Paving, Leveling and Patching North St. and Paul Croft Way (Short St.) and Sidewalk Installation
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves paving, leveling, patching, and sidewalk installation projects in the City of Ringgold, Georgia, with a total project value estimated between $150,000 and $300,000. The scope includes paving North Street from Cleveland to High Street, which measures approximately 0.28 linear miles and 18 feet wide, requiring traffic control measures, spot leveling, recycled asphalt overlay, bituminous tack coats, and milling at intersection transitions, with no striping planned. Similarly, Paul Croft Way will be paved from Sparks Street to Guyler Street, covering about 0.30 linear miles and 28 feet wide, also requiring traffic control, spot leveling, asphalt overlay, tack coats, and milling, but with a smaller scope. Sidewalk construction is specified for two locations: along Sparks Street from Whitten Street to Cleveland Street at Lafayette Street, and along Boynton Drive from its existing end to Hummingbird Lane. Both sidewalks are to be 5 feet wide, 4 inches deep, with radius forms at intersections, flush with existing ground, and constructed with 4 inches of #89 base stone, broom-finished, backfilled, and seeded. The Sparks Street sidewalk requires approximately 38 cubic yards of concrete over 580 linear feet, while the Boynton Drive sidewalk needs about 14 cubic yards over 190 linear feet. Traffic control will be necessary at all work sites, and no crosswalk striping is included in the scope. The project details and additional information are available through the City of Ringgold’s official solicitation portal.
General Info
Agency
Place of Performance
GA, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Full Description
*Spot Leveling *Recycled Asphalt Conc. Leveling include Bitum Matl and H Lime 1 inch thick---- 96Tons *Recycled Asphalt Conc. 9.5MM Superwave, type 1 Blend include Bitum and H Lime 1 inch thick----------------------------------- 96Tons *Bitum tack coat---- 201 Gallons *Milling required at all intersection transitions *No Striping Paul Croft Way (Short Street) ¿ Paving is to start at Sparks Street and end at Guyler Street. ¿ Paul Croft Way is .30 LM and 28 feet wide. ¿ Traffic control will be needed. *Spot Leveling *Recycled Asphalt Conc. Leveling include Bitum Matl and H Lime 1 inch thick---- 24 Tons *Recycled Asphalt Conc. 9.5MM Superwave, type 1 Blend include Bitum and H Lime 1 inch thick----24 Tons *Bitum tack coat---- 40 Gallons ¿ Milling required at intersection transitions *No Striping Sparks Street Sidewalk ¿ Sidewalk is to start at Whitten Street and continue to Cleveland Street at Lafayette Street. ¿ Sidewalk to be 5 feet wide and 4 inch in depth ¿ Radius form is required at each intersection and connection to existing sidewalk ¿ Sidewalk is to be flush with existing ground ¿ 4 inches of #89 base stone is required ¿ Broom finish is required ¿ Backfill and in finish seeding is required ¿ Traffic control will be needed. *Estimated concrete required (580 linear feet) --- 38 cu yd
*No crosswalk Striping Boynton Drive Sidewalk ¿ Sidewalk is to start at existing termination of sidewalk and continue to Hummingbird Lane. ¿ Sidewalk to be 5 feet wide and 4 inch in depth ¿ Radius form is required at each intersection ¿ Sidewalk is to be flush with existing ground ¿ 4 inches of #89 base stone is required ¿ Broom finish is required ¿ Backfill and in finish seeding is required *Estimated concrete required (190 linear feet) ----- 14 cu yd *No crosswalk Striping See complete ITB at www.cityof ringgoldga.gov
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS