Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Massachusetts was posted on August 20, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Paving for Sheffield Egremont Road in Sheffield, MA

Closed
BD-27-1680-TH152-TH152-132659State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Federal
ND NP THRO 204(1) Buck Hill Road
Solicitation # 6982AF25B000004
Solicitation 6982AF25B000004 is a firm-fixed-price contract issued by the Federal Highway Administration Central Federal Lands Highway Division for the rehabilitation of Buck Hill Road (Route 204) in Theodore Roosevelt National Park, North Dakota. The project, estimated between $5,000,000 and $10,000,000, consists of three primary components: the rehabilitation of approximately 0.72 miles of roadway, deep subexcavation of 1,000 linear feet to stabilize an existing landslide, and the reconstruction and expansion of the Buck Hill Overlook parking lot to accommodate larger vehicles. Key work items include the placement of 2,000 tons of hot asphalt concrete, 5,000 tons of roadway aggregate, 11,000 cubic yards of subexcavation, and the installation of 5,100 linear feet of concrete curb and gutter. The project is open for full and open competition with a price preference for HUBZone small businesses. Construction is anticipated to take place from April 2027 through November 2027, with a mandatory performance period and liquidated damages of $3,900 per calendar day for delays. Bidders must provide original bid bonds and resumes for key personnel, including on-site managers and superintendents. The contract is subject to the Davis-Bacon Act, the Buy American Act, and FP-14 Standard Specifications for Construction of Roads and Bridges. Payment requests must be submitted electronically via the iSupplier (DELPHI) system.
6982AF Central Federal Lands Divisi

POSTED

about 15 hours ago

DEADLINE

in 27 days

AI Contract Overview

Show more

The Town of Sheffield, Massachusetts, is soliciting bids for the paving of Sheffield Egremont Road under solicitation number BD-27-1680-TH152-TH152-132659. The project scope includes approximately 32,000 square yards of 2-inch cold planing, 3,550 tons of 2-inch 9.5mm finish course, and 2,300 gallons of asphalt emulsion for tack coat. The estimated project cost is between $500,000 and $575,000, with all work required to be completed by November 1, 2026. Bidders must be pre-qualified by MassDOT in the Pavement Surfacing class of work and must adhere to Massachusetts Bituminous Concrete specifications. Bids must be submitted in an opaque sealed envelope to the Select Board's Office by September 9, 2026, at 2:00 PM. Required submission documents include the Standard Bid Form, a Certification of Non-Discrimination, and a Certificate of Non-Collusion. Bidders must provide a bid security equal to 5% of the base bid and the successful contractor must furnish 100% performance and payment bonds. The contract is subject to Massachusetts General Laws Chapter 30 Section 39M and requires compliance with prevailing wage schedules and a minimum minority employee percentage of 5% in each class. Evaluation is based on the bidder's responsibility, capability, and prior experience providing similar services.

General Info

Sheffield, Massachusetts paving project for Egremont Road costing between $500,000 and $575,000.

Place of Performance

Sheffield, MA, 01257, USA

Set-Aside

NONE

Documents

20

BD-27-1680-TH152-TH152-132659 Bid Solicitation

HTML, High priority: read this first4 pages · ifb
High

BD-27-1680-TH152-TH152-132659 Bid Solicitation - Paving for Sheffield Egremont Road

HTML, High priority: read this first4 pages · ifb
High

BD-27-1680-TH152-TH152-132659 Bid Solicitation: Paving for Sheffield Egremont Road

HTML, High priority: read this first4 pages · ifb
High

BD-27-1680-TH152-TH152-132659 IFB - Paving for Sheffield Egremont Road

HTML, High priority: read this first4 pages · ifb
High

BD-27-1680-TH152-TH152-132659 IFB - Paving for Sheffield Egremont Road

HTML, High priority: read this firstifb
High

BD-27-1680-TH152-TH152-132659 IFB - Paving for Sheffield Egremont Road

HTML, High priority: read this first4 pages · ifb
High

BD-27-1680-TH152-TH152-132659 Invitation for Bids

HTML, High priority: read this firstifb
High

BD-27-1680-TH152-TH152-132659 Invitation for Bids

HTML, High priority: read this first4 pages · ifb
High

BD-27-1680-TH152-TH152-132659 Invitation for Bids

HTML, High priority: read this first4 pages · ifb
High

BD-27-1680-TH152-TH152-132659 Invitation for Bids

HTML, High priority: read this first4 pages · ifb
High

BD-27-1680-TH152-TH152-132659 Invitation for Bids

HTML, High priority: read this first4 pages · ifb
High

BD-27-1680-TH152-TH152-132659 Invitation for Bids - Paving

HTML, High priority: read this first4 pages · ifb
High

Prevailing Wage Schedule - Sheffield Egremont Road

PDF, High priority: read this first32 pages · wage-determination
High

Sheffield-Egremont Road Paving 2026 IFB

PDF, High priority: read this first17 pages · ifb
High

commbuys-source-page-BD-27-1680-TH152-TH152-132659.html

HTML

commbuys-source-page-BD-27-1680-TH152-TH152-132659.html

HTML

commbuys-source-page-BD-27-1680-TH152-TH152-132659.html

HTML

commbuys-source-page-BD-27-1680-TH152-TH152-132659.html

HTML

commbuys-source-page-BD-27-1680-TH152-TH152-132659.html

HTML

commbuys-source-page-BD-27-1680-TH152-TH152-132659.html

HTML

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from Sep 17, 2026 to Sep 8, 2026.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMassachusetts → TH152 - Town Hall
Contacts1 person available
OfficeSheffield, MA, 01257, USA
Office AddressSheffield, MA, 01257, USA
Contacts
Doug NewtonPurchaser

Full Description

Show more
Paving for Sheffield Egremont Road in Sheffield. Includes approximately 32,000 square yards of 2" cold planing, approximately 3,550 tons of 2" 9.5mm finish course, and approximately 2,300 gallons of asphalt emulsion for tack coat. The estimated project cost is $500,000-575,000.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS