Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Massachusetts was posted on September 16, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Parking and walkway improvements RKL

Closed
BD-26-1507-FHA01-JJB01-133510State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
West Side Improvements - Bus Stops Package 1
Solicitation # 26-035
The City of Pueblo is soliciting bids for the West Side Improvements - Bus Stops Package 1 (Solicitation 26-035), a project focused on enhancing community connectivity and mobility. The scope of work involves the rehabilitation of 23 existing bus stops on the west side of Pueblo, including the installation of new concrete pads, sidewalks, curb and gutter, and ADA-compliant curb ramps. Additional improvements include the installation of new or replacement benches and illuminated bus stop signs, specifically utilizing Urban Solar PV Stop+ products. The project is funded through a Federal Highway Administration RAISE Grant and requires strict adherence to the Davis-Bacon Act for prevailing wages, Buy America/BABA requirements, and FHWA construction oversight standards. The contract will be awarded to the responsible bidder providing the lowest and most responsive bid. Key requirements for bidders include a bid security of 5 percent of the grand total bid and the submission of performance and payment bonds prior to the Notice to Proceed. The project has a completion timeline of 180 days, with work commencing within three calendar days of contract execution. Contractors must comply with various federal and local mandates, including EEO bulletin board postings, FFATA reporting, and City of Pueblo licensing and sales tax regulations. All materials and workmanship are guaranteed by the contractor and surety for two years following final acceptance.
Public Works

POSTED

about 15 hours ago

DEADLINE

in 1 day
NAICS: 237310
New
SLED
8798
Solicitation # 8798
The Union Lindell Bridge Replacement is a federal infrastructure project (STP-9901(663)) managed by the City of St. Louis Board of Public Service. The scope of work involves the reconstruction of the Union and Lindell Boulevard Bridge over Forest Park Parkway and the MetroLink Railway in St. Louis, Missouri. Key technical requirements include the installation of steel H-piles, drilled shafts, and MSE retaining walls, as well as specific trackwork for MetroLink involving transition tie spacing and rubberized gap fillers. The project is estimated at approximately 27.41 million dollars with a completion timeline of 452 working days and liquidated damages set at 4,300 dollars per day. Bidders must submit proposals electronically via the Bid Express Online Portal, including a 5 percent bid deposit and various compliance affidavits, such as E-Verify enrollment and certifications against discrimination. The contract mandates strict adherence to the Buy America Certification for iron and steel and requires the payment of the higher of the Missouri Department of Labor or Davis-Bacon federal prevailing wage rates. Additionally, the project emphasizes Disadvantaged Business Enterprise (DBE) participation and requires contractors to provide a ten-hour OSHA Construction Safety Program for on-site employees. Final acceptance is contingent upon meeting ADA and PROWAG standards, with quality control for EPS fill and concrete testing conducted by AASHTO accredited facilities.
City of St. Louis Board of Public Service

POSTED

about 15 hours ago

DEADLINE

in about 6 hours

AI Contract Overview

Show more

The Framingham Housing Authority is soliciting open market bids for parking and walkway pavement improvements at Rose Kennedy Lane (locations 667-5 and 667-6) in Framingham, Massachusetts. The project, estimated to cost 312,000.00 USD, involves roads, landscape, and asphalt work performed in accordance with design documents prepared by Graves Engineering, Inc. The procurement is subject to M.G.L. c.30 section 39M and minimum wage rates per M.G.L. c.149 sections 26 to 27H, with workforce participation benchmarks set at 6.9 percent for women and 15.3 percent for minorities. All bids must be submitted electronically via biddocs.com by October 9, 2026, at 1:00 PM EDT, as hard copy submissions will not be accepted. A pre-bid conference is scheduled for September 25, 2026, and requests for information must be submitted online by October 2, 2026, at 1:00 PM EDT. General and sub-bids must include a bid deposit of at least five percent of the greatest possible bid amount payable to the Framingham Housing Authority. The primary point of contact for this solicitation is Purchaser Kristin Davis.

General Info

Bids for 312,000 USD pavement improvements in Framingham due electronically by October 9, 2026.

Place of Performance

Brady Drive Framingham, MA, 01702, USA

Set-Aside

NONE

Documents

34
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · itb
High
HTML, High priority: read this first3 pages · itb
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · itb
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this firstifb
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this firstifb
High
HTML, High priority: read this firstifb
High
HTML, High priority: read this firstifb
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this firstifb
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · itb
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · ifb
High
PDF, High priority: read this firstitb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMassachusetts → Framingham Housing Authority
Contacts1 person available
OfficeBrady Drive Framingham, MA, 01702, USA
Office AddressBrady Drive Framingham, MA, 01702, USA
Contacts

Full Description

Show more
Parking and walkway pavement improvements.THIS PROJECT IS BEING ELECTRONICALLY BID AND HARD COPY BIDS WILL NOT BE ACCEPTED. Please review the instructions in the bid documents on how to register as an electronic bidder. All Bids shall be submitted online at biddocs.com and received no later than the date and time specified.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS