Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Government of Canada was posted on May 8, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Phase 1 – EW038-261620 - Sanitary and Storm Sewer Restoration - ITQ

Closed
WS5634791774International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
SLED
Emerson St. Sinkhole RepairThe contract pertains to the repair of a stormwater drainage issue along Emerson Street involving the replacement of a disconnected section of pipe that formerly linked to the main King County stormwater line beneath the roadway. Work includes excavation to access the damaged segment, removal of the old infrastructure, installation of a new pipe section, and the creation of a secure connection to the main line. Additional tasks involve backfilling the trench and repaving the affected asphalt surface to restore the street to its original condition. Given the location on a busy arterial road, the project necessitates extensive traffic management measures, including lane closures and controls, to maintain public safety and minimize disruption during construction. The contracting entity is the Port of Seattle, specifically through its Waterfront Project Management division, with the work classified under NAICS code 237110 for sewer and water infrastructure. The solicitation was posted in July 2026 and is currently in forecast status, indicating it is an upcoming opportunity for contractors to prepare bids. Primary contact for inquiries is Marilynn Montenegro, with Brandon Klett serving as the project manager. The exact location of the work is on Emerson Street, though specific city and state details are not provided in the data. All communication and formal inquiries should be directed through the provided contact details for the Port of Seattle.
Waterfront Project Management

POSTED

about 7 hours ago

DEADLINE

N/A
NAICS: 237110
New
SLED
1947 Watermain - North Bound Airport Expressway PreservationThe Port of Seattle’s Aviation Project Management Group is preparing to restore the integrity of a 1947 water main located along the northbound Airport Expressway using cured-in-place pipe (CIPP) technology under a Design-Bid-Build procurement model. This project aims to rehabilitate the aging infrastructure without full excavation, leveraging CIPP to create a durable, seamless liner within the existing pipe, thereby extending its service life and maintaining water system reliability. The work is classified under NAICS code 237110, indicating it falls under utility system construction, and will be executed to meet current engineering and safety standards for municipal water infrastructure. Moraa Omwega serves as the primary point of contact for the solicitation, with Ray Moreno listed as the Project Manager, both reachable through the Port of Seattle’s official channels. The anticipated timeline for the bid process begins with a posting date of July 26, 2026, suggesting that the formal solicitation and bid submission phases are expected to commence in late 2026. The project will be performed at the specified location along the Airport Expressway, though exact geographic details such as city, state, or zip code are not provided in the available data. Interested parties are encouraged to monitor the designated UI link for official documentation, schedule updates, and compliance requirements as they become available.
Aviation Project Management Group

POSTED

about 7 hours ago

DEADLINE

N/A
NAICS: 237110
New
International
Greater Mandeville Water Supply Improvement Project- Pepper/Goshen Distribution Network- Old Pepper Well to Old Pepper Main Road, Manchester/St. ElizabethThe National Water Commission of Jamaica is soliciting bids for the supply and delivery of 1 kilometer of 250mm nominal diameter ductile iron pipes along with all necessary associated fittings for the Greater Mandeville Water Supply Improvement Project. The work is focused on the Pepper/Goshen Distribution Network, specifically extending from the Old Pepper Well to the Old Pepper Main Road in Manchester and St. Elizabeth. Bidders must ensure compliance with all technical and quality specifications for the pipes and fittings, as the project aims to enhance water infrastructure reliability in the region. The solicitation is open to qualified suppliers and contractors who can meet the required delivery and installation standards. The solicitation, identified by number 1618/1423, was posted on July 24, 2026, and responses must be submitted no later than August 19, 2026, at 4:00 PM. The contract does not specify a set-aside designation and is classified under the government of Jamaica’s broader water infrastructure program. All correspondence and submissions should be directed through the official ePPS portal, with no physical office address or point of contact listed. The place of performance is confined to the designated路段 in Manchester and St. Elizabeth, and bidders are expected to account for logistics, handling, and timely delivery to meet project timelines and operational requirements.
National Water Commission

POSTED

2 days ago

DEADLINE

in 24 days

AI Contract Overview

Show more

This contract pertains to Phase One of a two-phase procurement process for sanitary and storm sewer restoration work at the National Forestry Centre in Edmonton, administered by the Government of Canada through the Department of Public Works and Government Services. The solicitation number is WS5634791774, with a strict deadline of May 8, 2026, at 2:00 PM Eastern Time, and no late submissions will be accepted. Interested suppliers must submit their qualifications for evaluation; only those successfully qualified will proceed to Phase Two, where they will be invited to submit a financial bid based on detailed specifications and drawings. The scope of work includes installing new sanitary sewer lines below an existing concrete floor, erecting a storm drainage system, rehabilitating pavement in disturbed areas, mobilizing and demobilizing all personnel and equipment, and conducting a full site cleanup upon completion. Contractors are required to verify the invert depth of existing sanitary sewers at critical points prior to any modifications, ensuring alignment with as-built drawings that indicate the sewer invert must lie above the bottom of the grade beams. The entire project must be completed within thirty-two weeks from the date of notification of acceptance of the offer.

General Info

Two-phase procurement for sewer restoration at National Forestry Centre, completion in 32 weeks.

Agency

Government of Canada → Department of Public Works and Government ServicesView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

*Edmonton, CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Department of Public Works and Government Services
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → Department of Public Works and Government Services
View Agency Profile
Office AddressN/A
Contacts
Singh Vinay (SPAC/PSPCPoint of Contact

Full Description

Show more
Please note that late submissions will not be considered or accepted. This is the first phase (Phase One) of a two-phase process: the first phase will evaluate the qualifications of all interested suppliers; the second phase (Phase Two) will invite the qualified suppliers to provide a financial bid on the project based on the specifications and drawings. Work of this Contract is comprised of the interior sanitary and exterior storm sewer repairs located at the National Forestry Centre (NR Can). This work includes, but is not limited to the following: 1. Installation of Sanitary Sewer below existing concrete floor, 2. Installation of Storm System, 3. Pavement Rehabilitation of disturbed areas, 4. Mobilization and demobilization of all personnel, equipment, support facilities and materials required to complete the Work, 5.Site cleanup once all the work has been completed. EXISTING SANITARY INVERT CONNECTION DEPTH: The contractor shall confirm the depth of the existing sanitary sewers at key locations before any sanitary sewers are disconnected or new pipe is installed. Based on the as-built drawings the depth of the existing sanitary sewer, below the floor of the maintenance corridor, should be such that the invert of the pipe is above the bottom of the grade beams.The Contractor must perform and complete the Work within Thirty-Two (32) weeks from the date of notification of acceptance of the offer.

More opportunities from Government of Canada → Department of Public Works and Government Services

Same awarding agency