Pavement Major Rehabilitation Program - CIP No. STM0404, STM0411, STM0414
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The City of Chula Vista is undertaking a comprehensive pavement rehabilitation program across its roadway network to repair and restore existing infrastructure without expanding capacity or altering the current right-of-way footprint. Work will include cold milling, asphalt concrete overlay, localized asphalt digouts up to 30 inches deep, slurry sealing, and full replacement of pedestrian curb ramps within existing sidewalk and curb return areas. Additional scope encompasses installation of vehicle detection loops, roadway striping, and adjustments to utility valves, boxes, and vaults as indicated on project plans. All construction activities, including material storage and equipment laydown, must occur strictly within the existing public right-of-way in compliance with the Greenbook provisions. The project also requires full traffic control measures, protection of existing utilities and improvements, and complete restoration of all disturbed areas. Construction is expected to last approximately eight to nine months, with all efforts focused on maintaining and upgrading current infrastructure rather than expansion.
General Info
Agency
NAICS
Place of Performance
Various locations throughout the City of Chula Vista, CA 91910-91915, Chula Vista, CA, 91910Set-Aside
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
