Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Peltier Road Resurfacing

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Peltier Road, stretching from Lower Sacramento Road to State Route 99 in Stockton, California, is scheduled for resurfacing to address chronic pavement deterioration observed since its last overlay in 1999 and recent chip sealing in 2018. The road, originally built with an unknown method and later reconstructed in 1970 with a 2-inch asphalt concrete surface over 4 inches of asphalt base, now exhibits widespread transverse and longitudinal cracking and lacks adequate shoulder support. The work will involve resurfacing the entire 24-foot-wide roadway with a 0.25-foot layer of Hot Mix Asphalt without the use of paving fabric, while full-depth repairs of 0.50 feet HMA will be implemented at all structural failure points. Asphalt concrete dikes at the railroad crossing will be removed and replaced in-kind, and new 8-foot-long HMA driveways and frontages will be constructed from the edge of pavement. Gravel shoulders, totaling 4 feet in width, will be added to both sides with a 2-foot section graded at an 8% slope and the remaining section conforming to existing terrain. Penetration treatment will be applied at all intersection radii and extending an additional 50 feet or as needed to match adjacent surfaces. A licensed Professional Land Surveyor will verify all existing survey monuments in the field, replace one monument box, and adjust three others to align with the new finished grade. Environmental considerations are integral to the project timeline and execution. The area is predominantly rural with large trees adjacent to the roadway that may support nesting or migratory birds protected under the Migratory Bird Treaty Act, including the Swainson’s Hawk, a state-listed threatened species. To comply with environmental regulations, a pre-construction survey for active nests is recommended if any construction activity occurs between February 15th and September 1st, effectively guiding the seasonal scheduling of work. The project is exempt under CEQA Section 15301(c) as an improvement to an existing facility, and no federal acquisition regulations, formal contract clauses, or standard procurement evaluation factors have been incorporated into the documentation. There are no defined contract values, pricing structures, delivery terms, or invoicing procedures specified, and the agency contact for administrative coordination is Fatima Gutierrez, Assistant Planner with the San Joaquin County Public Works Department. The primary beneficiaries are local residents and travelers who will experience improved road safety, reduced maintenance frequency, and greater reliability on this critical rural

General Info

Resurface Peltier Road with HMA, add gravel shoulders, repair structural failures, comply with bird protection guidelines.

Agency

California → San Joaquin County

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Lower Sacramento Road, Des Moines Road, Stockton, CA

Set-Aside

NONE

Documents

(1)

Notice of Exemption and Environmental Filing Fee Receipt for Peltier Road Resurfacing

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Joaquin County
Contacts1 person available
OfficeN/A
Organization / Agency
California → San Joaquin County
Office AddressN/A
Contacts
Fatima GutierrezAssistant Planner

Full Description

Show more
PELTIER ROAD RESURFACING Project Description Project Location: Peltier Road: Lower Sacramento Road to State Route 99. See attached Vicinity Map. Project Justification: The original construction date and method are unknown for Peltier Road. The existing roadway (from Lower Sacramento Road to SR 99) was reconstructed in 1970 with 2 inches of asphalt concrete (AC)/4 inches of asphalt base (AB). The road was overlaid with AC in 1999 with a varying thickness of 0.25 feet to 0.35 feet. The road has been periodically chip sealed by Road Maintenance with the most recent application occurring in 2018. The existing roadway exhibits frequent transverse and longitudinal cracking throughout the project limits with minimal to no shoulder backing. Scope of Work: The project will consist of: 1. Resurfacing existing 24-foot-wide roadway with 0.25 feet Hot Mix Asphalt (HMA). No paving fabric will be used. 2. Repairing all pavement structural failure areas with full depth 0.50 feet HMA. 3. Removing and replacing asphalt concrete dikes in-kind at the railroad crossing. 4. Constructing HMA driveways and frontages 8 feet in length from edge of pavement. 5. Placing 4-foot-wide gravel shoulders on both sides: 2 feet (8% slope) and 2 feet to conform. 6. Applying Penetration Treatment at all intersection radii plus 50 feet or to conform. 7. Professional Land Surveyor verifying monuments in the field and advising replacement of 1 survey monument box and adjusting 3 survey monument boxes to finished grade. Environmental Setting: In these portions of the San Joaquin County, land usage is primarily rural with single family homes. There are many large trees adjacent to the project area. Nesting and migratory birds, protected by the Migratory Bird Treaty Act, may nest within these trees. Furthermore, the Swainson’s Hawk, a raptor species of concern within the State of California and listed as threatened may nest adjacent to or within the project area. A pre-construction survey for nesting Swainson’s Hawks and other migratory birds is recommended if construction is scheduled to occur from February 15th to September 1st. Beneficiaries: The public will see increased safety and fewer hazards with this well-maintained road. Overall, there will be reduced maintenance concerns and more reliability within the project area.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
27-008 FY26 LMIG Resurfacing Project
Solicitation # 27-008
The City of Sandy Springs is seeking sealed bids for the milling and resurfacing of approximately 22.35 miles of city roadways, requiring a minimum milling depth of one and one-half inches, targeted patching using either 12.5 mm or 19 mm materials as needed, and final paving with 12.5 mm asphalt at a rate of 165 pounds per square yard, or as otherwise directed by the City’s Engineer or authorized representative. The specific roadway segments to be worked are detailed in the Contract Documents, and the City retains the authority to modify the scope by adding or removing segments during the contract term, with corresponding adjustments to traffic control and mobilization costs to reflect those changes. All work must meet the technical specifications outlined, and bid evaluations will prioritize responsiveness and responsibility, with award going solely to the lowest compliant bidder who satisfies all minimum requirements. The solicitation, titled 27-008 FY26 LMIG Resurfacing Project and identified by number PE-66098-NONST-2027-000000144, was posted on August 7, 2026, with responses due by September 9, 2026. The project falls under the jurisdiction of the City of Sandy Springs in Georgia, and all work must be performed within the city limits. Interested bidders must submit sealed proposals by the deadline, and inquiries should be directed to Daniel Ramos, the primary point of contact, via email at DRamos@SandySpringsGA.gov or by phone at 770-206-1477. The contract is open to all qualified respondents without set-aside designations, and detailed specifications are available through the official procurement portal linked in the solicitation.
City of Sandy Springs

POSTED

about 20 hours ago

DEADLINE

in about 1 month
View Details