Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Agriculture was posted on September 8, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Pineview Reservoir Recreation Complex Reconstruction - Uinta Wasatch, Cache National Forest, Weber Utah

Awarded
1282B125R0015Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
C26863031 CASWELL MEMORIAL STATE PARK - Campground and Day Use Improvements
Solicitation # C26863031
The California Department of Parks and Recreation is soliciting bids for contract C26863031 to upgrade the campground and day use areas at Caswell Memorial State Park in San Joaquin County. This lump sum project, with an engineer's estimate between 4.2 million and 5.8 million dollars, requires the contractor to provide all labor, materials, and equipment to perform work including asphalt demolition, clear and grub operations, and AC overlay. The project must be completed within 365 calendar days from the notice to proceed, with a maximum of 30 days allocated for punch list items and final completion. Eligible bidders must hold a Class A and/or B license and be registered with the Department of Industrial Relations per SB 854. Award is based on the low price method, though incentives are provided for Disabled Veteran Business Enterprise participation exceeding the mandatory 6 percent goal, subject to a 100,000 dollar cap. Certified small businesses may also receive a 5 percent preference. Bids must be submitted electronically in PDF format to the designated email address by the specified deadline. The contractor is responsible for adhering to local prevailing wage rates, ADA compliance, and strict material storage and labeling standards. Quality control will be managed through on-site inspections, required testing logs, and the use of approved mockups to establish aesthetic and workmanship standards.
California Department of Parks & Recreation

POSTED

about 3 hours ago

DEADLINE

in 27 days
NAICS: 237990
New
SLED
Seminole Boat Ramp
Solicitation # 26-0075-MA
The City of Clearwater is soliciting bids for the Seminole Boat Ramp Restoration project in Clearwater, Florida. The scope of work involves the comprehensive repair and reconstruction of eight launching ramps across four bays, designed to accommodate vessels exceeding 35 feet and weighing over 10 tons. Key project activities include the demolition of existing concrete structures, dredging and grading of native soils, placement of various gravel fills, and the installation of new concrete ramps using either a precast slab system or pour-in-place solution. Additionally, the contractor is responsible for the temporary relocation and re-anchoring of floating docks to ensure ADA-compliant travel, the installation of articulated concrete mattresses for scour protection, and the implementation of strict environmental controls, including turbidity curtains and stormwater pollution prevention plans. Bidders must be pre-qualified in Marine Construction for at least 750,000 dollars and provide a bid security deposit equal to 10 percent of their maximum bid price. The project must be completed within 180 calendar days from the Notice to Proceed, with a hard deadline for full public restoration by February 15, 2027. To minimize public disruption, the contract limits the simultaneous closure of all four ramps to a maximum of 45 calendar days. Performance will be verified through third-party topographic surveys, with acceptance based on post-grading soundings compared to the design template. Progress payments will be prorated monthly based on the physical percentage of project completion.
Public Works

POSTED

about 5 hours ago

DEADLINE

in 21 days

AI Contract Overview

Show more

Solicitation 1282B125R0015 is a Firm Fixed Price contract issued by the USDA Forest Service for the reconstruction of the Pineview Reservoir Recreation Complex within the Uinta-Wasatch-Cache National Forest in Weber County, Utah. With an anticipated magnitude exceeding 10 million dollars, the project is a total small business set-aside under NAICS code 237990. The scope of work is divided into multiple phases and areas, including the Port Ramp Day Use Area, Pineview Trailhead, and New Point. Key construction activities involve site demolition, grading, storm drainage improvements, and the installation of comfort stations, parking lots, roads, trails, pavilions, and various site amenities. All work must comply with USFS, Weber County, and Utah Department of Transportation standards, as well as Davis-Bacon Act wage determinations. The period of performance is scheduled from September 15, 2025, to September 15, 2026. Award is based on a tradeoff process evaluating past experience, key personnel, past performance, and price, with non-price factors carrying more weight than cost. Technical requirements mandate strict adherence to ASTM and OSHA standards, with on-site inspection and acceptance managed by the Contracting Officer Representative. Proposals must be submitted in separate technical and business volumes, with the technical volume limited to 20 pages. The project includes a base requirement and an option for the New Point area, supported by detailed engineering drawings and a comprehensive schedule of items for pricing.

General Info

Contract Value

$9,707,699.96

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

South Jordan, UT, 84095, USA

Set-Aside

SBA

Award Issued Date

Documents

28

Amendment 0001 to Solicitation 1282B125R0015 Pineview Reservoir Recreation Complex Reconstruction

PDF, High priority: read this firstamendment
High

Amendment 0002 to Solicitation 1282B125R0015 for Pineview Reservoir Recreation Complex Reconstruction

PDF, High priority: read this firstamendment
High

Amendment 0003 to Solicitation 1282B125R0015 for Pineview Reservoir Recreation Complex Reconstruction

PDF, High priority: read this firstamendment
High

Amendment 0004 to Solicitation 1282B125R0015 for Pineview Reservoir Recreation Complex Reconstruction

PDF, High priority: read this firstamendment
High

Attachment 7 - Drawing-Base Pineview Trailhead

PDF, High priority: read this firstspecifications
High

Attachment 7 - Drawing-Base Pineview Trailhead Survey Control Points

PDF, High priority: read this firstspecifications
High

Attachment 7 - Drawings - Base Pineview Trailhead

PDF, High priority: read this firstspecifications
High

Attachment 8 - Construction Drawings and Scope of Work for Option 1001 - New Point

PDF, High priority: read this firstspecifications
High

Attachment 8 - Drawings and Scope of Work for New Point Unita Project

PDF, High priority: read this firstsow
High

Davis-Bacon Act Wage Determination UT20250095 Weber County Utah

PDF, High priority: read this firstwage-determination
High

GAOA Pineview Reservoir Recreation Complex Reconstruction - Construction Drawings Part 1

PDF, High priority: read this firstsow
High

GAOA Pineview Reservoir Recreation Complex Reconstruction - Phase 2 Port Ramp Construction Drawings

PDF, High priority: read this firstspecifications
High

GAOA Pineview Reservoir Recreation Complex Reconstruction - Phase 2 Port Ramp Drawings

PDF, High priority: read this firstdrawings
High

GAOA Pineview Reservoir Recreation Complex Reconstruction Phase 2 Port Ramp - Engineering Drawings

PDF, High priority: read this firstspecifications
High

GAOA Pineview Reservoir Recreation Complex Reconstruction Schedule of Items

XLSX, High priority: read this firstschedule-of-items
High

GAOA Pineview Reservoir Recreation Complex Reconstruction Schedule of Items Revision 1 Amendment 0003

XLSX, High priority: read this firstschedule-of-items
High

GAOA Pineview Reservoir Recreation Complex Reconstruction Schedule of Items Revision 2 Amendment 0004

XLSX, High priority: read this firstschedule-of-items
High

GAOA Pineview Reservoir Recreation Complex Reconstruction SOW

PDF, High priority: read this firstsow
High

GAOA Pineview Reservoir Recreation Complex Reconstruction SOW Revision 1

PDF, High priority: read this firstsow
High

GAOA Pineview Reservoir Recreation Construction Phase 2 Trailhead Signage Details

PDF, High priority: read this firstspecifications
High

GAOA Pineview Trailhead Typical Pavement and Structure Drawings

PDF, High priority: read this firstspecifications
High

Pineview Reservoir Recreation Complex Reconstruction - Phase 2 New Point Drawings

PDF, High priority: read this firstdrawings
High

Solicitation 1282B125R0015 - Pineview Reservoir Recreation Complex Reconstruction RFP

PDF, High priority: read this firstrfp
High

SOW - Pineview Reservoir New Point Project Reconstruction

PDF, High priority: read this firstsow
High

SOW - Pineview Trailhead Project Reconstruction

PDF, High priority: read this firstsow
High

Attachment 4 - Drawings for Base New Entrance and Site - Part 1

PDF, Low prioritydrawings
Low

Pineview Reservoir Recreational Facilities Final Geotechnical Investigation Report July 2023

PDF, Low prioritygeotechnical-report
Low

Pine View Sign-In Sheet May 12, 2025

PDF, Low prioritysign-in-sheet
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

8 updates
PhaseAwarded
Posted

Solicitation

Notice updated

The notice title changed. The notice description changed. The point of contact changed.

Notice updated

The notice title changed. The notice description changed.

Notice updated

Response deadline changed from Jun 3, 2025 to Jun 10, 2025. The notice title changed. The notice description changed. The point of contact changed.

Notice updated

The notice title changed. The notice description changed. The point of contact changed.

Notice updated

Response deadline changed from Jun 10, 2025 to Jun 25, 2025. The notice title changed. The notice description changed. The point of contact changed.

Notice updated

The notice title changed. The notice description changed. The point of contact changed.

Notice updated

The notice title changed. The notice description changed. The point of contact changed.

Notice updated

The notice title changed. The notice description changed. The point of contact changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Csa Intermountain 8 Usda-Fs
Contacts2 people available
OfficeOgden, UT, 844012310, USA
Office AddressOgden, UT, 844012310, USA
Contacts

Full Description

Show more

SEE ATTACHMENTS/LINKS FOR REQUEST FOR PROPOSAL (RFP) AND ALL SUPPORTING ATTACHMENTS AND AMENDMENTS TO THE SOLCITATION


**ATTENTION AMENDMENT 0003 HAS BEEN PUBLISHED TO THE SOLICITATION, ALONG WITH ALL REVISION 1 TO ATTACHMENT 7 DRAWINGS - BASE PINEVIEW TRAILHEAD, PGS 1-10 AND ATTACHMENT 9 REVISION 1 TO SCHEDULE OF ITEMS**


**ATTENTION AMENDMENT 0002 HAS BEEN PUBLISHED TO THE SOLICITATION**


**ATTENTION AMENDMENT 0001 HAS BEEN PUBLISHED TO THE SOLICITATION**


Project Title: Pineview Reservoir Recreation Complex Reconstruction - Uinta Wasatch, Cache National Forest, Weber Utah


PSC Code: Z2PA - Repair or Alteration of Recreation Facilities (Non-Building)


NAICS Code: 237990- Other Heavy and Civil Engineering Construction


Size Standard for NAICS: $45M


Project Magnitude: More than $10M

More opportunities from Department Of Agriculture → Csa Intermountain 8 Usda-Fs

Same awarding agency

NAICS: 327390
New
Federal
Picnic Tables & Bear Lockers with Install
Solicitation # 1240LT27Q0017
Solicitation 1240LT27Q0017 is a combined synopsis and request for quotation issued by the USDA Forest Service for the Winiger Ridge Dispersed Campsite Renovations. The project requires the purchase and installation of new picnic tables and bear boxes at existing dispersed campsites 1 through 5, located along NFSR 359.1 and 359.1A within the Boulder Ranger District of the Arapaho and Roosevelt National Forest and Pawnee National Grassland. This is a total small business set-aside under NAICS code 327390, with an estimated project magnitude between 25,000 and 100,000 dollars. The contract will be awarded as a firm fixed price to the offeror representing the best value, based on an evaluation of the technical approach and fair and reasonable pricing. The period of performance is scheduled from June 15, 2027, to August 16, 2027, with work commencing within 10 calendar days of the notice to proceed. Technical specifications for the picnic tables include concrete bases with a minimum compressive strength of 5,000 psi, #4 steel reinforcement, and a design capable of withstanding a 500 lbs/ft2 snow load. The contract is subject to the Davis-Bacon Act and Buy American requirements. Quotations must be submitted by November 24, 2026, and must include a technical approach, pricing via the provided Schedule of Items Excel spreadsheet, and a bid guarantee. Inspection and acceptance will be conducted in accordance with FAR 52.246-12.
Other Concrete Product Manufacturing

POSTED

1 day ago

DEADLINE

in 27 days
View Details
NAICS: 237120
New
Federal
Nelson Drive Fuel Tank Removal
Solicitation # 1240LT27Q0012
Solicitation 1240LT27Q0012 is a firm fixed price contract issued by the USDA Forest Service for the removal of two 300-gallon steel underground fuel storage tanks at the Nelson Drive housing complex on the Bridger-Teton National Forest in Wyoming. The scope of work includes the extraction and disposal of the tanks, the cleanup and disposal of contaminated soils, and potential surface restoration. The contractor is required to field verify all existing conditions before ordering products and must adhere to OSHA standards for excavation and shoring, as well as IDEQ and government regulations for waste hauling and disposal. The estimated period of performance is from June 1, 2027, to June 30, 2027. This project is a total small business set-aside under NAICS code 237120. Award will be made based on the lowest price technically acceptable (LPTA) criteria, evaluating technical capability through an experience questionnaire, a project-specific quality control plan, and a review of past performance. Required submissions include a technical narrative detailing the approach to tank removal and soil remediation, as well as the qualifications of key personnel. The contract mandates performance and payment bonds and compliance with the Davis-Bacon Act for wage requirements. Quotes were due by November 13, 2026, with a requirement to hold pricing firm for 90 calendar days.
Oil and Gas Pipeline and Related Structures Construction

POSTED

5 days ago

DEADLINE

in 16 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS