Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 8 at 2:00 PM EDT

Register Free →

Pavement Installation (Asphalt)

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract titled Pavement Installation (Asphalt) is a subcontract under a Total Small Business Set-Aside designation, exclusively available to small businesses as defined by the SBA, with the NAICS code 237310 indicating highway and street construction. It requires the full placement of hot-mix asphalt pavement, encompassing all phases from base preparation and material laydown to compaction through rolling and precise joint construction, strictly adhering to Specification 403. The work must be performed in alignment with federal standards and is solicited by the USDA Forest Service, specifically under the CSA Southwest 6 office, though the exact location of performance is not specified in the provided data. The solicitation was posted on June 29, 2026, with a mandatory response deadline of July 24, 2026, at 6:00 PM. Bidders must comply with all technical and regulatory requirements outlined in Specification 403 to ensure quality, durability, and safety of the asphalt pavement system. No point of contact or detailed place of performance is provided, but the nature of the work suggests field operations will occur at one or more USDA Forest Service sites. Interested parties must submit proposals through the designated SAM.gov portal before the deadline to be eligible for award.

General Info

Small business subcontract for hot-mix asphalt pavement installation per Specification 403, USDA Forest Service, deadline July 24, 2026.

Agency

Department Of Agriculture → Csa Southwest 6 Usda-FsView Agency

NAICS

237310 - Highway, Street, and Bridge Construction View NAICS

Place of Performance

CA, USA

Set-Aside

SBA

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Csa Southwest 6 Usda-Fs
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Agriculture → Csa Southwest 6 Usda-Fs
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Placement of hot-mix asphalt pavement including base preparation, laydown, rolling, and joint construction per Specification 403.

Similar Contracts

NAICS: 237310
New
SLED
Call 001 612187-134319The project involves the design-build replacement of Bridge C-13-038 over State Route 116 (Chicopee Street) in District 2, Massachusetts, under procurement by the Massachusetts Department of Transportation (MassDOT). This is a lump sum contract structured as a Best Value Design-Build (BVDB) procurement, where selection is based on the lowest overall value rating—the total price divided by the cumulative technical score. The scope encompasses full civil, structural, traffic, stormwater, environmental, and utility coordination, including demolition of the existing bridge, new construction, temporary traffic control, public outreach, asbestos inspection and testing, and invasive species management. All unit prices are defined as all-inclusive, covering design, engineering, project management, quality control, equipment, transportation, installation, utilities, insurance, bonds, and warranty. The contract requires submission of both a technical proposal capped at 40 pages and a separate price proposal via the Bid Express platform, with a mandatory 5% bid bond. The technical evaluation is weighted 65% toward the design-build technical approach and 35% toward project management and coordination, with strict pass/fail gates for submission compliance, proper organization, and bid bond submission. The project must be completed within 2,039 calendar days from the anticipated Notice to Proceed date of December 8, 2026, with adjustments allowed if the completion date falls between December 1 and March 15. MassDOT mandates strict adherence to state laws, including MGL Chapter 149A (public construction labor standards), Chapter 268A (conflict of interest), and Chapter 30, §39M1/2 and §151/2 (procurement compliance). The contractor must implement a comprehensive Quality Control System with dedicated full-time managers for design, construction, and fabrication oversight, including independent oversight at fabrication plants beyond the fabricator’s own program. Non-conformance reports must be mitigated through defined procedures. Affirmative Action and Equal Employment Opportunity compliance is required, with firms of 50 or more employees and contracts over $50,000 needing an approved affirmative action plan on file with MassDOT. Disadvantaged Business Enterprise participation must be actively pursued. The contractor is responsible for all bonding, including performance and payment bonds for the full contract amount, and must comply with insurance and risk management standards. All documentation, including escrowed proposal materials, must be certified as complete and used solely
MASSDOT

POSTED

in about 2 months

DEADLINE

in about 2 months
View Details