Pier T Marine Terminal Redevelopment Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Port of Long Beach plans to comprehensively redevelop and expand the Pier T marine terminal between Berths T130 and T140 to enhance cargo-handling efficiency, support the transition to zero-emission equipment, and modernize infrastructure to accommodate future growth in container volume and larger vessels. The project will increase the terminal’s footprint from 382 acres to approximately 500 acres, incorporating adjacent areas including Pier T Echo, the Navy Mole, and sections north of the existing terminal on Pier S and Pier S West. Construction will occur over a 17-year period in multiple phases, with ongoing terminal operations maintained throughout. Upon full build-out, the terminal will feature a 250-acre container yard with 81 stacking crane blocks, four vessel berths covering nearly 60 acres, administration and maintenance facilities, a new truck gate complex, an on-dock railyard along the northern perimeter, and a separate storage and staging railyard on the Navy Mole. The upgraded facility will have an annual capacity of 3.3 million containers, or 6.1 million twenty-foot equivalent units, with the on-dock railyard designed to handle at least one-third of total throughput, significantly improving intermodal connectivity and reducing truck traffic. The terminal’s modernization will prioritize environmental sustainability through the adoption of zero-emission equipment and infrastructure upgrades that support long-term operational efficiency and regulatory compliance. The project’s expansion will enable the Port of Long Beach to meet evolving global shipping demands while enhancing safety and navigational access for large container vessels. The environmental and technical planning phases are underway, with the project listed under the California Environmental Quality Act and publicly accessible through the CEQA Net portal. Key personnel overseeing the project include Alyssa Rodriguez as Environmental Specialist, Tanya Jones as Senior Project Manager, and Robert Johnson as CEO of Total Terminals, who collectively manage environmental compliance, engineering design, and overall project execution. All project-related inquiries should be directed to the provided contact details, with official communications routed through the Port of Long Beach.

General Info

Port of Long Beach expands Pier T to 500 acres, adds zero-emission tech, on-dock rail, and boosts capacity to 3.3 million containers over 17 years.

Agency

California → Long Beach, Port of

Place of Performance

SR-47 and Pier T Avenue, Long Beach, CA, 90802

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Long Beach, Port of
Contacts3 people available
OfficeN/A
Organization / Agency
California → Long Beach, Port of
Office AddressN/A
Contacts
Alyssa RodriguezEnvironmental Specialist
Tanya JonesSenior Project Manager

Interested Companies (1)

AscentSacramento, California

Full Description

Show more
The proposed Project would redevelop and expand the existing Pier T marine terminal at Berths T130 through T140 to optimize efficient cargo-handling operations, transition to zero-emission equipment, and extend and modernize the existing wharf to accommodate future container volumes and safe navigation of large container vessels. The existing 382-acre terminal would expand to approximately 500 acres and would potentially include areas adjacent to the existing marine terminal on Pier T, Pier T Echo, and the Navy Mole, as well as areas north of the existing marine terminal on Pier S and Pier S West (north of Seaside Way and west of Pier S Ave). The proposed Project would be constructed in phases over an estimated period of 17 years. The Pier T marine terminal would continue to operate during construction activities. At full build-out, the Pier T marine terminal would include approximately 250 acres of container yard with 81-yard stacking crane blocks; four vessel berths occupying nearly 60 acres; administration, maintenance and repair buildings and other facilities; truck gate complex; on-dock railyard along the northern perimeter of the terminal; and a storage and staging railyard on the Navy Mole. The modernized terminal would be able to handle up to 3.3 million containers annually, or approximately 6.1 million twenty-foot equivalent units (TEUs). The expanded on-dock railyard would have the capacity to handle at least one-third of the terminal’s container throughput.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Contract FDC-214-102565.1, issued by the Commonwealth of Pennsylvania Department of Conservation and Natural Resources, involves the Phase 1 removal of a concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County. The scope of work includes the installation and removal of erosion and sediment control measures, implementation of a traffic control plan, stripping and stockpiling of topsoil, surface water control, and the excavation and placement of select fill. The project concludes with topsoil placement and seeding of all disturbed areas to restore the site to its original condition. The engineer's estimate for this project exceeds 1 million dollars. The contract mandates strict adherence to Small Diverse Business (SDB) and Veteran Business Enterprise (VBE) participation goals of 19 percent and 3 percent, respectively. Bidders must provide a lump sum bid and are required to secure performance and material and labor payment bonds at 100 percent of the contract amount, as well as a maintenance bond at 50 percent. Technical compliance is governed by the General Conditions for Construction 2022 Edition and various ASTM standards for soil compaction and classification. Payments will be processed via Automated Clearing House (ACH) through the Commonwealth's procurement system.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 10 hours ago

DEADLINE

in 16 days
View Details
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualification for a design-build project to construct eight new pickleball courts with lighting at Garden Grove Park. The scope of work encompasses all labor, materials, engineering, and construction services, including permitting, site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to the California Public Contract Code and Garden Grove Municipal Code. The estimated construction cost is between 1,000,000 and 1,200,000 dollars, with a guaranteed maximum price not to exceed 1,200,000 dollars. The procurement follows a two-step selection process. In the first step, the city will evaluate Statement of Qualifications based on experience, professional qualifications, technical capabilities, project team, safety record, financial capability, and demonstrated performance to shortlist the three highest-scoring firms. These firms will then advance to a second step to submit a proposal for a best-value award. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a certification form, a firm information form, and a surety declaration demonstrating the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 10 hours ago

DEADLINE

in 24 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS