Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Pico Boulevard Safety and Mobility Plan Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Pico Boulevard Safety and Mobility Plan Project, managed by the City of Los Angeles Department of Transportation, involves implementing street safety and infrastructure improvements along a 3.5-mile segment of Pico Boulevard between Crenshaw Boulevard and Figueroa Street. The primary objective is to establish Class IV protected bicycle lanes to close a critical gap in the active transportation network, connecting existing bike lanes on Figueroa Street to those on Venice Boulevard via 4th Avenue. This initiative aligns with the Mobility Plan 2035 Bicycle Lane Network and Measure HLA requirements to enhance multimodal connectivity and safety within Council Districts 1, 9, and 10. The scope of work includes reconfiguring the roadway from two lanes in each direction to one lane in each direction with center left turn lanes, which necessitates the removal of some on-street parking, primarily in the westbound direction. Additional infrastructure upgrades consist of installing Toucan traffic signals at Manhattan Place and New Hampshire Avenue, as well as performing sidewalk repairs, curb ramp upgrades, roadway striping, and other minor ancillary repairs. The project is categorized as exempt under the California Environmental Quality Act (CEQA) as it involves minor alterations to existing streets. Administrative oversight is provided by Supervising Transportation Planner Severin Martinez.

General Info

Los Angeles installs protected bike lanes, sidewalks, and signals on Pico Boulevard to enhance safe, equitable active transportation.

Agency

California → City of Los Angeles

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Pico Boulevard between Crenshaw Boulevard and Figueroa Street, Los Angeles, CA

Set-Aside

NONE

Documents

(1)

Pico Boulevard Safety and Mobility Plan Project CEQA Notice of Exemption

PDFceqa-notice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Los Angeles
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Los Angeles
Office AddressN/A
Contacts
Severin MartinezSupervising Transportation Planner

Full Description

Show more
The proposed project primarily consists of implementing protected bike lanes along an approximately 3.5 mile segment of Pico Boulevard between Crenshaw Boulevard and Figueroa Street, including the reallocation of travel lanes and removal of some on-street parking to create the necessary space for the bicycle facility. The project would enhance safety, accessibility, and multimodal connectivity along the corridor, which serves as a key commercial, cultural, and transportation route for the community. It would close a critical gap in the active transportation network by connecting existing bike lanes on Figueroa Street to existing bike lanes on Venice Boulevard via existing bike lanes on 4th Avenue. The project also includes some sidewalk repair, curb ramp upgrades, roadway striping, and signal modifications throughout the corridor limits, and the addition of Toucan traffic signals at Pico/Manhattan and Pico/New Hampshire.

Similar Contracts

Same NAICS industry code

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS