This Solicitation opportunity from Department Of Defense was posted on May 5, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Peterson SFB Cooling Towers Repair
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves the repair of two cooling towers at Building 1470 on Peterson Space Force Base in Colorado Springs, Colorado, with a performance period of 90 calendar days from May 1, 2026, to July 31, 2026. The scope of work includes replacing cooling tower media, nozzles, and sealing joints, cleaning basins, and installing new 3 HP 480 Volt 3-phase motors, with contractors required to verify motor specifications prior to order. All work must comply with Unified Facilities Criteria, manufacturer recommendations, Green Procurement mandates, OSHA regulations, and Air Force safety standards, and must be performed without disrupting base operations. Proposals must be submitted electronically via SAM.gov by 12:00 PM MST on May 8, 2026, following a three-volume structure: a cover letter with UEI and CAGE codes, a price proposal aligned with CLIN 0001, and a technical proposal limited to five pages that addresses salient characteristics and delivery lead time as pass/fail criteria. The solicitation is a total small business set-aside under NAICS code 238220, evaluated under the Lowest Price Technically Acceptable (LPTA) method, where only technically acceptable offers are considered for award based on price. Past performance is reviewed only for the lowest-priced technically acceptable offeror, with neutral ratings treated as acceptable. Contractors must comply with stringent security protocols including Personal Identity Verification, site access requests submitted 15 business days in advance, antiterrorism training, cybersecurity safeguards under DFARS 252.204-7012, prohibitions on procurement from Xinjiang and the Maduro regime, and compliance with System for Award Management registration and maintenance. Work must adhere to strict operational hours, requires advance authorization for hot work and utility outages, and mandates prompt reporting of hazardous materials. Final acceptance requires a joint inspection by the 21st Civil Engineer Squadron, with all non-conforming work corrected at the contractor’s expense. Invoicing must be submitted electronically through Wide Area WorkFlow, and payment is processed through the 21 CES CEX office using DoDAAC F3L3DA.
General Info
Agency
NAICS
Place of Performance
Colorado Springs, CO, 80914, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
Peterson SFB Cooling Towers Repair
Amendment 1:
Amendment made to correct an admin error in the Evaluation Factors attachment.
Original:
Subfactor 1.1 mentioned a "Mobile Surveillance System" by mistake.
Edit:
Removed "Mobile Surveillance System" to avoid confusion on what requirement this is.
Amendment 2:
Amendment 2 made to address Requests For Information (RFI) questions received. Answers to RFIs provided and requested pictures of the work site provided. Additionally, Statement of Work (SOW) para 1.5.1 updated to include the replacement of cooling tower media, nozzles, sealing of joints and cleaning of basins.
Use "Statement of Work (Current as of Amendment 002)" for creating your RFQ response.
Solicitation will be extended to accommodate SOW Scope update. New Date Offers Due Date/Time is: Tuesday 28 April 2026 at 12:00 PM MST.
AMENDMENT 003:
Amendment 003 made to address Statement of Work (SOW) Scope Increase and to extend the solicitation to allow time for offerors to address this Amendment in their offers.
Solicitation Date Offers Due Date/Time extended to now close Friday 8 May at 12 PM MST.
New Requests for Information are due No Later Than Wednesday 6 May at 12 PM MST.
SOW Scope now includes the following addition:
Paragraph 1.5.4. Contractor shall replace motors on each cooling tower. Our records show a 3 HP 480 Volts 3 PH motor. Contractor shall verify specification of motor prior to ordering.
More opportunities from Department Of Defense → FA2517 21 Cons Bldg 350
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS
