Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Erosion Control and Seeding

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Erosion Control and Seeding involves the installation of erosion control measures, seeding, and mowing for prime contractors on Illinois State Toll Highway Authority projects. The scope of work includes the installation of 23,621 square yards of erosion control blankets and 2,670 feet of perimeter barriers, as well as the application of Class 4 seed and fertilizer. Additionally, the contractor is responsible for mowing 5 acres in accordance with IDOT Standard Specifications to ensure stabilized soil surfaces and established vegetation. The project is managed under the agency ENGCONSTRUCT557 - Engineering - Construction for the state of Illinois, falling under NAICS code 561730. The solicitation was posted on November 19, 2026, with a response deadline of January 21, 2027. There is no specified set-aside status for this contract.

General Info

Subcontract for erosion control, seeding, and mowing for Illinois State Toll Highway projects.

Documents

This scope was carved out of I-26-2070.

The full solicitation package (5 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

I-26-2070 Tri-State Tollway (I-294) Drainage Improvements and Ramp Removal

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 63 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 5 documents on the prime contractFrom I-26-2070 Tri-State Tollway (I-294) Drainage Improvements and Ramp Removal
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyIllinois → ENGCONSTRUCT557 - Engineering - Construction
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs erosion control measures and performs seeding and mowing for prime contractors on Illinois State Toll Highway Authority projects. Installs 23,621 square yards of erosion control blankets and 2,670 feet of perimeter barriers, applies Class 4 seed and fertilizer, and mows 5 acres per IDOT Standard Specifications. Delivers stabilized soil surfaces and established vegetation.

Similar Contracts

Same NAICS industry code

NAICS: 561730
New
SLED
Snow Removal Services Arrow Lakes Apartments and Buttercup Lane Community Center Inchelium, WA
Solicitation # FY27-05
The Colville Indian Housing Authority is soliciting quotations for snow removal and ice melt services at Arrow Lakes Apartments and Buttercup Lane Community Center in Inchelium, WA. The contract period runs from November 19, 2026, to April 01, 2027. The contractor is responsible for clearing designated sidewalks, building entries, approach paths, handicap ramps, and perimeter areas seven days a week on an as-needed basis, specifically responding to snow accumulations of two inches or more. Services may be performed up to two times in a 24-hour period, and the contractor must provide photos with a tape measure to verify snow depth. All debris must be removed from the premises without the use of agency dumpsters. Award is based on price, with a strong preference for qualified Indian-owned economic enterprises or organizations. An Indian-owned entity will be selected if its quotation is the lowest responsive bid or no more than 10% higher than the lowest responsive quotation. Bidders must be registered in the System for Award Management (SAM) and provide proof of liability, auto, and Washington State Industrial insurance. Compliance with TOSHA safety requirements and Colville TERO regulations is mandatory. Payments are processed via HUD-approved pay request forms and require original signatures.
Colville Indian Housing Authority

POSTED

about 9 hours ago

DEADLINE

in 5 days
View Details
NAICS: 561730
New
SLED
Vegetation Management For Fire Safety
Solicitation # SFUSD-PD-FY27_#93
The San Francisco Unified School District is soliciting proposals for Vegetation Management for Fire Safety, with a not-to-exceed contract value of $1,000,000 and the possibility of extension for up to two additional fiscal years. The project involves providing abatement services across 17 school sites in San Francisco, California. Key operational requirements include performing noise-generating work only between 8:00 AM and 5:00 PM, Monday through Friday, and ensuring all debris and equipment are cleared from streets daily. Contractors must provide before-and-after photos of each site with their monthly invoices, which are paid in arrears. The contract requires a one-year warranty on services and adherence to OSHA safety standards and California Division of Industrial Safety specifications for all motorized equipment. To qualify, proposers must hold a valid California C-27 Landscape Contractor License and demonstrate at least three years of experience providing abatement services for public agencies or school districts within the last five years, supported by three verifiable references. The selection process is based on a best overall service package, evaluating a narrative proposal (60 points) and a cost proposal (40 points). All personnel must be identified by visible uniforms and badges, and vehicles must prominently display the contractor's name. There is no specific set-aside status for this solicitation. Proposals must be submitted as PDF attachments to Richelle Hilario by the deadline of December 10, 2026.
San Francisco Unified School District

POSTED

about 12 hours ago

DEADLINE

in 20 days
View Details

More opportunities from Illinois → ENGCONSTRUCT557 - Engineering - Construction

Same awarding agency

NAICS: 237310
New
SLED
I-26-2070 Tri-State Tollway (I-294) Drainage Improvements and Ramp Removal
Solicitation # I-26-2070
The I-26-2070 Tri-State Tollway (I-294) Drainage Improvements and Ramp Removal project is a unit price contract issued by the Illinois State Toll Highway Authority. The scope of work involves providing all transportation, labor, materials, and equipment necessary to complete drainage improvements and ramp removal. The project is governed by Tollway and IDOT supplemental specifications and standard specifications for road and bridge construction. The period of performance begins upon the issuance of a Notice to Proceed and continues until October 22, 2027, with a final contract expiration date of October 22, 2028. This solicitation is a Small Business Set-Aside under the Small Business Set-Aside Program (SBSP), meaning only qualified small businesses may bid. Award is based on the lowest most responsible and responsive bid, calculated as the Base Bid minus Bid Credits, with a bid credit cap of $30,000.00. Bidders must submit their responses electronically via BidBuy by January 21, 2027. Key requirements include a 5% bid guaranty, performance and payment bonds, and compliance with the Illinois Prevailing Wage Act and the Illinois Human Rights Act. Bids will be rejected as non-responsive if financial disclosures are missing or if the bidder fails to provide evidence of registration in the State of Illinois Program.
Highway, Street, and Bridge Construction

POSTED

about 7 hours ago

DEADLINE

in 2 months
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS