Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from General Services Administration was posted on October 7, 2015. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Peigan Infrastructure & Housing Project

Closed
GS00P15LYC0020Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with an estimated value of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The contractor is responsible for delivering a fully operational facility, including the installation of pumps, a generator, odor control equipment, new gravity sewers, and manholes, while managing by-pass pumping, testing, and commissioning. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on MWBE compliance through the submission of Good Faith Efforts and Table A documentation. Bids are due by November 12, 2026, and must be submitted using the EJCDC C-410 Bid Form. The project is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds and proof of insurance. Technical standards include AWWA Specification C-600 for pipelines, NEMA MG1 for motors, and AWS D1.2 for aluminum welding. Project administration is managed by the City of Belmont with Willis Engineers serving as the project engineer. Payment is processed via Applications for Payment, with terms set at 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 16 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

This contract involves design-build construction services for upgrading and expanding critical infrastructure systems, including sewage treatment, water delivery and treatment, natural gas distribution, and electrical distribution, at the Piegan Land Port of Entry near Babb, Montana. These systems currently serve the Land Port of Entry and existing Customs and Border Protection housing, but are operating at or beyond capacity. The project will increase system capacity or replace them entirely to meet the combined demand of the existing facilities plus up to four additional housing units. The new housing units, if constructed, must follow the Northern Border Model CBP Prototype House design by Garrison Architects. The estimated contract value ranges from $10 million to $20 million. The procurement is open to all qualified firms, including various categories of small businesses and veteran-owned entities, with no set-aside restrictions. Firms that are not small businesses but wish to subcontract must provide an approved Small Business Subcontracting Plan. The contract will be awarded as a firm-fixed price to the offeror that provides the best value based on both price and non-price technical factors, with those technical factors carrying greater weight. Mandatory security clearance from the Department of Homeland Security will be required for all personnel prior to starting work. Key dates include solicitation issuance on August 12, 2015, industry days and site visits in mid-September, and proposal submissions due by October 19, 2015. All firms must be registered in the System for Award Management and complete the required representations and certifications to be eligible for award.

General Info

Design-build contract upgrading Piegan Land Port infrastructure, $10-20M, requires DHS clearance, best value award.

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

Piegan Land Port of Entry 5023 Highway 89 North (located 10 miles north of Babb, Montana on US Route 89), BABB, MT, 59411, USA

Set-Aside

NONE

Documents

46

C301_APR_15 - Offeror Representations and Certifications

DOC, High priority: read this first5 pages · rfp
High

General Decision MT150078 - Heavy Construction (Montana)

TXT, High priority: read this first5 pages · wage-determination
High

General Decision Number MT150035 - Montana Building Construction

TXT, High priority: read this first4 pages · wage-determination
High

GS-00P-15-LY-C-0020 Amendment 03

PDF, High priority: read this first2 pages · amendment
High

GS-00P-15-LY-C-0020 Piegan Infrastructure Q&A

PDF, High priority: read this first23 pages · q-and-a
High

GS-00P-15-LY-C-0020: Piegan Land Port of Entry Infrastructure

DOC, High priority: read this first1 page · rfp
High

GS-00P-15-LY-C-0020 Piegan New Infrastructure and Houses SOW

DOC, High priority: read this first17 pages · sow
High

GS-00P-15-LY-C-0020 Piegan New Infrastructure Project SOW

DOC, High priority: read this first17 pages · sow
High

Piegan Infrastructure and Housing Design Build Agreement

DOCX, High priority: read this first36 pages · contract-document
High

Piegan Infrastructure and Housing Design Build Agreement

DOCX, High priority: read this first36 pages · contract-document
High

Piegan Infrastructure and Housing Design Build Solicitation

DOCX, High priority: read this first28 pages · rfp
High

Piegan Infrastructure and Housing Design Build Solicitation

DOCX, High priority: read this first28 pages · rfp
High

SF1442 Solicitation, Offer, and Award

PDF, High priority: read this first2 pages · ifb
High

SF 30 Amendment 01 - Piegan

PDF, High priority: read this first2 pages · amendment
High

SF_30_Amendment_02_Piegan

PDF, High priority: read this first2 pages · amendment
High

PBS Past Performance Questionnaire

DOCX, Low priority5 pages · past-performance
Low

040_-_DBBD.zip

X-ZIP-COMPRESSED

050_-_Prototype_House_-_Bound_DWG_Sheets.zip

X-ZIP-COMPRESSED

050_-_Prototype_House_-_Final_Specs.zip

X-ZIP-COMPRESSED

050_-_Prototype_House_-_Mods_to_Proto_Design.zip

X-ZIP-COMPRESSED

050_-_Prototype_House_-_PDF_Sheets_-_Northern_Border_Arch_PDFs.zip

X-ZIP-COMPRESSED

050_-_Prototype_House_-_PDF_Sheets_-_Plumbing_Mech_Elec_Sprinkler_PDFs.zip

X-ZIP-COMPRESSED

050_-_Prototype_House_-_PDF_Sheets_-_Sitework_PDFs.zip

X-ZIP-COMPRESSED

050_-_Prototype_House_-_PDF_Sheets_-_Structural_PDFs.zip

X-ZIP-COMPRESSED

050_-_Prototype_House_-_Perspective_Images.zip

X-ZIP-COMPRESSED

060_-_Feasibility_Study.zip

X-ZIP-COMPRESSED

070_-_Hydro_Reports.zip

X-ZIP-COMPRESSED

080_-_Utility_Easements.zip

X-ZIP-COMPRESSED

090_-_Previous_Projects_-_010_-_2003_Housing_PH_II_-_1_of_2.zip

X-ZIP-COMPRESSED

090_-_Previous_Projects_-_010_-_2003_Housing_PH_II_-_2_of_2.zip

X-ZIP-COMPRESSED

090_-_Previous_Projects_-_020_-_New_LPOE_-_1_of_2.zip

X-ZIP-COMPRESSED

090_-_Previous_Projects_-_020_-_New_LPOE_-_2_of_2.zip

X-ZIP-COMPRESSED

090_-_Previous_Projects_-_030_-_BP_Station_Addition.zip

X-ZIP-COMPRESSED

090_-_Previous_Projects_-_040_-_Old_LPOE_-_1_of_4.zip

X-ZIP-COMPRESSED

090_-_Previous_Projects_-_040_-_Old_LPOE_-_2_of_4.zip

X-ZIP-COMPRESSED

090_-_Previous_Projects_-_040_-_Old_LPOE_-_3_of_4.zip

X-ZIP-COMPRESSED

090_-_Previous_Projects_-_040_-_Old_LPOE_-_4_of_4.zip

X-ZIP-COMPRESSED

090_-_Previous_Projects_-_050_-_Tanks_and_Pipe_Replacement.zip

X-ZIP-COMPRESSED

090_-_Previous_Projects_-_060_-_60-Series_Duplexes.zip

X-ZIP-COMPRESSED

090_-_Previous_Projects_-_070_-_Water_tanks_and_pipe_replacement.zip

X-ZIP-COMPRESSED

100_-_Surveys.zip

X-ZIP-COMPRESSED

110_-_Previous_Studies.zip

X-ZIP-COMPRESSED

120_-_EA_and_FONSI.zip

X-ZIP-COMPRESSED

130_-_USTs.zip

X-ZIP-COMPRESSED

140_-_Water_Rights.zip

X-ZIP-COMPRESSED

Piegan_Industry_Day_and_Pre-proposal_site_visit_sign_in_sheet.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

3 updates
PhaseClosed
Posted

Sources Sought

Type Changed

Sources Sought → Presolicitation

Type Changed

Presolicitation → Combined Synopsis

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed. The point of contact changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeneral Services Administration → Pbs R9 Reality Property Utilztn Disposal Division
Contacts2 people available
OfficeSAN FRANCISCO, CA, 94102, USA
Office AddressSAN FRANCISCO, CA, 94102, USA
Contacts
Mary E. PachecoContract Specialist
Robert L RoybalContracting Officer

Full Description

Show more
Amendment 03 is issued that changes the Contracting Officer designation to Robert L. Roybal, attachs the list of attendees at the Industry Day, Pre-proposal conference and site visit, attachs the SF30's for Amendments 01 and 02 and attachs the questions and responses that include the ELABS water sample results and the ELABS wastewater sample results. There is no change to the proposal due date - it remains at October 19, 2015 - offers to be delivered not later than 3:00 PM, MST.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS