Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

PERFORM STRUCTURAL & ROOF REPAIRS, F#305

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of The Navy → Navfac Far EastView Agency

NAICS

N/A

Place of Performance

USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Navy → Navfac Far East
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of The Navy → Navfac Far East
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Project will replace roof panels including 12-each skylights approx. 7,654-sf, rain gutter system, roof purlins, 680-lf, 8-each roof ventilators, 4-each wall louvers, 2,680-sf wall panels, 40-each interior fluorescent lights & 3-each exterior lightings and 2-each motor roll up door assemblies. Additional scope of work were based on ICAP inspection and Builder Generated deficiencies of the facility. Project will perform the following: 1]. Replace roof edge and corner flashings and trims, cee framings of roll-up doors, plexi-glass windows with trims, aluminum and wooden door assemblies and hardware, ceramic wall and floor tiles, vinyl floor tiles and cove base, acoustical ceiling system, install roof anchorage, sandblasting and painting works, 2] Install new cross main and branch line piping's complete with fittings, pipe support/hanger, brackets and all required accessories for approx. 5,994-sf building, 3] Install new sprinkler system riser assembly including valves, fittings, and all required accessories, 4]. Replace men /women toilet with wall mounted flush valve water closet (1-ea), wall mounted urinal (1-ea), lavatory (1-ea) including all supported accessories, 5] Replace plumbing pipes approximately 35-lf of 1-1/2" inch, 80-lf of 3/4-inch pipe including all accessories, 6] Shut-off valve/ cut/ remove 1-ea backflow preventer 3/4" dia. located exterior side of the building, 7] Replace 2-each 7.5-tons (PACU-1) and 10-tons (PACU-2) including all supported accessories and 8] Provide 1-ea back up mobile Air Conditioning and power supply for the temporary AC Unit.