Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on August 13, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Pastour Wetland Project

Closed
715-2526State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Tri Village Park Pier Construction (Choctaw Beach Fishing Pier)
Solicitation # 27-01
Walton County is soliciting bids for the construction of the Tri Village Park Pier, also known as the Choctaw Beach Fishing Pier, as part of a redevelopment project of a former fire station site on Choctawhatchee Bay. The scope of work requires the contractor to provide all labor, materials, and equipment to construct an ADA-accessible fishing pier and kayak launch in strict accordance with the April 29, 2026, construction plans. Other park improvements, such as parking, grading, and demolition, are excluded from this solicitation as they will be handled by County forces. The project must begin within ten business days of the Notice to Proceed, with substantial completion required within 120 calendar days and final completion within 30 days of the issuance of a punch list. The contract will be awarded to the responsible and responsive bidder who submits the lowest lump sum bid, with preference given to businesses maintaining a drug-free workplace program in the event of a tie. Bidders must submit their proposals via the e-Procurement Portal by December 10, 2026, and must include a notarized bid form, a declaration of subcontractors and suppliers, and a completed public entity crimes statement. The successful contractor is required to provide performance and payment bonds equal to the contract price and must adhere to Florida Prompt Payment Act standards and FDOT specifications for layout. The contractor maintains sole responsibility for construction methods, employee safety, and the protection of property throughout the project duration.
Engineering

POSTED

about 17 hours ago

DEADLINE

in 29 days
NAICS: 237990
New
SLED
IFB No. B127194-EY, Brightwood Stream Restoration
Solicitation # B127194
The County of York, Virginia, is soliciting bids for the Brightwood Stream Restoration project in Yorktown, Virginia. This project focuses on the restoration of approximately 2,379 linear feet of the Upper Baptist Run main channel, 800 linear feet of a tributary stream channel, and an offline pond. The primary objectives are to stabilize the channel, improve water quality and habitat, and protect adjacent infrastructure. Key construction activities include planform realignment, channel reshaping, raising the channel bed, installing engineered log habitat structures, boulder walls, and native plantings. Contractors are required to submit a detailed stream bypass pumping plan 30 days prior to use and must ensure all materials are new, having been manufactured within two years of the bid date. The contract will be awarded to the lowest responsive and responsible bidder based on the total base bid price. In the event of a tie, preference is given to Virginia-based firms, with first priority given to those located within the County of York. The period of performance requires substantial completion within 270 calendar days and final completion within 330 calendar days from the Notice to Proceed. Bidders must provide a bid bond, and the successful awardee must provide performance and payment bonds equal to the contract value. Required submittals include a bid form, SWAM information, references, insurance carrier acknowledgement, and a questionnaire. Bids must be delivered to the Central Purchasing office or emailed to [email hidden] by December 16, 2026, and must not be submitted through eVA.
County of York

POSTED

about 18 hours ago

DEADLINE

in about 1 month
NAICS: 237990
New
SLED
Henry H. Bradby Park Phase 1
Solicitation # 2027-7110-114
Isle of Wight County, Virginia, is soliciting bids for the Phase 1 construction of Henry H. Bradby Park, located on a 51.67-acre parcel in Smithfield. The project scope involves approximately 6.63 acres of land disturbance and includes initial site preparation, clearing, demolition, grading, and the installation of civil infrastructure such as drainage and stormwater management. Key deliverables include the construction of public amenities such as parking facilities, walking trails, a playground, a shelter, and recreational courts, as well as final landscaping and site furnishings. The contract is a firm-fixed-price award to the lowest responsive and responsible bidder, with a required substantial completion timeline of 300 days from the notice to proceed and final completion due 45 days thereafter. Because the project is funded through the National Park Service's Land and Water Conservation Fund, it is subject to strict federal oversight. This includes mandatory compliance with the Build America, Buy America Act for material sourcing, as well as adherence to federal civil rights laws and environmental windows for endangered species. Bidders must provide bid, performance, and payment bonds, with bid bonds required for projects exceeding 500,000 dollars. All work must comply with the 2018 Virginia Statewide Building Code and specific approvals from the Virginia Department of Transportation and the Department of Environmental Quality. Bids are due by November 16, 2026, and must be submitted via the designated procurement portal.
Parks & Recreation

POSTED

about 18 hours ago

DEADLINE

in 5 days
NAICS: 237990
New
SLED
IFB No 134548 Billeting Retaining Walls, Drainage and Soil Stabilization
Solicitation # 134548
The California Military Department is soliciting bids for IFB No. 134548 to install a temporary K-rail retaining wall, drainage, and soil stabilization system at Camp San Luis Obispo. The scope of work includes the installation of 480 total feet of retaining walls using 24 precast concrete units, the installation of six grated inlets and six 6-inch-diameter solid outlet pipe routes, and the application of soil stabilizer to create hardened sections between buildings and walls. The project requires a prime contractor holding a California CSLB Class A General Engineering or Class C-12 Earthwork and Paving license. All work must adhere to California public works labor requirements, San Luis Obispo County prevailing wages, and Cal OSHA safety standards. Bidders must attend a mandatory pre-bid job walk on November 17, 2026, and submit all questions by November 20, 2026. Bids are due by November 30, 2026, at 2:00 PM, with the bid opening following at 2:15 PM. The contract will be awarded to the lowest responsive and responsible bidder, with a 5% preference for certified Small Business or Microbusiness enterprises and a 5% goal for Disabled Veteran Business Enterprise participation. Required documentation includes a bid bond, a completed rate sheet, and various certifications including non-collusion and civil rights compliance. Performance and payment bonds are required if the contract exceeds specific monetary thresholds.
California Military Department

POSTED

about 18 hours ago

DEADLINE

in 19 days
NAICS: 237990
New
SLED
Freedom Park Boardwalk Repairs - Boardwalks 1 & 2
Solicitation # 26-8700
Solicitation 26-8700 is an invitation to bid issued by the Collier County Procurement Services Division for the repair and restoration of Boardwalks 1 and 2, as well as Outlooks 1 and 2, at Freedom Park in East Naples, Florida. The project has an anticipated budget of 1,300,000 USD and involves replacing deteriorated decking with IPE wood or equivalent, replacing damaged structural supporting timber, fasteners, and hardware, and repairing or installing new pilings and support beams. Technical requirements include the use of 5500 psi Type IV Portland Cement for concrete repairs and adherence to FDOT and ASCE standards. Contractors must also comply with Florida Statute 255.20 by prioritizing lumber and timber produced within the state and must follow strict environmental health and safety requirements, including the use of floating turbidity barriers to protect the surrounding environment. The contract will be awarded to the lowest responsive and responsible bidder based on the base bid and selected alternates. Bidders are required to submit a 5% bid bond and, upon award, must provide performance and payment bonds for 100% of the contract amount. The project timeline mandates commencement within five calendar days of the start date, with a total completion window of 134 calendar days. A specific Owner's Allowance of 198,120 USD is allocated for unforeseen conditions. Submissions must be made electronically via the OpenGov portal by November 13, 2026, at 3:00 PM, and must include all required bid forms, certifications for E-Verify and immigration law compliance, and a detailed bid schedule.
Procurement

POSTED

about 18 hours ago

DEADLINE

in 9 days

AI Contract Overview

Show more

The Pastour Wetland Project is a development initiative by Polk County, Iowa, aimed at creating a Water Quality Wetland to enhance environmental sustainability and water management in the region. The project is classified under NAICS code 237990, indicating its focus on other heavy and civil engineering construction. The contract is estimated to be valued between $500,000 and $1,500,000, reflecting its substantial scope and importance. The solicitation for bids was posted on August 13, 2025, with a deadline for responses set for September 9, 2025, allowing interested parties a limited window to submit proposals. The project is scheduled to commence around October 1, 2025, with an expected completion date of May 1, 2026. Polk County’s project management is overseen by Shari Harvey, whose contact information is provided for inquiries. The contract is part of Polk County’s efforts to improve water quality infrastructure, and interested vendors can access detailed bid information through the provided online link. The initiative underscores the county’s commitment to environmental enhancement and sustainable development within the specified timeframe.

General Info

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Polk County
Contacts1 person available
OfficeN/A
Organization / AgencyFlorida → Polk County
Office AddressN/A
Contacts

Full Description

Show more
Contract 715-2526 - PASTOUR WETLAND PROJECT involves the development of a Water Quality Wetland in Polk County, Iowa, United States. The project is scheduled to begin around October 1, 2025, with a completion deadline set for May 1, 2026.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS