Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Paving Lunn Street

Active
ASQ-2026-1International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Town of Asquith is soliciting bids for the paving of two street segments: Lunn Street from Mather Avenue to Railway Avenue, approximately 473 meters in length, and the 700 block of Cory Street, approximately 122 meters in length. The work requires a six-inch gravel base preparation, lifting and reinstallation of two manholes with their collars, and application of an eight-meter wide asphalt surface with a four-inch crown. The asphalt must be laid in a single lift up to 50 millimeters thick, or as otherwise feasible within a single lift. The contract does not guarantee acceptance of the lowest bid, and all tenders will be evaluated based on criteria not specified in the posting. The solicitation, identified as ASQ-2026-1, was posted on July 23, 2026, with responses due by August 7, 2026. The project is managed by the Saskatchewan Public Sector, and inquiries should be directed to Dylan Desrosiers at the Town of Asquith, via phone or email provided. The work is to be performed entirely within Saskatchewan.

General Info

Pave Lunn and Cory Streets in Asquith with gravel base, manhole work, and asphalt in single lift, bids due August 7, 2026.

Agency

Saskatchewan Public Sector → Town of AsquithView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

SK, CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencySaskatchewan Public Sector → Town of Asquith
Contacts1 person available
OfficeN/A
Organization / Agency
Saskatchewan Public Sector → Town of Asquith
View Agency Profile
Office AddressN/A
Contacts

Full Description

Show more
Paving of portions of two streets. Lunn Street from Mather Ave to Railway Ave ~473m and 700 block of Cory Street ~122m. Will require ~6 inches of gravel prep, lifting of two manholes with collars, 8m top with 4" crown, 50mm asphalt or what can be done in one lift. Lowest or any tender not necessarily accepted.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Fisherman’s Terminal (FT) Entry and Exit Paving RedevelopmentThe Fishermen’s Terminal Entry and Exit Paving Redevelopment Project will comprehensively upgrade the 19th Avenue W entry and exit drives, remove the remaining slab of the Downie Building (C-14), and transform the area into a mix of new parking, green space, and pollinator habitat with integrated stormwater treatment capabilities. Existing pavement in degraded condition will be milled and overlaid, while stormwater infrastructure will be replaced and expanded to divert runoff from the combined sewer system to dedicated storm lines, with water quality treatment applied to qualifying surfaces. A new irrigation system will support the landscaped green areas, including the median within the entry drive, and electric vehicle charging stations will be installed in the newly configured parking zones. The project also includes the addition of a protected two-way bike lane linking the terminal entry to the West Wall bike path, enhanced pedestrian connectivity to the intersection at 21st Avenue W and W Emerson Place, and improved access to the King County Metro bus stop. Lighting will be upgraded throughout the new parking area and connecting pathways, and comprehensive wayfinding systems will be implemented to guide pedestrian and bicycle movement. The redevelopment is led by the Port of Seattle through its Waterfront Project Management office, with key contacts provided for inquiries, and is classified under NAICS code 237310 for heavy and civil engineering construction.
Waterfront Project Management

POSTED

about 3 hours ago

DEADLINE

N/A
View Details
NAICS: 237310
New
SLED
Asphalt Paving & Striping Portwide Unit Price 2026The contract encompasses a wide range of asphalt paving, striping, and related infrastructure improvement services to be performed across multiple locations within the Seattle-Tacoma International Airport, Maritime Properties, and surrounding areas. Work includes new asphalt placement and patching, overlays with fabric, crack sealing, seal coating, profile grinding, hauling and disposal of grinding debris, removal of existing markings, surface preparation for new striping, various types of stripe painting, saw cutting and coring of non-hazardous concrete and asphalt materials, installation of concrete wheel stops, curb repair and replacement, sidewalk lifting and leveling, and upgrades to road drainage systems which may require permits. All work is to be executed under a unit price structure scheduled for performance in 2026, with services distributed across the Port of Seattle’s operational venues. The contract is administered by Port Construction Services under the Port of Seattle, with primary point of contact Heather Bowden available for inquiries via email and phone, and Lesley Miles serving as the designated Project Manager. The North American Industry Classification System code for this procurement is 237310, indicating it falls under Highway and Street Construction. The solicitation is posted as a forecast with no set aside type specified, and detailed information can be accessed through the Port’s official procurement portal. No specific fiscal or bidding deadlines are indicated in the provided data, but performance is anticipated to occur in the 2026 timeframe, with all activities subject to the logistical and regulatory requirements of the Port’s managed sites.
Port Construction Services

POSTED

about 3 hours ago

DEADLINE

N/A
View Details