Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Pipeline Material Supply (Water Main Pipes)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract entails the supply of pipe materials including HDPE, PVC, and ductile iron for the installation of 7,000 linear feet of water main, ensuring full compliance with municipal regulations and American Water Works Association standards. Materials must meet specified technical and quality requirements to support long-term infrastructure reliability and public safety. The work is positioned as a subcontract under the City of Watsonville’s infrastructure initiative, with performance required in Watsonville, California, specifically at the ZIP code 95076. The NAICS code 423330 identifies the industry as wholesale trade of plumbing and HVAC equipment, indicating that the supplier must function as a distributor or manufacturer of approved water main piping systems. The solicitation was posted on June 26, 2026, and while no set-aside designation or point of contact is provided, the project is part of a larger municipal effort documented under project ID 2026040994 through the CEQAnet system.

General Info

Supply HDPE, PVC, and ductile iron pipes for 7,000 ft water main in Watsonville, CA 95076, per AWWA standards.

Agency

California → City of Watsonville

NAICS

423330 - Roofing, Siding, and Insulation Material Merchant WholesalersView NAICS

Place of Performance

Watsonville, CA, 95076

Set-Aside

NONE

Documents

This scope was carved out of 008-26 NOD.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Crestwood Heights Water Association Water System Consolidation Project

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Watsonville
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → City of Watsonville
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply of pipe materials such as HDPE, PVC, or ductile iron for 7,000 linear feet of water main installation, compliant with municipal and AWWA standards.

Similar Contracts

Same NAICS industry code

NAICS: 423330
New
SLED
FPCM-SVSP-I001020-103-KM COMPLETE ROOFING SYSTEM
Solicitation # FPCM-SVSP-1001020-103-KM
The California Department of Corrections and Rehabilitation is soliciting bids for a material-only purchase of complete roofing systems for Buildings 461 and 420 at Salinas Valley State Prison. The scope includes the delivery of 80 mil adhered PVC thermoplastic roofing membranes with factory-applied felt backing, tapered XPS insulation, flashings, anchors, and Snap On coping metal. All materials must meet FM Global listings for wind uplift and adhere to CDCR approved design criteria and safety standards. A non-prorated, manufacturer's standard 10-year full system warranty is required, though payment for the warranty is contingent upon installation and acceptance by a manufacturer's representative. Bids are due by November 10, 2026, and must be submitted as F.O.B. Destination. The award will be granted to the lowest responsive and responsible bidder. Prospective bidders must attend a mandatory walk-thru and provide a detailed materials list and a completed Roof System Review Checklist. Deliveries must be coordinated with project CSIIs and completed within three business days of a written request from the Construction Supervisor. Because the delivery site is within a secure perimeter, the supplier is responsible for obtaining and submitting all necessary security clearances to CDCR. Invoices must be submitted in triplicate and include extended item prices and the total amount.
California Department of Corrections & Rehabilitation

POSTED

3 days ago

DEADLINE

in about 2 months
View Details
NAICS: 423330
New
SLED
FPCM-HDSP-I001066-PH2-148-KR Roof Replacement for HDSP
Solicitation # FPCM-HDSP-I-001066-PH 2-148-KR
The California Department of Corrections and Rehabilitation has issued solicitation FPCM-HDSP-I-001066-PH 2-148-KR for a product-only purchase of a complete roofing assembly for Building 352 at High Desert State Prison in Susanville, California. The project requires the provision of an 80 mil adhered polyvinyl chloride (PVC) thermoplastic roofing membrane with a white exposed face to cover approximately 31,000 square feet. The scope includes all necessary components such as extruded polystyrene and tapered insulation, membrane flashings, vapor barrier retarders, protection roof boards, scuppers, and roof vents. Additionally, the contractor must provide cladded sheet metal products, adhesives, sealants, a 10-year full system warranty, and technical assistance including on-site inspection, testing, training, and certification. Bids are due by November 5, 2026, and must be submitted using the state's official bid forms to be considered responsive. The award will be made on an all-or-none basis, with a 5% preference available for certified small businesses or non-small businesses claiming 25% small business subcontractor participation. All bids must be quoted as F.O.B. Destination. Technical requirements include compliance with CCR Title 24 and CBC standards for flame-spread and smoke density, as well as adherence to ASTM and UL assembly standards. The supplier is responsible for obtaining necessary security clearances for delivery within the secure prison perimeter and must maintain commercial general liability and workers' compensation insurance. Final payment for the roof warranty is contingent upon installation and acceptance by the manufacturer's representative.
California Department of Corrections & Rehabilitation

POSTED

6 days ago

DEADLINE

in about 2 months
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS