Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 22 at 2:00 PM EDT

Register Free →

Pedestrian Improvement Project

Active
BD-23-1682-DPW22-DPW22-131387State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Pedestrian Improvement Project involves a range of civil construction activities focused on enhancing pedestrian infrastructure, including the installation of cement concrete sidewalks and curb ramps, granite curbing, and driveway surfaces made of both cement concrete and hot mix asphalt. Additional scope includes loam borrow and seeding, relocation of traffic signal posts, removal and resetting of stone walls, and minor water and drainage upgrades, along with the application of signing and pavement markings. The work is to be performed at Cordaville Road in Southborough, Massachusetts, with all contract documents accessible exclusively through ProjectDog.com using Project Code 875841, available for registration beginning July 15, 2026. Bids must be submitted by the deadline of July 31, 2026, at 4:00 PM ET, and the solicitation is issued under reference number BD-23-1682-DPW22-DPW22-131387 by the Massachusetts Department of Public Works, with Tammi Rice identified as the primary point of contact.

General Info

Pedestrian improvements at Cordaville Road include sidewalks, curbs, drainage, and markings; bids due July 31, 2026, via ProjectDog.com.

Agency

Massachusetts → DPW22 - Department of Public WorksView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Cordaville Road Southborough, MA, 01772, US

Set-Aside

NONE

Documents

(2)

commbuys-source-page-BD-23-1682-DPW22-DPW22-131387.html

HTML

commbuys-source-page-BD-23-1682-DPW22-DPW22-131387.html

HTML

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyMassachusetts → DPW22 - Department of Public Works
Contacts1 person available
OfficeCordaville Road Southborough, MA, 01772, US
Organization / Agency
Massachusetts → DPW22 - Department of Public Works
View Agency Profile
Office AddressCordaville Road Southborough, MA, 01772, US
Contacts
Tammi RicePurchaser

Full Description

Show more
The work generally consists of construction of cement concrete sidewalks and pedestrian curb ramps, loam borrow and seed, traffic signal post relocation, granite curb installation, removal and resetting of stone walls, minor water and drainage improvements, cement concrete and hot mix asphalt driveways, signing and pavement markings.
Contract Documents, may be obtained only by registering through ProjectDog.com (Project Code 875841) starting on July 15, 2026

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Fleet Fast EV Charging - ConstructionThe Port of Seattle through its Aviation Project Management Group is forecasting a contract for fleet fast electric vehicle charging infrastructure construction, categorized under NAICS code 237310 for electrical and other construction services. This initiative aims to support the deployment of high-speed EV charging systems tailored for fleet operations, likely targeting airport or port-related vehicle fleets to enhance sustainability and operational efficiency. The project is scheduled for release in 2026, with no set-aside type indicated, suggesting it is open to all qualified contractors. The place of performance and exact location details are not yet specified, but the work will be conducted within the Port of Seattle jurisdiction. Angela Peterson serves as the primary point of contact for inquiries, with Katie Techa designated as the project manager overseeing implementation. Prospective bidders should direct all communications to the provided email addresses and phone numbers. Although the solicitation number and formal timeline are not yet available, interested parties are encouraged to monitor the official portal for updates as the procurement process advances toward a formal Request for Proposal. The contract will involve the design, installation, and integration of fast-charging equipment capable of supporting multiple electric vehicles simultaneously, requiring technical expertise in electrical systems, energy management, and compliance with relevant industry standards.
Aviation Project Management Group

POSTED

about 11 hours ago

DEADLINE

N/A
View Details
NAICS: 237310
New
SLED
Fisherman’s Terminal (FT) Entry and Exit Paving RedevelopmentThe Fishermen’s Terminal Entry Redevelopment Project involves comprehensive upgrades to the entry and exit drives along 19th Ave W, the demolition of the remaining C-14 building slab, and the replacement of its footprint with a mix of new parking spaces and green areas designed as pollinator habitats, potentially incorporating a stormwater treatment facility. Existing pavement in poor condition will be milled and overlaid, while stormwater infrastructure will be fully replaced and expanded to divert runoff from combined sewers to dedicated storm lines, with water quality treatment integrated where qualifying pavement surfaces are replaced. A new irrigation system will support the landscaped areas, and native plantings will be added to the median within the entry drive. Electric vehicle charging stations will be installed in the new parking zone to support sustainable transportation. The project also includes the installation of a protected two-way bike lane linking the terminal entrance to the West Wall bike path, improved pedestrian connectivity to the intersection at 21st Ave W and W Emerson Pl, and enhanced access to the King County Metro bus stop. Lighting will be upgraded throughout the new parking area and connecting pedestrian and bicycle paths, and new wayfinding signage will be implemented to guide circulation. The work is being managed by the Port of Seattle through its Waterfront Project Management office, with primary contact information provided for project inquiries, and is classified under NAICS code 237310 for heavy and civil engineering construction, with a forecast posting date of July 20, 2026.
Waterfront Project Management

POSTED

about 11 hours ago

DEADLINE

N/A
View Details
NAICS: 237310
New
SLED
Asphalt Paving & Striping Portwide Unit Price 2026This contract covers a wide range of asphalt paving, sealing, and surface preparation services to be performed across multiple locations within the Seattle-Tacoma International Airport, maritime properties, and surrounding areas. Work includes installation of new asphalt paving and patching, asphalt overlays with fabric, crack sealing, seal coating, profile grinding, hauling and disposal of grinding spoils, removal and reapplication of pavement markings, concrete and asphalt saw cutting and coring for non-hazardous materials, installation of concrete wheel stops, repair and replacement of curbs, lifting and leveling of concrete sidewalks, and upgrades to road drainage systems, some of which may require permits. All tasks are intended to maintain and improve the condition of airport and port infrastructure. The contract is titled Asphalt Paving & Striping Portwide Unit Price 2026 and is classified as a forecast with a NAICS code of 237310. It is managed by the Port of Seattle through its Port Construction Services division, with primary contact Heather Bowden available via phone and email for inquiries, and Lesley Miles serving as the Project Manager. Although no solicitation number is provided, all details and further information can be accessed through the official Port of Seattle portal. Performance is expected at various sites throughout the port jurisdiction, and pricing will be based on unit rates for the specified tasks.
Port Construction Services

POSTED

about 11 hours ago

DEADLINE

N/A
View Details
NAICS: 237310
New
SLED
609193 NORTON FAP No. CRP/CMQ-0035(071)X Intersection Improvements at West Main Street (Route 123)The contract pertains to intersection improvements at West Main Street (Route 123) in Norton, Massachusetts, under Federal Aid Project No. CRP/CMQ-0035(071)X, with a solicitation number BD-27-1030-0H100-0H002-131515 and an estimated contract value of $2,601,000. The work is managed by the Massachusetts Department of Transportation (MassDOT), with the contracting office located in Park Plaza, Boston, and performance required at the designated project site. Bids must be submitted electronically through www.bidx.com, with no paper submissions accepted, and require a valid vendor code and Digital ID obtained at least 14 days prior to the September 9, 2026 deadline. Contractors must be pre-qualified in the HIGHWAY-CONSTRUCTION category by MassDOT and submit a bid guaranty equal to five percent of the total bid amount. The solicitation mandates compliance with federal and state regulations, including Executive Order 11246 for equal employment opportunity, Title VI and FHWA non-discrimination provisions, and Massachusetts prevailing wage laws. Price adjustments are built into the contract for key materials such as hot mix asphalt, Portland cement, diesel fuel, gasoline, and structural and reinforcing steel, based on published indices. All work must adhere to the Architectural Access Board regulations (521 CMR 1.00 et seq.) to ensure accessibility. No formal evaluation factors, award methodology, or line-item cost breakdowns are specified, though the procurement is governed by Massachusetts General Laws Chapter 30 § 39M. While the contract references several appendices incorporating federal compliance standards and special provisions, no detailed inspection procedures, packaging requirements, payment instructions, contract administration points of contact, or invoicing systems are outlined in the provided documentation.
0H100 - HIGHWAY

POSTED

about 12 hours ago

DEADLINE

in about 2 months
View Details