Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Sources Sought opportunity from California was posted on May 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Permanent Modular Building Design-Build

Closed
26-54State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
BEQ- Sanitize & Paint Rooms, B4167, Multi Rooms, MASS1, Station
Solicitation # N400857607511
Solicitation N400857607511 is a task order under MACC contract N4008525D for the remediation, preparation, and painting of 22 barracks rooms and associated bathrooms at MCAS Cherry Point, North Carolina. The contractor is responsible for providing all labor, supplies, and equipment to eradicate active microbial growth using EPA-registered disinfectants and antimicrobial solutions. The scope of work includes preparing approximately 18,562 square feet of barracks room surfaces and 3,840 square feet of bathroom surfaces by removing failed paint and applying a heavy-duty, mold-and-mildew-resistant sealing primer. Final finishing requires a minimum of two coats of specialized mold/mildew-resistant paint that matches the existing color and sheen, ensuring a uniform finish without visible patching or roller marks. The project is estimated between 25,000 and 100,000 dollars, with the award based on the lowest price. All work must be completed within 60 calendar days of the award. Proposals were due by September 16, 2026, and must include a completed price proposal form and a list of subcontractors. Bonding requirements vary by proposal value, with payment bonds required for projects between 35,000 and 150,000 dollars. The contractor must comply with the Buy American Act, the Davis-Bacon Act, and FAR 28.307-2 liability insurance requirements. A qualified Quality Control Manager is required to oversee project standards, and all site cleanup must be completed to return the area to its original condition prior to final acceptance by the Contracting Officer's Representative.
Bristol Alliance of Companies

POSTED

about 9 hours ago

DEADLINE

in 4 days
NAICS: 236220
New
SLED
DB Construction for HC-130J Flight Simulator Facility at USCG Elizabeth City, NC
Solicitation # 32000479
This design-build project involves the construction of a full motion Weapons System Trainer flight simulator facility for C-130J aircraft at USCG Base Elizabeth City, North Carolina. The approximately 13,000 gross square foot facility will include a simulator bay for a Government Furnish, Government Installed mobile simulator, classrooms, administrative offices, debriefing spaces, and essential support areas for mechanical, electrical, and telecommunications systems. The scope of work extends to site development, including the installation of sidewalks and landscaping, while utilizing existing parking areas. A critical technical requirement is the integration of a Siemens Building Automation System to ensure compatibility with existing installation-wide systems. Issued under the DHS National Multiple Award Construction Contract III, Pool Two, the project has a magnitude estimate of approximately 16 million dollars and a performance period of 719 calendar days. The award is based on a best-value tradeoff selection, weighing price against non-price factors such as planning, organization, communication, and the contractor's specific experience with military or commercial flight simulators. Strict security and compliance protocols are in place, requiring all on-site personnel to be US citizens and necessitating adherence to Davis-Bacon wage determinations, Buy American requirements, and various environmental and historic preservation consultations.
Bristol Alliance of Companies

POSTED

about 9 hours ago

DEADLINE

in 12 days
NAICS: 236220
New
SLED
Upgrade Life Health Safety Systems in Hangar 250
Solicitation # N400857190530
Solicitation N400857190530 involves upgrading the life health safety systems within Hangar 250 at MCAS Cherry Point, North Carolina. The scope of work includes architectural improvements, modifications to fire alarm and fire protection systems, and the rerouting of plumbing and electrical systems. Because the work will be performed in an occupied facility, the contractor must coordinate closely with base operations and adhere to strict safety and security requirements. The project is estimated to be valued between 1,000,000 and 5,000,000 dollars, with a required completion timeframe of 380 calendar days after the award. The contract will be awarded based on the lowest price, and proposals are due by September 21, 2026. Key requirements include compliance with the Buy American Act, the Davis-Bacon Act, and specific bonding requirements for proposals exceeding 150,000 dollars, which include bid, payment, and performance bonds. Deliverables consist of a facility operating plan, comprehensive data packages for system maintenance, and functional performance test reports. Invoicing is managed through the Wide Area WorkFlow system, and the contractor must submit a detailed schedule of prices within 15 calendar days of the award. Quality control is paramount, requiring the submission and acceptance of a Contractor QC Plan before construction begins.
Bristol Alliance of Companies

POSTED

about 9 hours ago

DEADLINE

in 6 days
NAICS: 236220
New
NJCC Bathroom Renovations for Buildings 17 & 18
Solicitation # njcc-bathroom-renovations-buildings-17-18
Education & Training Resources is soliciting bids for a fee-for-service subcontract to perform comprehensive bathroom renovations at the Northlands Job Corps Center in Vergennes, Vermont. The project encompasses the renovation of four bathroom areas in Building 17, totaling approximately 944 square feet, and five bathroom areas in Building 18, totaling approximately 1,260 square feet. The scope of work includes the demolition of existing fixtures and the installation of institutional-grade acrylic shower pans, vitreous China toilets, high-pressure laminate countertops, non-slip porcelain flooring, and LED vanity lighting. To maintain center operations, contractors must utilize a phased sequencing approach, renovating one dormitory at a time. All work must comply with ADA, OSHA, and National Electrical Code standards, and contractors are responsible for the daily off-site disposal of all debris. Bidders may submit a unified proposal for both buildings or standalone bids for each. Proposals must include a completed bid sheet with an itemized cost breakdown separating labor and materials, a detailed project schedule specifying calendar days and working hours, and proof of current Vermont state professional licensing and insurance. The award will not be based solely on the lowest bid, as ETR will evaluate technical alignment with the scope of work to minimize future change orders. Winning bidders must maintain active registration in SAM.gov and provide a Unique Entity ID. The contract incorporates various FAR clauses, including requirements for the Davis-Bacon Act, anti-lobbying certifications, and combating trafficking in persons. Payment terms are net 30 days, contingent upon the submission of a signed punch list and applicable warranties.
Northlands Job Corps Center /ETR

POSTED

about 9 hours ago

DEADLINE

in 1 day

AI Contract Overview

Show more

The Fresno Unified School District has issued a Request for Information (RFI) under solicitation number 26-54 titled Permanent Modular Building Design-Build, aimed at gathering insights from modular building manufacturers to inform future facility planning. This RFI is not a procurement opportunity and does not constitute a commitment to purchase, lease, or award a contract; responses are solely for informational purposes and cannot result in charges to the district. Bidders are reminded that no work may be performed at the district’s expense, and submissions will not be evaluated, ranked, or used to pre-qualify companies for future bids. The RFI was made available on May 28, 2026, with a clarification deadline of June 5, 2026, and responses are due by June 12, 2026. The procurement process is unsealed, and access to bid documents and related communications requires registration and login through the district’s online portal. The agency, operating under the state of California, is seeking input to support long-term infrastructure improvements but is not initiating an active bidding cycle at this time.

General Info

Fresno Unified seeks modular building input via RFI; no procurement, commitment, or payment involved.

Agency

California → Fresno Unified School DistrictView Agency

NAICS

236220 - Commercial and Institutional Building ConstructionView NAICS

Place of Performance

CA, USA

Set-Aside

NONE

Documents

(1)

Bid No. 26-54 RFI Notification List for Permanent Modular Building Design-Build

PDFrfi-notification-list

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Fresno Unified School District
ContactsNo contacts available
OfficeCA, USA
Organization / Agency
California → Fresno Unified School District
View Agency Profile
Office AddressCA, USA
ContactsNo contact information available

Full Description

Show more
Return to Bid List Bid NUMBER 26-54 TITLE Permanent Modular Building Design-Build PROCESS Unsealed BASE CURRENCY USD STATUS Closed to Bidding DESCRIPTION BID DOCUMENTS BIDDERS CALENDAR
You must log in to register for Bid Events and to view Bid Question and Response information.
NUMBER 26-54 TITLE Permanent Modular Building Design-Build AVAILABLE DATE 5/28/2026 2:00 PM CLARIFICATION DEADLINE 6/5/2026 5:00 PM DUE DATE 6/12/2026 5:00 PM CONTACT INFORMATION BID TYPE RFI (Request For Information) DESCRIPTION
The purpose of this Request for Information (RFI) is to solicit information from Modular Building manufacturing companies to assist the District in planning of future facility improvements.
This RFI is not a formal or informal procurement opportunity, and responses will be utilized strictly for the purposes of information gathering. No cost can be charged to the District. This document shall not be construed as a request or authorization to perform work at the District’s expense. This RFI does not represent a commitment to purchase or lease. Responses will not be scored, ranked, or used to pre-qualify firms for future procurements

More opportunities from California → Fresno Unified School District

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS