Pine Level Bridge Repair
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves the comprehensive replacement and repair of a timber bridge on NW Pine Level Street over Horse Creek, with DeSoto County providing all necessary lumber and hardware. The contractor is responsible for all labor, equipment, concrete, and rebar, including removing existing guardrails, deck boards, stringers, and associated components, then installing new guardrails, bump rails, deck boards, stringers, and interior braces in accordance with specified standards. Additionally, the contractor must remove and replace the eastern approach slab, ensuring proper connection to the existing roadway, and perform minor earthwork as needed. The project requires multiple inspections at key milestones, such as after component removal, stringer placement, and slab forming, with a completion deadline of 60 days from the notice to proceed. The project schedule is set with a bid release on July 19, 2024, bids due by August 15, 2024, BOCC approval by September 10, 2024, and the notice to proceed issued on October 1, 2024. Bidders must demonstrate experience with at least two similar timber structure projects and are encouraged to conduct independent site visits prior to bidding. The contract value is estimated between $200,000 and $500,000, with the work performed in Florida, and the project aims to ensure the bridge's structural integrity and safety through detailed scope of work, adherence to FDOT standards, and timely completion.
General Info
Agency
Place of Performance
FL, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Full Description
2.0 DESOTO COUNTY ROAD AND BRIDGE DEPARTMENT RESPONSIBILITIES: 2.1 Supply all bridge lumber and hardware required for the Scope of Work. 2.2 Deliver all materials to the bridge location. 2.3 Supply Maintenance of Traffic (MOT) include concrete barriers and Type 3 barricades at the work location and advanced detour signage for the closure of the bridge for the duration of the Contract. 2.4 Attend a Kick-Off Meeting include a site visit to review the Scope of Work. 2.5 Perform inspection of Contractors work. 2.6 Perform riprap sand-cement bag headwall repairs before or after construction.
3.0 CONTRACTOR RESPONSIBILITIES: 3.1 Remove guardrail on bridge deck, guardrail posts and blocking, bump rail, deck boards, stringers and associated blocking and hard ware and dispose of all items unless stated to be reused. 3.2 Replace guardrail posts and blocking include new bolts, nuts and washer or reuse of existing bolts, nuts, washers and guardrail reflectors. New or reused hardware shall be at the discretion of DeSoto County Road and Bridge. Guardrail posts are 6” x 8” x 6’ and shall be cut to size (approximately 4’ 3” by the Contractor). Guard rail post replacement shall only include guardrails connected to the bridge structures. Work on approach guardrails is not included except as needed to remove the existing guardrail to allow for the work. 3.3 Reinstall the existing guardrail. 3.4 Replace all 4”x 6” bump rails (3 wide per side) using new nails. 3.5 Replace all 4”x 6” deck board (453 +/- total) using new nails. 3.6 Replace all 4” x 18” x 18’ stringers (15 total wide and spliced as needed, 150+/- total). Blocking shall be installed between all stringers at the pile caps. Interior stringer connection at blocking shall be nailed using 12-inch nails. Exterior stringer connections shall be bolted. All nails shall be new. Bolts, washers and nuts may be new or reused at DeSoto County Road and Bridge discretion. 3.7 Replace interior bent ‘V’ braces (32 +/- total). Only braces between piles and stringers shall be replaced. For end bents, existing ‘V’ braces shall be reused and nailed to new stringers. 3.8 Removal and disposal of the existing approach slab on the eastern side of the bridge and the millings between the remaining portion of the eastern approach slab and the timber bridge deck to accommodate the approach slab replacement. The remaining portion of the approach slab is approximately 22-ft wide by 17-ft 4-in long. The millings area is approximately 22-ft wide by 8-ft 8-inch long. Minor earthwork and grading may be required to comply with the standards for replacement. 3.9 Replacement of the eastern approach slab. The new slab shall be 22-ft wide by 26’ long and shall connect the existing asphalt roadway and the timber bridge deck in the area currently occupied by the approach slab and milling area. The new approach slab shall comply with FDOT Standard Plan Index 400-091 (FY 2024/25) and the FDOT Standard Specifications for Road and Bridge Construction (FY 2024/25). All form materials, concrete, rebar and associated materials needed for the approach slab construction shall be supplied by the Contractor. 3.10 The Contractor shall be responsible for calling DeSoto County Road and Bridge for inspection at the following milestones: 3.10.1 Following removal of all required components. 3.10.2 Following placement of all stringers. 3.10.3 Following placement of all decking. 3.10.4 Following placement of bump rail. 3.10.5 Following placement of guard rail. 3.10.6 Following forming of the eastern approach slab and placement of steel and prior to concrete pour.
NOTE: The Contractor may divide the bridge into sections and call for multiple inspections.
4.0 TIME OF PERFORMANCE: From the date of the Notice to Proceed, the Contractor shall have SIXTY (60) calendar days to complete of the Scope of Work, including final inspection and correction of any deficiencies noted by the County.
5.0 ANTICIPATED SCHEDULE: Bid Release: July 19, 2024 Bids Due: August 15, 2024 BOCC Approval: September 10, 2024 Notice to Proceed: October 1, 2024
6.0 SITE VISIT: Please note that there will be no pre-bid meeting or formal site visit organized during the bid period. However, bidders are strongly encouraged to conduct an independent site visit to gain a comprehensive understanding of the project prior to bidding.
7.0 MINIMUM REQUIREMENTS: Bidders must provide evidence of similar work on at least two timber structures. Bidders shall include the project name, description of the project, project owner and client contact information.
8.0 PHOTOGRAPHS: Please refer to the photographs on the following pages.
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS