda-Fs

POSTED

about 14 hours ago

DEADLINE

in 16 days
NAICS: 238160
New
Federal
Removal, Inspection, & Replacement Roofing - 3 remote Forest Service locations
Solicitation # 127EAX26Q0074
Solicitation 127EAX26Q0074 is a Request for Quotation issued by the Coconino National Forest for the removal, inspection, and replacement of roofing at three remote locations in Arizona: the Mt. Elden Fire Lookout Tower, East Pocket Fire Lookout Tower, and Fernow Cabin. The project involves selective demolition, structural inspection of rafters, and the installation of new roofing systems, specifically a TPO roof membrane for Mt. Elden and a simulated wood shake metal shingle system for Fernow Cabin, both utilizing 19/32 inch CDX plywood for re-sheathing. The contractor is also responsible for the re-installation of antennas and lightning protection systems. This is a Total Small Business Set-Aside under NAICS code 238160, with a construction magnitude estimated between 100,000 and 250,000 dollars. The contract requires the awardee to commence work within 10 calendar days of the Notice to Proceed, with a total performance period of 240 calendar days. Award will be based on the best value to the government, evaluating both price and a technical approach that demonstrates the contractor's capability, equipment, and ability to meet the schedule. Key compliance requirements include adherence to the Davis-Bacon Act for prevailing wages, the provision of performance and payment bonds, and strict compliance with the Southwest Interagency Fire Restrictions and Closure Master Operating Plan. All work must be performed on weekdays, and the contractor is responsible for all labor, materials, and the proper disposal of debris at these remote sites.
Coconino National Forest

POSTED

about 14 hours ago

DEADLINE

in 8 days
NAICS: 238160
New
Federal
Multiple Roof Repairs and/or Replacements at FLETC in Charleston, SC
Solicitation # 70LCHS26QPFB00034
Solicitation 70LCHS26QPFB00034 is a Request for Quotation for the repair and replacement of roofs across seven buildings (61, 46, 26, 16, 286, 1792, and 23) at the Federal Law Enforcement Training Center (FLETC) in Charleston, South Carolina. This procurement is a total small business set-aside under NAICS code 238160. The scope of work includes the demolition of existing roofing systems, installation of new weather-tight roofing, and specific exterior CMU restoration for Building 1792. The government intends to award a firm-fixed-price contract with a performance period of 365 calendar days from the notice to proceed. Key technical requirements include the provision of a 20-year no dollar limit manufacturer warranty for most systems and a 15-year warranty for specific fluid-applied restorations. The government will utilize a Lowest Price Technically Acceptable (LPTA) source selection approach, where quotes are evaluated on a pass/fail basis regarding technical factors, including the subcontractor management plan and the realism of the phasing plan. Quotations must be submitted electronically by 11:00 AM EDT on September 11, 2026. The contract is subject to the Davis-Bacon Act under wage determination SC20260023 and requires performance and payment bonds. Due to the secure nature of the facility, all contractor personnel must undergo background investigations and suitability checks to obtain necessary access badges. Liquidated damages for delays are set at 879.00 dollars per day.
Fletc Charleston Procurement Office

POSTED

about 14 hours ago

DEADLINE

in 6 days
NAICS: 238160
New
Federal
Building 333 - Roof Repair
Solicitation # W519TC-26-R-A067
The United States Army Contracting Command - Rock Island is soliciting proposals for a Firm-Fixed-Price contract to repair the roof of Building 333 at the Rock Island Arsenal in Illinois. This project is a 100% Small Business set-aside and involves the removal and replacement of approximately 76,600 square feet of deteriorated EPDM roofing and polyisocyanurate insulation. The scope of work includes installing a new fully adhered single-ply EPDM membrane, new insulation, coverboard, and flashing, as well as replacing gypsum board under the canopy soffit and upgrading recessed can lights to LED fixtures. Additionally, the contract includes requirements for parapet cap repairs, with pricing requested per linear foot. The project must be completed within 120 working days following the issuance of the Notice to Proceed, with work expected to commence within 30 calendar days of that notice. Award will be based on the best value, evaluated through a comparative process focusing on technical qualifications, past performance of up to three similar projects from the last five years, and total price. Compliance requirements include active SAM registration, a bid bond, and adherence to Illinois prevailing wage determinations. Performance and payment bonds are required, and the contractor must utilize the Wide Area WorkFlow system for invoicing. All work must be performed in accordance with the provided Statement of Work, technical specifications, and project drawings.
W6QK Acc-Ri

POSTED

about 14 hours ago

DEADLINE

in 1 day

AI Contract Overview

Show more

The contract involves the complete provision of labor, materials, equipment, machinery, services, and all related accessories necessary for the installation of the waterproofing system on the metal roof of the Olympic Stadium in Montréal. The scope encompasses tasks such as fabrication, delivery, storage, installation, testing, commissioning, and warranty of the materials and equipment as detailed in the plans and specifications prepared by STGM. The contractor is responsible for supplying everything required for a complete and compliant installation, including documentation, scaffolding if needed, testing devices, and all safety and protection measures. Coordination with the construction manager and the Olympic Park staff is essential to secure workspace, storage areas, and site access, ensuring the smooth progress of the project. Additional requirements include the submission of shop drawings, technical data sheets, certificates, and work methods for approval; daily cleaning and maintenance of the worksite; traffic control and signaling compliant with the project's safety program; management of environmental nuisances such as noise, dust, and contaminants; execution of required tests and related documentation; waste disposal in approved locations; and strict adherence to protection of existing surfaces and structures. The contractor must also ensure proper mobilization, lifting plans approved by a certified engineer, and installation of temporary protections like fences and guardrails. All activities, especially those involving work at height, must follow approved methods in coordination with the construction management, with mandatory participation in daily coordination meetings to harmonize site operations.

General Info

Complete waterproofing installation on Montréal Olympic Stadium roof including materials, labor, testing, safety, and coordination.

Agency

Government of Canada → Parc olympique

NAICS

238160 - Roofing ContractorsView NAICS

Place of Performance

Montréal, CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Parc olympique
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → Parc olympique
Office AddressN/A
Contacts
Ndiaye BoubacarContracting Authority

Full Description

Show more
Les travaux consistent principalement en la fourniture de la main-d'œuvre, des matériaux, des équipements, du matériel et des services nécessaires pour exécuter l’installation du complexe d’étanchéité de la toiture métallique du Stade olympique. La portée exacte est présentée aux plans et devis du présent appel d’offre. L’ENTREPRENEUR doit notamment fournir (et sans s’y limiter) la main-d’œuvre, la documentation, l'équipement, la machinerie, l'échafaudage si applicable, les supports, les services, les appareils d'essais, les matériaux et tous les accessoires nécessaires pour la fabrication, la fourniture, la livraison, l'entreposage, l'installation, les essais, la mise en service et la garantie de l'équipement et des matériaux, pour les ouvrages décrits ci-haut. Les travaux décrits ci-dessus ne sont pas limitatifs. Les travaux sont définis plus spécifiquement dans les documents et les plans et devis préparés par STGM et bonifiés dans les clauses particulières du présent appel d’offre. Il est entendu que tous les dispositifs ou accessoires nécessaires pour une installation complète doivent être fournis et installés même s'ils ne sont pas spécifiquement décrits. Le contenu du présent article ne doit pas être considéré comme limitatif. Pour plus de détails et de précisions, se référer au plans et devis et autres documents faisant partie du présent mandat. Les annexes O et R (Plans renforcements en structure toiture métallique et élévation des consoles et goulottes sont présentées à titre de complément d’information. Aucun étaiement des dalles existantes n’est autorisé dans le cadre du présent projet. En plus des exigences indiquées au devis, les éléments suivants devront également être inclus dans le cadre du présent contrat: · Tous les équipements, outillages et matériaux nécessaires aux travaux tels que spécifiés aux plans et devis; · Les dessins d’atelier, fiches techniques, certificats, méthodes de travail et échantillons de tous les produits fournis devront être présentés à l’Ingénieur pour approbation; · Faire l’identification de tous les éléments requis selon les prescriptions des devis techniques en respectant les standards du Parc olympique; · Toutes les mesures de sécurité et de protection propre aux travaux du présent appel d’offres; · Le nettoyage et l’entretien de façon journalière du chantier et des accès; · La signalisation et les signaleurs requis pour la circulation sur les sites du projet pour toutes manutentions d’équipement et de matériaux du présent lot, et ce conformément au Programme-cadre de prévention du maître d’œuvre, joint à l’Annexe A du présent document. · Coordination avec le Gérant de construction pour obtenir les espaces d’entreposage et superficie de travail requis dans le cadre des travaux; · Tous les mesurages nécessaires à la réalisation complète des travaux du présent appel d’offres; · Les déplacements des travailleurs sur le site pour atteindre leur lieu de travail; · Les frais de pension et de déplacements de tous les travailleurs et sous-traitants; · La gestion du bruit, de la poussière, des éclats de béton, de la peinture, des odeurs, de l’eau ou de tout autre contaminant propre à ses travaux; · Tous les essais demandés et la documentation s’y rattachant; · Le plan de levage, les procédures de travail et les attestations d’installation temporaire signés et scellés par un ingénieur membre de l’OIQ, si requis; · L’élaboration des méthodes de travail; · L’évacuation de tous les rebuts propres à ses travaux, hors des limites du chantier, dans un endroit approprié, situé aux emplacements définis pour l’entreposage des conteneurs à déchets et en respect des normes en vigueur; · La coordination avec le Parc olympique pour obtenir les accès aux locaux; · L’ENTREPRENEUR a l’obligation de coordonner ses besoins en termes de lieux de travail sur le site lors de rencontres journalières de coordination avec GCPC et les différents intervenants du projet (POD); · Lors des travaux en hauteur, une méthode de travail qui doit être approuvée par le Gérant de construction; · La protection des surfaces et ouvrages existants lors des travaux du présent lot; · Remettre en place toutes les protections provisoires comme les clôtures de protection, les fermetures de plancher et les garde-corps de toutes les ouvertures concernées par ces travaux; · Le hissage de tout son matériel, équipement et outillage; · La mobilisation et l’organisation du chantier et des espaces d’entreposage selon les Plans d’Installation de Chantier (PIC) du Maître d’œuvre;

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS