Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Pavement Marking and Signage

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for pavement marking and signage involves the application of permanent thermoplastic striping and the installation of highway signage for prime contractors on State of Illinois construction projects. Specifically, the work focuses on the reconstruction and widening of I-294 in Downers Grove, Illinois, utilizing striping trucks and aluminum signage to install overhead sign structures and posts. The project is categorized under NAICS code 238990 and was posted on January 29, 2026. The primary objective is the delivery of completed road markings and installed traffic signs to ensure the highway meets state construction standards.

General Info

Subcontract for thermoplastic striping and highway signage installation on I-294 in Downers Grove.

Place of Performance

Downers grove, IL, 60515, USA

Set-Aside

NONE

Documents

This scope was carved out of 26-557THA-ENGCO-B-50912.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

26-557THA-ENGCO-B-50912 | CHANGE ORDER NOTICE I-19-4478 CMS Tri-State Tollway I-294 Recon/Widening btwn MP32-MP33

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 1 document on the prime contractFrom 26-557THA-ENGCO-B-50912 | CHANGE ORDER NOTICE I-19-4478 CMS Tri-State Tollway I-294 Recon/Widening btwn MP32-MP33
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyIllinois → Construction
ContactsNo contacts available
OfficeN/A
Organization / AgencyIllinois → Construction
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Applies permanent striping and installs highway signage for prime contractors on State of Illinois Construction highway projects, here a reconstruction and widening of I-294. Performs thermoplastic striping and installs overhead sign structures and posts using striping trucks and aluminum signage. Delivers completed road markings and installed traffic signs.

Similar Contracts

Same NAICS industry code

NAICS: 238990
New
EBMUD – SD-462 – Secondary Reactors Rehab. – Phase 2
Solicitation # SD-462
The EBMUD Secondary Reactors Rehabilitation Phase 2 project, solicitation SD-462, is a comprehensive infrastructure project located at the Main Wastewater Treatment Plant in California. With an estimated contract value between 18.5 million and 19.5 million dollars, the scope of work involves the rehabilitation of open and covered concrete structures, the relining or replacement of small and large diameter steel and ductile iron pipes, and the installation of valves and piping appurtenances. Additional requirements include the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, upgrades to instrumentation and electrical systems, replacement of motor control center components, and the installation of new slide gates and access platforms. The project also encompasses excavation, trench work, and surveying of reactor areas. This solicitation is issued by Ranger Pipelines Incorporated and is designated as a Small Business set-aside, encompassing SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone Small Businesses. The project seeks certified DBE, DVBE, and SBE subcontractors for specialized services including coating, concrete rehabilitation, electrical work, welding, and crane services. All subcontractors must comply with applicable state, county, and federal regulations. The bid opening is scheduled for December 2, 2026, at 2:00 PM.
Ranger Pipelines Incorporated

POSTED

about 7 hours ago

DEADLINE

in 12 days
View Details

More opportunities from Illinois → Construction

Same awarding agency

NAICS: 237310
New
SLED
I-26-2070 Tri-State Tollway (I-294) Drainage Improvements and Ramp Removal
Solicitation # I-26-2070
The I-26-2070 Tri-State Tollway (I-294) Drainage Improvements and Ramp Removal project is a unit price contract issued by the Illinois State Toll Highway Authority. The scope of work involves providing all transportation, labor, materials, and equipment necessary to complete drainage improvements and ramp removal. The project is governed by Tollway and IDOT supplemental specifications and standard specifications for road and bridge construction. The period of performance begins upon the issuance of a Notice to Proceed and continues until October 22, 2027, with a final contract expiration date of October 22, 2028. This solicitation is a Small Business Set-Aside under the Small Business Set-Aside Program (SBSP), meaning only qualified small businesses may bid. Award is based on the lowest most responsible and responsive bid, calculated as the Base Bid minus Bid Credits, with a bid credit cap of $30,000.00. Bidders must submit their responses electronically via BidBuy by January 21, 2027. Key requirements include a 5% bid guaranty, performance and payment bonds, and compliance with the Illinois Prevailing Wage Act and the Illinois Human Rights Act. Bids will be rejected as non-responsive if financial disclosures are missing or if the bidder fails to provide evidence of registration in the State of Illinois Program.
Highway, Street, and Bridge Construction

POSTED

about 9 hours ago

DEADLINE

in 2 months
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS