Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Structural Steel and Girder Supply

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Documents

This scope was carved out of 27-557THA-ENGCO-B-54761.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

I-25-2001 Tri-State Tollway (I-294) Bridge Construction 107th St to Illinois Rte 43 (Harlem Ave.)

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyIllinois → ENGCONSTRUCT557 - Engineering - Construction
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies structural steel beams, girders, or pre-stressed concrete beams for prime contractors on Illinois Tollway bridge projects. Fabricates and delivers long-lead structural materials to the project site. Delivers fabricated steel or concrete beams.

Similar Contracts

Same NAICS industry code

NAICS: 332312
New
Federal
Lower Monumental Diffuser Grating
Solicitation # W912EF27QA011
Solicitation W912EF27QA011 is a total small business set-aside for the procurement of materials for the Lower Monumental Lock and Dam Adult Collection Channel N Entrance Diffuser Grating in Kahlotus, Washington. Managed by the US Army Engineer District Walla Walla, this firm-fixed-price contract requires the supply and delivery of various components, including 17 American Standard I-beams, 10 angles, 52 aluminum gratings, and associated hardware such as G-clip fasteners, undercut anchors, hex head bolts, and bolt isolation kits. All materials must be new, free of excessive corrosion, and adhere to specific ASTM and ANSI standards, with safety requirements governed by USACE EM 385-1-1(2014). The delivery deadline is January 8, 2027, with a requirement that all materials be delivered within 50 days of the notice of award. Shipments must be delivered to the north side of the Lower Monumental Lock and Dam during normal business hours, Monday through Thursday, with a 15-day prior notification to the government. The contractor is responsible for all transportation costs and must ensure items are marked and labeled according to MIL-STD-130 and MIL-STD-129. Invoicing and payment will be processed electronically through the Wide Area WorkFlow system. Recent amendments have updated technical specifications for the I-beams and aluminum grating measurements and clarified the delivery location.
US Army Engineer District Walla Wal

POSTED

about 21 hours ago

DEADLINE

in 3 days
View Details

More opportunities from Illinois → ENGCONSTRUCT557 - Engineering - Construction

Same awarding agency

NAICS: 237310
New
SLED
I-25-2001 Tri-State Tollway (I-294) Bridge Construction 107th St to Illinois Rte 43 (Harlem Ave.)
Solicitation # 27-557THA-ENGCO-B-54761
The Illinois Tollway is seeking a Construction Manager / General Contractor (CM/GC) for the reconstruction of multiple structures and roadway improvements along the Tri-State Tollway (I-294) in Cook County, specifically between 107th Street and Illinois Route 43 (Harlem Avenue). This Category F project has an estimated value between 150 and 200 million dollars and involves the reconstruction of bridges over 107th Street, the Norfolk Southern Railroad, Southwest Highway, and Illinois Route 43, as well as a culvert over Stony Creek. The project is structured in two phases: Phase One, where the contractor acts as a consultant during the design phase to develop cost models, open book estimates, and project schedules, and Phase Two, where the contractor transitions into the General Contractor role for construction. The procurement follows a two-step, Best Value process. First, a Request for Qualifications (RFQ) will be used to shortlist between two and five proposers based on their Statement of Qualifications, focusing on relevant past project experience and the skills of key personnel. Shortlisted firms will then submit a comprehensive proposal consisting of technical, price, and administrative components. The final award will be based on the highest combined score of the technical and price proposals. Proposers must certify compliance with the Illinois Procurement Code regarding conflicts of interest and disclose any organizational conflicts. Key milestones include the release of the RFQ on December 7, 2026, and the estimated release of the RFP on March 15, 2027.
Highway, Street, and Bridge Construction

POSTED

about 15 hours ago

DEADLINE

in 27 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS