SANDYLAND SHORELINE PROTECTION PROJECT

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Sandyland Shoreline Protection Project aims to restore the original 1983 design of a 3,700-foot rock revetment seawall situated between Sand Point Road and the coastline in Carpinteria, California. The work will involve placing up to 15,000 tons of new 3- to 5-ton armor rocks to reestablish the intended 16.4-foot crest elevation, a 2:1 seaward slope, and a 10-foot-wide crest, correcting areas where the structure has degraded, sunk, or lost width. Existing displaced stones will be salvaged and reused where feasible, while new material fills voids and re-establishes structural integrity. The project will include minor reshaping of the revetment to match the original specifications and reinforce its effectiveness as shoreline protection. In addition to the seawall repairs, the project will enhance coastal habitat by removing non-native vegetation from the landward splash wall and planting native dune species to improve ecological resilience. Small quantities of imported sand may be added in areas lacking sufficient soil cover to support vegetation establishment. Furthermore, of the 23 existing private access stairways along the seawall, 12 will be demolished and fully replaced with restored revetment sections, while the remaining 11 will be rebuilt to accommodate continued resident access while maintaining the integrity of the upgraded structure. The work is being managed by Santa Barbara County, with Morgan Jones serving as the primary point of contact for engineering and regulatory compliance.

General Info

Repair 3,700-foot seawall with 15,000 tons of rock, restore original design, replace 12 stairways, plant native vegetation.

Agency

California → Santa Barbara County

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Santa Claus Lane and Sandpoint Road, Carpinteria, CA, 93103

Set-Aside

NONE

Documents

(5)

Sandyland Shoreline Protection Project Draft EIR Notice of Availability

PDFnotice-of-availability

Sandyland Shoreline Protection Project Draft EIR Summary

PDFenvironmental-impact-report-summary

Sandyland Shoreline Protection Project Draft Environmental Impact Report June 2026

PDFenvironmental-impact-report

Sandyland Shoreline Protection Project Appendix A Public Scoping Summary

PDFpresolicitation

Sandyland Shoreline Protection Project Draft EIR NOC

PDFnotice-of-completion

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Santa Barbara County
Contacts1 person available
OfficeN/A
Organization / Agency
California → Santa Barbara County
Office AddressN/A
Contacts
Morgan JonesEngineering Environmental Regulatory Compliance Manager III

Full Description

Show more
The proposed Project would repair and restore the 1983 design of the existing 3,700-foot-long Sandyland Seawall (shoreline protection in the form of a rock revetment) located between Sand Point Road residences and the coastline. Specifically, the proposed Project would involve repairing the revetment by placing up to 15,000 tons of 3- to 5-ton armor rocks to achieve the 1983 design of the revetment with a 16.4-foot crest elevation (relative to NAVD88 vertical datum), a 2:1 (horizontal:vertical) seaward slope, and a crest width of 10 feet. The repair would involve minor re-working of the revetment, using new (imported) armor rocks to fill voids in the revetment, correct low points and reduced width in the revetment crest, and address areas where existing armor stone has been dislodged. Where possible, existing displaced armor rock would be salvaged and re-used. In addition, the proposed Project would provide dune vegetation enhancement along the landward splash wall. Existing non-native vegetation would be removed and native dune vegetation would be planted to create additional habitat area. Construction of the dune feature may require the import of a small amount of sand for dune vegetation establishment in locations where sand cover does not exist. Lastly, of the 23 existing private access stairways constructed along the revetment to serve residents of Sand Point Road, under the proposed Project, 12 private access stairways would be demolished, and the design rock revetment would be restored in their place. The remaining 11 existing access stairways would be rebuilt.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # haleiwa-small-boat-harbor-maintenance-dredging-revetted-mole-repair
Healy Tibbitts Builders, Inc. is seeking small business subcontractors and suppliers for the Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project in Oahu, Hawaii. The scope of work includes dredging within federal jurisdiction to a depth of -12 feet Mean Lower Low Water with a 1-foot overdepth, involving the removal and ocean disposal of gravel, sand, silt, and clay. Additionally, the project requires revetted mole repairs, which encompass clearing and grubbing, CRM wall repair, tree and vegetation removal, and the reworking or installation of stone to fill voids. The performance period is 200 calendar days from the notice to proceed. The solicitation is an invitation for bid under NAICS code 237990, with a response deadline of September 30, 2026. Bids must be submitted in sealed envelopes, as electronic submissions are not permitted. Evaluation is based on a pass/fail gate for compliance and completeness, with a bid guarantee required at 20 percent of the bid price or 3 million dollars, whichever is less. The contract emphasizes strict quality management, requiring the use of the USACE National Dredging Quality Management Program and a physical on-site presence for the Quality Control Manager. Payment will be processed through the USACE Finance Center, and the project must adhere to EM 385-1-1 safety requirements and specific environmental protections for the Hawaiian hoary bat pupping season.
Healy Tibbitts Builders, Inc.

POSTED

about 13 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 237990
New
SBWRP Reverse Osmosis System
Solicitation # K-26-2469-DBB-3
Garney Pacific, Inc. is acting as the general contractor for the SBWRP Reverse Osmosis System project in San Diego, California, for the City of San Diego. With an estimated bid value of 19.3 million dollars, the project scope involves designing the removal of existing trailer-mounted Electrodialysis Reversal, slab-mounted Membrane Filtration, and Reverse Osmosis units. These will be replaced with new slab-mounted Membrane Filtration and Reverse Osmosis units to create a demineralization facility at the South Bay Water Reclamation Plant aimed at reducing total dissolved solids in reclaimed water. The solicitation, identified by bid number K-26-2469-DBB-3 and NAICS code 237990, seeks quotes for various trades including HVAC, plumbing, electrical, concrete, pumping, crane services, aggregate, landscaping, painting, piping insulation, and demolition. The project emphasizes socioeconomic participation, specifically seeking SLBE and ELBE firms with DBE, MBE, WBE, or SBE certifications, and is open to various small business set-asides. All subcontractors are required to utilize union labor and must be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company, though Garney will reimburse the bond premium. Contracting will be based on Garney Standard PO and Subcontract Forms, and any exceptions must be submitted as redlines with the quote. Proposals are due by August 27, 2026, at 2:00 PM PT.
Garney Pacific, Inc.

POSTED

about 13 hours ago

DEADLINE

in 13 days
View Details