TIMP Line 235 and Line 3000 El Dorado-Lugo-Mohave Alternating Current Pipeline Mitigation Project (Project) (LSAA No. EPIMS-SBR-58560-R6)
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The California Department of Fish and Wildlife has issued Lake and Streambed Alteration Agreement EPIMS-SBR-58560-R6 to Southern California Gas Company (SoCal Gas) under Fish and Game Code section 1602 to authorize the installation of alternating current mitigation systems along pipeline segments L235 and L3000 in California. The project entails placing 2/0 copper grounding cables within ten feet of the pipelines to mitigate induced AC voltage and corrosion, alongside installing solid state decouplers and coupon test stations to monitor and manage electrical interference. Work activities are confined to specific geographic sections of the pipelines across multiple work areas designated as NWW-692, NWW-181, NWW-499, and others, all located within the state. The agreement is effective until June 17, 2030, with one permitted extension available through formal amendment and fee payment under Fish and Game Code §1605(b), but no automatic renewal applies. The contract is not a procurement agreement but a regulatory permit requiring strict environmental compliance, with the permittee bearing full responsibility for all contractors, subcontractors, and agents involved. The project imposes extensive environmental protection obligations including daily clearance surveys for wildlife entrapments, pre-construction biological surveys for special-status species like burrowing owls and Mohave ground squirrels, and mandatory reporting of any observed protected species to the California Natural Diversity Database within five working days and to CDFW within seven calendar days. Dead or injured endangered or fully protected species must be reported within 24 hours, and any agreement violation or construction suspension exceeding 30 days requires immediate notification. CDFW retains enforcement authority and may suspend or revoke the agreement for non-compliance. Designated biologists must be approved by CDFW, be present on-site daily during construction, and have the authority to halt work for violations. All personnel must be provided with a copy of the agreement, and records must be maintained on-site and made available to regulators upon request. Equipment previously used in livestock operations is prohibited, erosion control materials must be non-welded and biodegradable, and no hazardous materials or fueling is permitted in designated zones. The agreement includes no monetary value, pricing, or payment terms, and no standard Federal Acquisition Regulation clauses or contracting officer details are applicable, as it functions solely as a state environmental compliance instrument.
General Info
Agency
NAICS
Place of Performance
CASet-Aside
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
