Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Pipeline Corridor Access Road Construction

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Pipeline Corridor Access Road Construction subcontract, issued by the California Public Utilities Commission, focuses on the construction and temporary maintenance of access roads necessary for pipeline mitigation activities. The scope of work includes essential civil engineering tasks such as grading, erosion control, and the application of temporary surfacing across various designated work areas. Classified under NAICS code 237310 for highway, street, and bridge construction, this project is designed to ensure stable and compliant access for mitigation efforts. The solicitation was posted on August 29, 2025, and is managed through the state of California's regulatory framework.

General Info

CPUC subcontract for construction and temporary maintenance of pipeline corridor access roads.

Agency

California Public Utilities Commission

Place of Performance

CA

Set-Aside

NONE

Documents

This scope was carved out of EPIMS-SBR-58560-R6.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

TIMP Line 235 and Line 3000 El Dorado-Lugo-Mohave Alternating Current Pipeline Mitigation Project (Project) (LSAA No. EPIMS-SBR-58560-R6)

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 1 document on the prime contractFrom TIMP Line 235 and Line 3000 El Dorado-Lugo-Mohave Alternating Current Pipeline Mitigation Project (Project) (LSAA No. EPIMS-SBR-58560-R6)
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Public Utilities Commission
ContactsNo contacts available
OfficeN/A
Organization / Agency
California Public Utilities Commission
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Construction and temporary maintenance of access roads to support pipeline mitigation activities, including grading, erosion control, and temporary surfacing across multiple work areas.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
El Rancho Drive, La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135)
Solicitation # 40579
The El Rancho Drive and La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135), is a public infrastructure safety initiative managed by the County of Santa Cruz Department of Public Works. The project involves the installation of the Midwest Guardrail System and associated infrastructure repairs across 16 total locations, specifically 6 locations along El Rancho Drive and 10 locations along La Madrona Drive. The scope of work includes the removal of existing guardrails and AC dikes, cold planing AC pavement to a depth of 2 inches, constructing new AC dikes, and building earth retaining structures. The estimated cost of the project is 812,997 USD, with a required completion timeframe of 70 working days. The project is subject to strict federal and state regulations, including Buy America requirements for iron, steel, and manufactured products, and adherence to the Davis-Bacon and Related Act. It is a prevailing wage project governed by the Department of Industrial Relations. Contractors must provide a bid bond or security, as well as faithful performance and payment bonds upon award. Compliance requires rigorous documentation, including mill tags for steel products, certificates of compliance, and a clear chain of custody record verified by the Engineer. Proposals must be submitted electronically via the OpenGov portal and include mandatory certifications regarding debarment, non-collusion, and equal employment opportunity.
Public Works

POSTED

about 9 hours ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS