Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Award Notice opportunity from Department Of Health And Human Services was posted on October 27, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Pine Ridge Hospital Roof Replacement

Awarded
75H70127C00002Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center (FLETC) in Glynco, Georgia, is a total small business set-aside solicitation for a firm fixed price contract. The scope of work involves a comprehensive interior modernization, including the replacement of corridor and classroom flooring with LVP and carpet tiles, full restroom remodeling with new vanities and plumbing fixtures, and the installation of a low-profile raised flooring system with integrated electrical circuits for classrooms. Additionally, the project requires updating doors and life-safety components, repainting interior surfaces, installing new signage compliant with ADA and ABA standards, and upgrading HVAC systems by replacing variable air volume (VAV) systems using Automated Logic Corporation components. The period of performance is scheduled from January 11, 2027, to March 11, 2028, with a total delivery timeline of 425 calendar days after the Notice to Proceed. Proposals are due by December 2, 2026, and will be evaluated based on price, past performance, and corporate relevant experience, all of which are of equal importance. The contractor must provide performance and payment bonds equal to 100 percent of the contract price and adhere to strict security protocols, including background checks and non-disclosure agreements for personnel. All work must comply with the FLETC Hazardous Waste Management Plan and applicable Georgia wage determinations.
Bristol Alliance of Companies

POSTED

about 5 hours ago

DEADLINE

in 15 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 covers the repair and modernization of the Auto Maintenance Facility, Building 575, at MCB Camp Lejeune, North Carolina. The scope of work is comprehensive, involving selective demolition, building envelope and roofing repairs, interior reconfiguration, and the installation of new finishes. Technical upgrades include new HVAC systems, exhaust extraction, compressed air systems, a full NFPA-compliant fire suppression system, and updated electrical distribution, lighting, and building automation controls. Additionally, the project encompasses site improvements such as paving, drainage upgrades, and hazardous materials abatement. The project is estimated to cost between $10 million and $25 million with a performance period of 730 days, with the award based on the lowest price. Bidders must provide pricing for two primary exhibit line items: building renovation and the removal and replacement of paving. The contract requires strict adherence to various standards, including MIL-STD-101 for piping identification and ADA accessibility guidelines. Administrative requirements include the use of Wide Area WorkFlow for invoicing and the submission of monthly work-hour reports and certified payrolls. Bonding requirements vary by proposal value, with bid, payment, and performance bonds required for projects valued at $150,000 or more. Government acceptance is contingent upon a final inspection report submitted 14 days prior to testing, with electrical systems evaluated according to NETA ATS standards.
Bristol Alliance of Companies

POSTED

about 5 hours ago

DEADLINE

in 6 days
NAICS: 236220
New
SLED
Modify Transfer Facility NBK Bangor
Solicitation # N44255-25-R-1502
Solicitation N44255-25-R-1502 is a firm-fixed-price design-build contract for the renovation and modernization of Facility #6594 (Transfer Facility) at Naval Base Kitsap Bangor, Washington. With an estimated project magnitude between $10 million and $25 million, the scope includes demolition, the replacement of deteriorated components, and the construction of a 400 square foot addition for forklift battery charging. The project is structured in two critical phases to ensure the facility remains operational and mission-capable, requiring the contractor to manage multiple mobilization and demobilization cycles. Phase 1 encompasses all initial design for both phases and general renovation work, while Phase 2 focuses on the installation of new building equipment, including a prefabricated paint booth and the replacement of a 40-ton bridge crane. The contract requires strict adherence to NAVFAC, UFC, and IBC standards, as well as cybersecurity compliance under DFARS 252.204-7012 and CMMC Level 1. Key performance milestones include a base bid completion within 360 calendar days of award and an optional seismic upgrade completion within 1082 days. Award is based on price and MACC past performance, with invoicing processed through the Wide Area WorkFlow system. The contractor must provide a quality control system compliant with FAR 52.246-12 and employ an independent third-party Special Inspector of Record. Proposals must be submitted via the PIEE portal, with a final deadline of December 7, 2026.
Bristol Alliance of Companies

POSTED

about 5 hours ago

DEADLINE

in 17 days
NAICS: 236220
New
Roof Replacement Mandatory Site Visit: 12/03/2026 @ 11 AM
Solicitation # 26-144
This subcontracting opportunity, managed by Atterbury Job Corps Center and Adams & Associates Inc., is for the full replacement of the roof on Building #1963 LBJ Dorm in Edinburgh, Indiana. The project is necessitated by extensive storm and wind damage, including multiple leaks and a damaged roof ridge cap. The selected contractor must be licensed in the State of Indiana and adhere to EPA, OSHA, and national building codes, as well as the latest Davis Bacon Act wage rate decisions. Key deliverables include a sequenced construction schedule due within 10 days of the Notice to Proceed, a one-year workmanship guarantee, and a two-year manufacturer's product warranty. The award will be based on Best Value rather than lowest price, with evaluation criteria weighted toward price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must submit a single lump sum proposal with a detailed cost breakdown for labor, materials, and equipment, along with a timeline for substantial completion and a 90-day bid guarantee. A mandatory site visit is scheduled for December 3, 2026, at 11:00 AM; attendance is required for bid consideration. Insurance requirements include automobile liability coverage and workers' compensation, with Adams and Associates, Inc. named as an additional insured. Payment terms are Net 30.
Atterbury Job Corps – Adams & Associates

POSTED

about 5 hours ago

DEADLINE

in 26 days
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
The Career Systems Development Corporation is seeking proposals for the interior renovation and repair of the North Wing dormitory at the Springdale Job Corps Center in Troutdale, Oregon. The project focuses on restoring water-damaged interior spaces, including sixteen residential rooms, bathrooms, and common areas, as well as the restoration of walls and ceilings in mechanical rooms. The scope includes the installation of drywall, the temporary removal and re-installation of HVAC equipment, and the implementation of safety measures to protect occupied spaces from dust and debris. The contractor is responsible for providing all labor, materials, and supervision to return the affected areas to safe residential use, with a required minimum one-year workmanship warranty upon completion. Proposals must include detailed relevant experience, a comprehensive work plan covering project phasing and service interruptions, and itemized pricing by room and trade. The project is subject to the Davis Bacon Act, adhering to wage determination OR20260100. Award requirements include providing payment and performance bonds for the full project value, as well as general liability insurance of 1 million dollars per occurrence and 3 million dollars general aggregate, within ten days of the award. Additionally, a detailed project schedule and personnel resumes must be submitted within thirty days of the award.
Career Systems Development Corporation

POSTED

about 5 hours ago

DEADLINE

in 2 days
NAICS: 236220
New
SLED
Old Saybrook Public Works Garage Addition and Renovation
Solicitation # 39994
The Town of Old Saybrook is soliciting proposals for the Public Works Garage Addition and Renovation, a single-prime contract based on a stipulated sum. The project scope encompasses comprehensive site preparation, earthwork, field engineering, and landscaping, including the installation of temporary fencing and adherence to CTDOT 2024 standard specifications. The contractor is responsible for providing all labor, equipment, and materials, with a required substantial completion date of November 30, 2027. Key deliverables include site readiness, survey records, and material submittals, with a strong emphasis on strict packaging, labeling, and storage requirements for materials such as safety glazing and foam plastic. Proposals must be hand-delivered to the First Selectman’s Office by 3:00 P.M. on December 17, 2026, following a mandatory pre-bid meeting on December 1, 2026. Award evaluations will consider unit prices and bidder qualifications, including licensure, financial capability, and performance history. The contract requires 100 percent performance and payment bonds, compliance with the Connecticut Prevailing Wage Law, and adherence to the Immigration Reform and Control Act. Payment is processed via an Application for Payment reviewed by the Architect, who issues a Certificate for Payment to the Owner within ten days.
DAS Procurement

POSTED

about 5 hours ago

DEADLINE

in 30 days

AI Contract Overview

Show more

The Indian Health Service Division of Engineering Services has awarded the Pine Ridge Hospital Roof Replacement Project to TATCo RC JV, LLC. This firm-fixed-price contract, identified by award number 75H70127C00002, has a total value of $1,878,087.00. The project was set aside for Indian Small Business Economic Enterprises and was awarded on October 27, 2026. The scope of work involves the roof replacement at Pine Ridge Hospital in South Dakota. The period of performance is established as 180 calendar days following the Notice to Proceed. The contract was issued under solicitation number 75H70126R00034 and falls under NAICS code 236220.

General Info

TATCo RC JV will replace Pine Ridge Hospital roof for $1,878,087.00 within 180 days.

Contract Value

$1,878,087

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Pine Ridge, SD, USA

Set-Aside

ISBEE

Award Issued Date

Potential End Date

November 15, 2027

Documents

0

No documents available

This contract was awarded without public documents.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Building 262 Renovations FLETC GlyncoOpen now, due in 15 days
  • Repair Auto Maintenance Bldg 575Open now, due in 6 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseAwarded
Posted

Award Notice

Awarded

Contract was awarded

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Health And Human Services → Division Of Engineering Svcs - Seattle
Contacts2 people available
OfficeSEATTLE, WA, 98121, USA

Full Description

Show more

Award Notice


The Indian Health Service, Division of Engineering Services is pleased to announce of the Pine Ridge Hospital Roof Replacement Project award to TATCo RC JV, LLC (UEI: M7K3UGKLYLK6) in the total contract value: $1,878,087.00.


Award was made in accordance with the solicitation evaluation criteria.



Solicitation No.: 75H70126R00034


Project Name: Pine Ridge Hospital Roof Replacement Project


Contract Line Item Number:  0001


Contract Type: FFP


Period of Performance: 180 calendar days after Notice to Proceed


Award Details:


Contract Award Date:                                                                         October 27, 2026


Contract Award Number:                                                                   75H70127C00002


Contract Awardee Unique Entity ID:                                                  M7K3UGKLYLK6


Contract Awardee Name:                                                                  TATCo RC JV, LLC


 Contractor Awarded Address:                                                        15342 Caputa Loop Caputa, SD 57725


Base and All Options Value (Total Contract Value):                      $1,878,087.00

More opportunities from Department Of Health And Human Services → Division Of Engineering Svcs - Seattle

Same awarding agency

NAICS: 236220
Federal
Fort Yates Pharmacy USP Renovation
Solicitation # 75H70127R00001
The Fort Yates Pharmacy USP Renovation project is a construction effort for the Indian Health Service located at Fort Yates Hospital in Fort Yates, North Dakota. The project involves renovating inpatient and outpatient pharmacies to comply with USP 795, 797, and 800 compounding standards. The scope of work includes phased renovations, temporary pharmacy setup, equipment relocation, conversion of existing spaces, replacement of the outpatient pharmacy air handler, security installations, and a facility-wide building automation interface upgrade. The contractor is required to maintain pharmacy operations and coordinate shutdowns, with performance to be completed within 270 calendar days of the Notice to Proceed, starting only after the completion of the McLaughlin pharmacy project. The government anticipates releasing the solicitation in mid or late November 2026, with an estimated construction magnitude between 1,000,000 and 5,000,000 dollars. This will be a single Firm Fixed Price contract procured as a Request for Proposal using Lowest Price Technically Acceptable evaluation criteria. The project is 100 percent set aside for Indian Small Business Economic Enterprise under NAICS code 236220, requiring offerors to self-certify their status as an Indian Economic Enterprise per the Buy Indian Act. Mandatory registration in the System for Award Management is required for award consideration.
Commercial and Institutional Building Construction

POSTED

9 days ago

DEADLINE

in 6 days
View Details
NAICS: 237110
Federal
Kelly Pierson OSS
Solicitation # 75H70127Q00001
Solicitation 75H70127Q00001 is a request for quotations issued by the Indian Health Service for the installation of a replacement individual on-site septic system for Kelly Pierson in Shelton, Washington. This project is a total small business set-aside under NAICS 237110, with an estimated contract value between $25,000 and $100,000. The scope of work includes the decommissioning of the existing tank and the installation of a 1200-gallon concrete trash tank, a NuWater aerobic treatment unit, a pump tank, effluent transport piping, and a pressurized gravel trench drainfield. All work must be performed in accordance with Mason County Public Health and Human Services permit SWG2026-00113 and applicable OSHA trench safety regulations. The contract is a firm-fixed-price award based on price and compliance, requiring the contractor to be a Mason County certified septic installer. The period of performance is 45 calendar days from the notice to proceed, with work commencing within 10 calendar days of that notice. Key administrative requirements include adherence to Davis-Bacon Act prevailing wage rates, the provision of payment and performance bonds, and the electronic submission of payment requests via the Treasury Invoice Processing Platform. Final acceptance is contingent upon inspections by the Contracting Officer's Representative and the OSS Designer, specifically requiring notification 24 hours prior to final backfill.
Water and Sewer Line and Related Structures Construction

POSTED

20 days ago

DEADLINE

in 13 days
View Details

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS