LETTING LOCATION: D4 Procurement Conference Room
POSTING DATES: 08/05/2025 and 08/12/2025
CONTRACT DAYS: 730
CONTRACT EXECUTION DAYS: 10
SPECIAL START DATE: N/A
ACQUIS./FLEXIBLE START TIME: 15
The Improvements, implemented by individual Task Work
Order(s)/Work Document(s) under this Contract, consist of,
but are not limited to, signing and pavement markings
throughout Martin, St. Lucie and Indian River Counties.
BUSINESS DEVELOPMENT INITIATIVE - Bidders must be a "Small
Business" as defined by FDOT. Small business size standards
can be found at
https://www.fdot.gov/equalopportunity/bdi.shtm. For more
information about bidding on BDI projects, please see the
training guide located at
https://www.fdot.gov/equalopportunity/bdi.shtm
Prequalification per Rule 14-22 is not required. Bidders
must complete and submit the Small Business Affidavit (Form
No. 275-000-01) for approval prior to receipt of bid
documents. The form may be accessed at
https://www.fdot.gov/equalopportunity/bdi.shtm It is only
necessary to submit the Small Business Affidavit (SBA) form
once per year. Send a completed and notarized affidavit as
an attachment to
contact@example.gov Bidders
must submit the BDI Reference Sheet (Form No. 275-000-02)
with the bid unless bidder is prequalified in the project's
major work type, per Rule 14-22, Florida Administrative
Code. Upload the completed BDI Reference Sheet (Form No.
275-000-02) as a zip file using the "File Attachment
Upload" folder in the AASHTOWare Project Bids application.
BDI Reference Sheet may be found at
https://www.fdot.gov/equalopportunity/bdi.shtm Proposal
Guaranty of $500 is required for bids over $150,000 and may
be in the form of a Cashier s Check, the BDI Bid or
Proposal Bond (Form No. 375-020-16), or the standard Bid or
Proposal Bond form, Form No. 375-020-09). WORK DRIVEN
CONTRACT: The budgetary ceiling for this contract shall be
One Million dollars ($1,000,000.00) over the two (2) year
term of the contract. The quantities shown on the Bid Price
Proposal are approximate and only represent estimated
planned requirements based on historical or specific
project needs. The Department does not guar-antee any
maximum or minimum quantity, any range of quantities, or
the exact quantities shown for each bid item. The
Department's estimated quantities and the Contractor's bid
price will be used to calculate a total bid amount. This
total bid amount will then be used to determine the low
bidder; however, actual payment under the awarded contract
will be based on actual quantities completed. For this
Contract in which specific sites are not identified at the
time of letting, the Engineer will is-sue a Work Document.
Work Documents will identify the location, description,
amount of work to be accomplished, and the number of
calendar days to complete the work ?.PERFORMANCE BOND: A
Contract / Performance bond is required for this project.
?REQUIRED SUBMITTALS WITH BID: -Form 275-000-02 Business
Development Initiative Reference Sheet must be submitted
with the bid. -PROPOSAL BID GUARANTEE: Proposal Guaranty of
$500 is required for bids over $150,000 and may be in the
form of a Cashier's Check, the BDI Bid or Proposal Bond
(Form No. 375-020-16) or the standard Bid or Proposal Bond
form, Form No. 375-020-09). PLEASE READ STANDARD
SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION FY 2025-26
(SECTION 7-13) FOR INSURANCE LIMITS.