Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Utah was posted on October 13, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Payson City Main Street Roadway Reconstruction and Utility Replacement from 500 South to 700 South

Closed
10/25 Public WorksState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 221320
New
Federal
Y--GRCA 257282 - Replace Wastewater Plant at South Ri
Solicitation # 140P2026R0101
Solicitation 140P2026R0101 is an unrestricted full and open competition Invitation for Bid issued by the National Park Service, DSC Contracting Services Division, for the replacement of the South Rim Wastewater Treatment Plant at Grand Canyon National Park, Arizona. This design-bid-build project involves the construction of a GD Membrane Bio-Reactor wastewater treatment plant, including new process systems, administrative and support buildings, and utility connections. The scope of work encompasses complete demolition and removal of existing infrastructure, site preparation, grading, paving, fencing, and improvements to the facility access road. The project also requires a 12-month operational support period following construction. The estimated magnitude of construction exceeds 100 million dollars, with a period of performance from February 1, 2027, to February 1, 2030, and a revised assumed Notice to Proceed date of April 1, 2027. The government will utilize a multi-factor, best-value tradeoff process for award, evaluating proposals based on technical experience, technical approach, management approach, key personnel experience, and price. Key personnel requirements include a Project Manager, Construction Superintendent, Quality Control Manager, Safety Specialist, and Historic Preservation Treatment Specialist. Contractors must provide performance and payment bonds and adhere to union prevailing wage rates. Technical requirements emphasize strict cybersecurity hygiene for SCADA/MES equipment, granting the government full access to software source code, and compliance with ADA standards. Invoicing is managed electronically through the U.S. Department of the Treasury's Invoice Processing Platform, requiring a draft review by the Contracting Officer's Representative seven days prior to final submission.
Dsc Contracting Services Division

POSTED

about 17 hours ago

DEADLINE

in 21 days
NAICS: 221320
Federal
Operations and Maintenance (O&M) Services for the SBIWTP
Solicitation # 191BWC26R0009
Solicitation 191BWC26R0009, issued by the International Boundary and Water Commission, seeks a contractor to provide Firm Fixed Price Operations and Maintenance (O&M) services for the South Bay International Wastewater Treatment Plant (SBIWTP) in San Ysidro, California. The contract is structured with a base year running from June 1, 2027, to May 31, 2028, and multiple option years extending through May 2031. A primary objective of the scope is managing plant operations, SCADA systems, and maintenance during the facility's expansion from 25 MGD to 50 MGD. The contractor must ensure 24/7 staffing, including a bilingual operator, and maintain strict compliance with the National Pollutant Discharge Elimination System (NPDES) permit and other regional water quality board regulations. Award will be based on the Highest Technically Rated with a Fair and Reasonable Price method, where non-price factors—such as plant operations, permit compliance, and staffing—are significantly more important than cost. Key requirements include the designation of a Project Manager, Superintendent, Site Safety and Health Officer, SCADA Specialist, and Asset Manager. The contractor is responsible for a wide array of deliverables, including a Phase-In Plan, Preventative Maintenance Plan, and monthly performance reports. Security is a high priority, requiring background investigations for personnel and adherence to NIST standards for protecting Controlled Unclassified Information. Performance will be monitored via a Quality Assurance Surveillance Plan focusing on regulatory compliance, uptime, and effluent quality.
Internat Boundary And Water Commission

POSTED

8 days ago

DEADLINE

in 2 months
NAICS: 221320
Federal
Waste Water Treatment Plant Services
Solicitation # FA448627Q0002
Solicitation FA448627Q0002 is a Request for Quotation issued by the Department of the Air Force for Waste Water Treatment Plant Services at Lajes Field in Praia da Vitoria, Azores, Portugal. The contractor will be responsible for the operation and maintenance of a waste water treatment plant with a capacity of 800,000 gallons per day, as well as the associated lift station, oil-water separator, and grease traps. Key requirements include providing a Lead Operator with a Level II or higher WPI Certification and at least three years of experience, implementing a 52-week preventive maintenance plan, and ensuring compliance with ISO/IEC 17025 laboratory standards and Portuguese decree law 183/2009 for waste landfills. The scope also encompasses corrosion control, painting, and the management of hazardous materials. The government intends to award a single Firm-Fixed-Price contract with a total duration not to exceed 66 months, consisting of a base period and four option periods. This is an unrestricted acquisition, and proposals must be submitted electronically by November 23, 2026, at 14:00 Azores Time. Offers are evaluated through a three-step sequential process: an administrative compliance review, a technical acceptability evaluation based on experience, approach, and a quality control plan, and finally a price evaluation in Euro currency. Award is contingent upon the availability of funds. Payments will be processed electronically via the Wide Area WorkFlow system.
FA4486 765 Abs Conf

POSTED

16 days ago

DEADLINE

in 26 days

AI Contract Overview

Show more

The contract pertains to the third phase of the Payson City Main Street project, focusing on reconstructing the roadway and replacing all utility services within the designated two-block segment from 500 South to 700 South in Payson, Utah. This comprehensive effort involves the removal and replacement of existing culinary waterlines, pressurized irrigation lines, sewer mains and laterals, and the installation of a new storm drain system and power infrastructure. The roadway will be reconstructed from the back of sidewalk to the back of sidewalk, ensuring a complete overhaul of the street surface and underlying utilities to improve infrastructure resilience and traffic flow. The project is estimated to cost between 2 million and 5 million dollars, with a solicitation deadline set for November 13, 2025, and is managed by Payson City under the jurisdiction of Utah. The project documentation includes detailed civil engineering plans, technical specifications, and bid quantity spreadsheets that outline the scope of work, construction standards, and bidding procedures. The plans, prepared by CRS Engineers, specify the technical requirements for site preparation, earthwork, concrete, and utility installations, emphasizing compliance with local standards and safety protocols. The bid documents provide instructions for contractors on submitting proposals, including bid forms, bonds, and contract conditions, while the bid quantities offer a detailed breakdown of estimated work items such as demolition, roadway construction, landscaping, and utility installation. Overall, the project aims to modernize and enhance the roadway infrastructure along Main Street, ensuring improved utility services and roadway durability for the community.

General Info

Place of Performance

UT, USA

Set-Aside

NONE

Documents

3

3-Main Street From 500 S to 700 S Bid Quantities

XLSX, Low priority2 pages · other
Low

Payson Main Street 500 S to 700 S Contract Documents and Technical Specifications November 2025

PDF, Low priority271 pages · contract-document
Low

Payson Main Street Civil Plans 2019-0045 Cover Sheet and General Notes

PDF, Low priority24 pages · other
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyUtah → Payson City
ContactsNo contacts available
OfficeN/A
Organization / AgencyUtah → Payson City
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
This is the third phase of the project to reconstruct the roadway and replace all of the utilities in the Main Street Right-of-Way from 500 South to 700 South. This includes replacing the culinary waterline and laterals, pressurized irrigation waterline and laterals, sewer main and laterals, adding a new storm drain system and power. The roadway will be reconstructed from the back of sidewalk to the back of sidewalk for the two block length.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS