Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Pioneer Park Specific Plan Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Pioneer Park Project proposes a comprehensive land use and zoning transformation for a 30.98-acre site in Redlands, California, shifting from commercial to residential development through a series of legislative actions. The project seeks to amend the General Plan to reclassify the site from Commercial to Medium Density Residential, remove it from the East Valley Corridor Specific Plan, and establish a new Pioneer Park Specific Plan that designates the area for residential use. The zoning change would replace the existing East Valley Corridor Special Development designation with the new Specific Plan No. 67. The plan permits a mix of land uses, including a Family Residential district covering 30.56 acres with a density of eight to nine units per acre and a Multiple-Family Residential district of 0.42 acres at 16 to 17 units per acre, allowing for up to 275 single-family homes and seven multi-family units. The Specific Plan also sets forth detailed standards for design, land use regulations, and infrastructure development. Accompanying the legislative requests is Tentative Tract Map No. 20797, which outlines the subdivision of the site into 255 lots for single-family homes averaging 2,737 square feet, one 0.41-acre lot for multi-family development, and 13 lettered lots totaling 4.54 acres designated for open space and stormwater management. The proposal includes the vacation of Tennessee Street through the site and the dedication of a new segment of New York Street along its eastern boundary, along with approximately 8.62 acres of public right-of-way for streets. The overall layout and density comply fully with the permitted thresholds under the Pioneer Park Specific Plan, ensuring consistency between the subdivision design and the established residential framework. The project is managed by the City of Redlands, with primary contact through the Senior Planner, and is publicly accessible through the CEQA Net portal with a posted date of June 5, 2026.

General Info

30.98-acre Redlands site to become residential with 275 single-family homes, seven multi-family units, and 8.62 acres of public right-of-way.

Agency

California → City of Redlands

NAICS

237210 - Land SubdivisionView NAICS

Place of Performance

Pioneer Avenue and Tennessee Street, Redlands, CA, 92373

Set-Aside

NONE

Documents

(15)

Geotechnical and Infiltration Evaluation for Redlands Residential Development

PDFgeotechnical-report

Public Review Draft Pioneer Park MND June 2026

PDFmitigated-negative-declaration

Air Quality, Energy, and GHG Impact Analysis for Pioneer Park Specific Plan Project

PDFenvironmental-impact-analysis

DTSC Comments on Pioneer Park Specific Plan MND 2026060272

PDFcomment

Preliminary Water Quality Management Plan for Pioneer Park Tract 20797

PDFwater-quality-management-plan

Pioneer Park Specific Plan Project SCH Summary Form

PDFenvironmental-summary

Pioneer Park Specific Plan Project Notice of Completion

PDFnotice-of-completion

Biological Resources Assessment for Redlands Pioneer Project

PDFenvironmental-assessment

Archaeological and Built Environment Resources Inventory and Evaluation Report for Pioneer and Tennessee Development Project

PDFreport

Phase I Environmental Site Assessment - Redlands Pioneer Property

PDFenvironmental-assessment

Burrowing Owl Suitability Assessment Report for Redlands Project

PDFenvironmental-assessment

Pioneer Park Specific Plan Noise and Vibration Impact Analysis

PDFimpact-analysis

Pioneer Park Specific Plan Construction Health Risk Assessment March 2026

PDFhealth-risk-assessment

Pioneer Park Specific Plan VMT Analysis March 2026

PDFvmt-analysis

Pioneer Park Project Notice of Intent to Adopt Mitigated Negative Declaration

PDFnotice-of-intent

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Redlands
Contacts3 people available
OfficeN/A
Organization / Agency
California → City of Redlands
Office AddressN/A
Contacts
Kevin BeerySenior Planner
Brady ConnollyAssistant Environmental Planner
Heather PearceProject Manager

Interested Companies (1)

Show more
EPD Solutions
Irvine, CA

Full Description

Show more
The Pioneer Park Project ("Project") involves a request for the following legislative approvals: an amendment to the General Plan, which would change the land use designation of the Project site from "Commercial" to "Medium Density Residential"; an amendment to Specific Plan No. 40 ("East Valley Corridor Specific Plan"), which would remove the Project site from the Specific Plan area; establishment of Specific Plan No. 67 ("Pioneer Park Specific Plan"), which would designate the site for residential development; and a Change of Zone, which would change the Zoning Map designation of the Project site from "East Valley Corridor Special Development (EV/SD)" to "Specific Plan No. 67." Family Residential district encompassing 30.56 acres with an allowed density range of eight to nine dwelling units per acre, and a Multiple-Family Residential district encompassing 0.42 acres with an allowed density range of 16 to 17 dwelling units per acre; overall, the Specific Plan would allow for the development of up to 275 single-family residences and seven multi-family units, for a total of 282 dwelling units. In addition to establishing land use designations, the Specific Plan would establish standards, land use regulations, design criteria and infrastructure plans for development in the plan area. The request for the legislative approvals is accompanied by a request for approval of Tentative Tract Map No. 20797, which is a subdivision proposal to: vacate the existing segment of Tennessee Street traversing the project site; dedicate a new segment of New York Street along the east side of the site; subdivide the site into 255 lots ranging in size from 2,006 to 6,256 square feet (2,737 square feet on average) for single-family residential development, one 0.41-acre lot for multi-family residential development, and 13 lettered lots totaling 4.54 acres for open space and storm water treatment; and dedicate approximately 8.62 acres as public right-of-way for street purposes. The residential density proposed by the tentative map is consistent with permitted densities set forth by the Pioneer Park Specific Plan.

Similar Contracts

Same NAICS industry code

NAICS: 237210
New
SLED
Villa Margherita—TSM No. 5608, CUP No. 2026-05, and Exception No. 2026-05The proposal seeks to subdivide a property in Visalia, California, into 82 single-family residential lots under Tentative Subdivision Map No. 5608, with accompanying infrastructure including landscaping outlots, lighting, and designated park spaces, all situated within the R-1 zoning classification. To accommodate the development’s design, a Conditional Use Permit has been requested to permit a planned unit development that deviates from standard lot size and setback requirements, allowing for greater density and flexible layout while still adhering to overall community planning goals. Alongside this, an exception request seeks relief from certain Objective Design Standards, specifically concerning architectural façade elements, to permit design variations that align with the planned aesthetic vision of the development. The project is being advanced by applicant Sam Sciacca and reviewed by the City of Visalia’s planning department, with Principal Planner Jarred Olsen serving as the primary point of contact. The application was posted on August 7, 2026, and is currently in the forecast phase, indicating it is under initial review and not yet submitted for formal approval. The proposed development is located within the city limits of Visalia, California, and all associated permits and exceptions are being evaluated under municipal regulations to ensure compatibility with local land use policies and community character. Further public input and agency review will be required before any approvals are granted.
City of Visalia

POSTED

1 day ago

DEADLINE

N/A
View Details
NAICS: 237210
New
SLED
Deer Creek Preserve - SALT AnaheimThe Deer Creek Preserve project in Anaheim, California, proposes a residential development on approximately 76.01 acres along E. Santa Ana Canyon Road between Festival Drive and Eucalyptus Drive, with a total of up to 359 housing units, including up to 299 single-family detached homes and up to 60 affordable senior housing units composed of 59 deed-restricted lower-income senior units and one manager’s unit. At least 16.4% of the total units are designated for lower-income households, with all affordable units subject to state-mandated restrictions through covenants, management protocols, and occupancy controls. The project includes necessary infrastructure such as roadway upgrades, utility improvements, a water quality basin, retaining walls, gated entries, a guardhouse, and monument signs. An optional recreation amenity center of up to 45,492 square feet may be constructed on a designated lot, but if not built, passive open space will occupy the site instead; environmental analysis assumes the worst-case scenario including the recreation center. The application seeks a Tentative Tract Map, Conditional Use Permit, and Specimen Tree Removal Permit and is submitted under the Housing Accountability Act as a Builder’s Remedy project, which exempts it from requirements for general plan or zoning amendments. Despite this exemption, the project is fully subject to environmental review under CEQA, requiring comprehensive analysis and mitigation of all significant environmental impacts.
City of Anaheim

POSTED

1 day ago

DEADLINE

N/A
View Details