Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on April 30, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Pensacola Beach Gateway Improvements - Phase II

Closed
PD 24-25.090State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground utilities such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, subsurface investigation, shoring, and site clearing. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with environmental support services including SWPPP and quality control. Kiewit is specifically seeking qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Furthermore, Kiewit prioritizes bidders who can demonstrate an ability to maintain labor harmony on the project. Interested firms must contact Lead Estimator Ken Johnston to receive an Invitation to Bid through the Building Connected electronic system. The deadline for bid submissions is November 18, 2025, at 2:00 p.m.
Kiewit Infrastructure West Co.

POSTED

about 4 hours ago

DEADLINE

in 7 days
NAICS: 237310
New
SLED
RFB-PARKS-MISSISSIPPI RIVER BLVD RETAINING WALLS REBID
Solicitation # 1777
The City of Saint Paul Parks Department is soliciting bids for the Mississippi River Blvd Trail Improvement Project, which involves the removal and reconstruction of retaining walls, trails, and fencing near Princeton Avenue. The scope of work includes the removal of existing Loffelstein walls and bituminous walks, the installation of soldier pile walls with galvanized steel bridge plank lagging, and the paving of a new bituminous trail. The base bid must include an ADA trail transition to connect to the existing trail. Key deliverables include site protection, erosion control, and the installation of concrete pile caps and structural backfill. The contract will be awarded to the lowest responsible base bidder based on an evaluation of their experience, financial resources, and technical capabilities. Bidders must submit their responses via the City of Saint Paul Supplier Portal by December 9, 2026, using the required Excel bid form. Mandatory compliance requirements include adhering to the City of Saint Paul Little Davis-Bacon prevailing wage standards and Affirmative Action/Equal Employment Opportunity specifications. Upon award, the successful contractor must provide performance and payment bonds, certificates of insurance, and human rights compliance documentation. The work is subject to a one-year guarantee from the date of substantial completion.
City of Saint Paul

POSTED

about 12 hours ago

DEADLINE

in 28 days
NAICS: 237310
New
SLED
RFB-PW-SAINT ANTHONY MILL&VERLAY 2026
Solicitation # 1785
The City of Saint Paul Parks Department is soliciting bids for the 2026 Saint Anthony Mill and Overlay project, located along Saint Anthony Avenue and Rondo Avenue between Snelling Avenue and Marion Street. The scope of work focuses on pavement resurfacing via a standard 2-inch mill and overlay, as well as significant pedestrian and safety enhancements. Key deliverables include the construction of curb extensions, ADA-compliant pedestrian ramps, concrete curb replacement, storm sewer installation, and the paving of off-street bike paths. All work must adhere to the City of Saint Paul Department of Public Works governing specifications and the 2026 MnDOT Schedule of Materials Control. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit all documentation through the City of Saint Paul Supplier Portal by December 7, 2026, at 2:00 PM CST. Required financial protections include a performance bond and a payment bond, each equal to 100% of the contract amount, and general liability insurance with a $1,500,000 per occurrence limit. The project is subject to the Little Davis-Bacon Ordinance regarding prevailing wages and includes a Vendor Outreach Program to encourage the participation of local small, woman-owned, and minority-owned businesses. Contractors must also provide a signed statement under oath verifying compliance with minimum criteria per Minnesota Statutes.
City of Saint Paul

POSTED

about 12 hours ago

DEADLINE

in 26 days

AI Contract Overview

Show more

The contract involves developing comprehensive 100% construction plans for an upgraded northern gateway to Pensacola Beach, in collaboration with the Santa Rosa Island Authority and Jacobs Engineering, who are designing the Phase I tolling system structure. The project aims to enhance traffic flow, aesthetics, and safety by incorporating a welcoming gateway, landscaping, a shared multi-use path, and pavement improvements between the Bob Sikes Bridge and the ECUA water tanks. The design must coordinate with the tolling system to ensure seamless integration, minimize congestion caused by the current toll booth, and create an inviting entrance that supports tourism growth. Key components include architectural elements such as signage, lighting, and toll equipment screening, as well as roadway modifications to reduce lanes and improve traffic management, all adhering to relevant standards and codes. An additional design alternate focuses on landscaping and the construction of a shared-use pathway from the bridge to the existing pathway near the toll plaza, with detailed plans for plantings, lighting, and irrigation to complement the new gateway features. The project emphasizes cost-effective use of existing pavement, stormwater management, utility adjustments, and traffic maintenance strategies to minimize disruptions during construction. The contract, valued between five and ten million dollars, is set to be completed within a strict timeline, with responses due by May 21, 2025. The primary point of contact is David Miller, and the project is managed through the Escambia County procurement portal.

General Info

Documents

5
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstrfp
High
PDF, High priority: read this firstspecifications
High
PDF, Low priorityaward
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Escambia Purchasing
Contacts1 person available
OfficeN/A
Organization / AgencyFlorida → Escambia Purchasing
Office AddressN/A

Full Description

Show more
The Escambia County Engineering Department, in collaboration with the Santa Rosa Island Authority, requests 100% construction plans to be developed for an improved northern gateway to Pensacola Beach. The new gateway design will piggy-back a new tolling system structure (Phase I) that is currently being designed by Jacobs Engineering. The selected Consultant must coordinate and collaborate with Jacobs Engineering to ensure the final products aligns with Phase 1 and protects the integrity of the County’s overall goals and objectives. The new gateway should include a welcome structure, new landscaping, new shared multi-use path, and pavement improvements to be located between the south end of the Bob Sikes Bridge and the north end of the ECUA water storage tanks. The existing toll booth facility visually cues motorists to stop in spite of the signage to the contrary increasing traffic congestion. These changes seek to improve traffic efficiency entering the island while collecting the toll and providing an aesthetic greeting to keep tourism thriving on Pensacola Beach. The 2023 Summer Tourist Season saw 8 of the top 25 highest recorded vehicle count days since recording began in 2016.  In 2024, 16 of the top 25 highest recorded vehicle count days were recorded.  The increase during the 2024 season demonstrates the project need. The project design will include two (2) main components and an additive design alternate:Main Components:Gateway Design: The project includes, but is not limited to, a gateway/signage structure, site/area lighting, pavement markings, ADA upgrades, etc. The gateway design will start with a concept design rendering by Escambia County. Design should consider maintainability and meet all applicable state and local codes and standards.   The County will select a final concept for consultant design based on technical requirements once the consultant has reviewed and modified the County provided rendering into a buildable product. The architectural design will have to compliment tolling and CCTV equipment while screening the toll by plate equipment as much as possible while still allowing functionality and maintenance of said equipment. An architectural pleasing toll equipment building or equipment cabinet and a ITS Dynamic Message Sign (DMS) should be included to blend into the surroundings both logistically and aesthetically while meeting Florida building Code and floodplain elevation requirements.  Once the design concept is settled upon, the Consultant will provide an online portal to introduce the public to the concept and to receive online comments.Roadway Improvements: Roadway improvements associated with the gateway and toll system design should result in a reduction in travel lanes in the vicinity of the existing toll plaza.  The intent of the design is two (2) southbound travel lanes in the proposed condition and an emergency lane for a total of 3 tolled lanes.  Geometric design of the travel lanes to remain should consider the gateway design and tolling needs. Roadway improvements shall meet the latest version of the FDOT Manual of Uniform Minimum Standards for Design, Construction and Maintenance for Street and Highways (Florida Greenbook), the Escambia County Technical Specifications for Road and Bridge Construction (County Specs), and the Manual on Uniform Traffic Control Devices (MUTCD) and Latest edition for ADA requirements.  Pavement design shall be provided in conjunction with the proposed tolling location and where pavement does not currently exist, if applicable.  Milling and resurfacing, stormwater design, utility relocation, and signing & pavement marking design will be required as applicable.  Barrier walls, guardrail, and curbing should be considered where necessary for existing and proposed elements located within the clear zone.  Creative ways to utilize existing pavement for roadway improvements should be considered in order to minimize project costs.  Maintenance of traffic (MOT) design phasing shall be provided, which minimizes traffic disruption during peak travel times and special events. The consultant shall indicate appropriate MOT limitations in the plans.Additive Design Alternate:Landscaping & Shared Multi-Use Path: A shared-use pathway shall be designed from the south end of the Bob Sikes Bridge to the beginning of the existing shared-use pathway which officially begins near the existing toll plaza. Landscaping plans for the roadway from the Bob Sikes Bridge to the southern limits of the project shall include all necessary plantings, grassing, lighting, irrigation, etc. to complement the newly separated multi-use trail and the new aesthetically pleasing gateway arch. Please make note of the Timeline and ensure your firm is able to meet the dates on timeline when submitting. The dates are definite, and we must keep the proposed timeline to meet the County's required deadline.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS