Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from General Services Administration was posted on December 10, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

PJKK Pavilion Design Build and Courthouse Hardening

Closed
PJKKPavilionFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific focus on the Riverside and Los Angeles project areas, is designated as a set-aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation. The solicitation was posted on October 21, 2026, with a response deadline of November 4, 2026. A critical component of this contract is strict adherence to six Good Faith Effort (GFE) requirements designed to secure project financing and expand upon State Water Resources Control Board standards. Bidders must provide proof of publicity, including online postings for 30 consecutive days and a one-day print newspaper advertisement, as well as evidence of utilizing the Small Business Administration and Minority Business Development Agency. These specific documents must be submitted with the bid package to avoid being deemed non-responsive. Additionally, documentation of DBE outreach may be submitted up to three business days after the bid closing date. Failure to comply with these GFE mandates will result in the disqualification of the proposal.
RT CONTRACTOR CORP

POSTED

about 6 hours ago

DEADLINE

in 13 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Additionally, Option 1 includes a separate 17,978 square foot laboratory facility with similar structural specifications and the demolition of Building 1272T, a 548 square meter engineering facility. The scope of work encompasses comprehensive site improvements, including landscaping, parking, exterior lighting, telecommunications, and underground stormwater retention systems. Pricing is requested across a wide range of trades, including demolition, abatement, concrete, masonry, structural steel, mechanical, electrical, plumbing, and fire protection. This is an SBA set-aside solicitation for small businesses and other designated disadvantaged business categories. All work must adhere to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 6 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project scope is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of the plant featuring a packaged Membrane Bioreactor, headworks, UV disinfection, SCADA systems, and various support buildings; decommissioning and demolition of existing facilities; and finish facilities including the Walnut Avenue extension and a second sludge handling unit. The total duration for the project is 915 calendar days, with a critical requirement to maintain existing plant services and regulatory compliance throughout the first two phases. Managed by C. Overaa & Co., the solicitation is open to various small and disadvantaged business enterprises, including DBE, SDVOSB, and WOSB. A significant local hiring goal requires that 50 percent of the total construction workforce be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and agree to the Overaa standard agreement without modification. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Performance and labor bonds for 100 percent of the subcontract price may be required, and all subcontractors must provide a waiver of subrogation endorsement for workers compensation insurance.
C. Overaa & Co.

POSTED

about 6 hours ago

DEADLINE

in 19 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project located at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the installation of overhead cranes, reinforced concrete floors, grounding and lightning protection, and intrusion detection systems. Additionally, the project requires the construction of a new Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. The technical requirements encompass extensive sitework, including clearing, rock excavation, grading, and the implementation of rigid inclusions and load transfer mats for foundations. Due to the impact on existing wetlands, mitigation efforts are required. Infrastructure improvements include new access roads, paved loading areas, landscaping, and a complete electrical utility system featuring primary and secondary distribution, transformers, and telecommunications. This solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and VOSB. Interested parties must respond by October 31, 2026.
J & J Contractors, Inc

POSTED

about 6 hours ago

DEADLINE

in 9 days

General Info

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Honolulu, HI, 96850, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeneral Services Administration → Pbs R9 Amd Capital Projects
Contacts1 person available
OfficeSAN FRANCISCO, CA, 94102, USA
Office AddressSAN FRANCISCO, CA, 94102, USA
Contacts

Full Description

Show more
This is a Sources Sought Notice. No proposals are being requested or will be accepted in response to this posting. If you are interested in proposing on the general scope of work stated below for a Design-Build Project, please respond by email only to krista.miller@gsa.gov. Please provide your bonding capacity, a capability statement, and your small business and small business socioeconomic status, if any. Please include in your capability statement projects which your firm has completed that are particularly relevant to this scope of work, especially involving exterior structural and glazing improvements, and/or performed in Hawaii. General Statement of Work Summary: The Prince Jonah Kuhio Kalaniana'ole (PJKK) Federal Building and Courthouse is located at 300 Ala Moana Blvd., Honolulu, within the Hawaii Capital district and on the outskirts of the downtown central business district. This reinforced, cast in place concrete with concrete masonry and glass curtain walls is a two-building mid-century modern complex originally constructed in 1977. The illuminated entry pavilion was originally designed by Gensler SF and constructed by Swinerton Construction in January 2015. The illuminated entry pavilion design was an elegant, iconic AIA award winning design that unified two separate entries into a single, sky lighted and transparent entrance for the PJKK Complex. The single portal/pavilion simplified the circulation for the public and created a strong sense of entry for PJKK. On April 6, 2021 a fire occurred at the entry pavilion that created significant damage. On January 24, 2022, Clifford Planning Architecture completed a Fire Investigation Report that stated - it is probable the entry pavilion fire initiated was a result of an electrical fault within the LED light panel installed adjacent to the bottom panel of the south wall of the entry pavilion. Low level arcing over a period of time was the likely source of heat for ignition of the acrylic panel material (See Volume 4 - Fire Investigation). As further defined in the Fire Investigation Report, there was fire damage to architectural finishes and structural members. The scope of work for the entry pavilion includes, but is not limited to, installing (2) temporary covered entry tunnels to the existing United States Marshal Service (USMS) and Federal Protection Services (FPS) security check-point locations, providing code compliant construction documents and full design services that adhere to the original Gensler design and architectural appearance of the original entry pavilion, while also making the necessary design changes to address the issues that contributed to the fire and smoke damage as further defined in Volume 4 - Fire Investigation. The design should also include solutions for the following known building maintenance issues: 1. The original design LED panels were located behind heavy glass panels that created issues for regular maintenance and care. 2. The original designed entry door operated on a small pin that would fail and was difficult to replace. In addition to the scope above, the design and construction of the courthouse hardening upgrades to the entry pavilion and ground level windows and doors facing Halekauwila Street and Ala Moana Boulevard are a requirement for this project. The judiciary had previously sought from Congress supplemental appropriations to fund enhanced security measures to protect judges and the judicial process in response to the civil unrest following the murder of George Floyd and the January 6th attack on the U.S. Capitol. The Judicial Conference approved funding to begin enhanced security measure projects to harden courthouses. Initial stakeholders from the General Services Administration (GSA), the Administrative Office of the U.S. Courts (AO), U.S Marshals Service (USMS), and the Federal Protective Service (FPS) worked together to analyze potential security measures to be used in this program. This scope of work covers the countermeasures for the PJKK Courthouse in Honolulu, HI: 1. Windows: Impact resistant window glazing system at the Entry Pavilion and ground level Courthouse windows and doors facing Halekauwila Street and Ala Moana Boulevard, excluding ground level windows along the United States Marshal Service offices and within the confines of the exterior secured courtyard: ? Windows / Doors / Frames - Shall meet a minimum 15-minute forced entry resistance per ASTM F3038 OR Dept of State (DoS) SD-STD.01.01 Rev G (Amended) - forced entry resistance is the standard that shall apply. ? The contractor shall install a new shatter break resistance riot glazing system ? Contractor is responsible to field verify and measure each opening. 2. Exterior Doors and Hardware (See Volume 2B_Existing Pavilion Design Drawings for specific locations): ? All exterior pavilion entry doors and interior courthouse pavilion vestibule doors shall be equipped with hardware and controls to engage electro-magnetic and/or electro-mechanical remote locks. ? Remote locks shall give the ability for the Court Security Officers and the USMS to lock all doors immediately in case of an emergency. ? Remote lock override control shall run to the main USMS / CSO Control Room The courthouse hardening upgrades will upgrade the ground level Courthouse windows and doors and replace all window, exterior doors, and hardware included in the original Gensler designed PJKK entry pavilion. The forced entry resistance doors and windows shall meet a minimum 15 minute forced entry resistance in accordance with ASTM Standard F3038-21, with the following exception. ASTM Standard F3038-21 requires a full scale test for each unique system size and configuration, however, if the actual overall system dimensions are within 6 (both height and width dimension) of another successfully tested system meeting the requirements of ASTM Standard 3038-21, and the system components are of similar size and makeup, the proposed system shall be considered acceptable. Support documentation shall be provided prior to installation. The construction services scope of work includes demolition of the remaining pavilion structure, build-out of (2) temporary tunnels to access the existing USMS and FPS security check-points, the build-out of the new entry pavilion, installation of the courthouse hardening window and door upgrades, including but not limited to structural, architectural finishes, lighting, mechanical, electrical, plumbing, fire and life safety, and data/cabling infrastructure. The Federal Building and Courthouse must remain fully operational throughout design and construction. All construction work related to this project shall be scheduled from 5:00 pm to 7:00 am, after normal building operation hours to minimize disruptions to building occupants and to maintain public safety. Normal building operation hours are from 7:00 a.m. to 5:00 p.m. weekdays. The project delivery method is Design-Build (DB). The DB Contractor shall provide all supervision, labor, materials, equipment, and testing required to accomplish the design and construction for the PJKK Entry Pavilion and Courthouse Hardening Project. Design services shall include, but are not limited to, design and certification by a State of Hawaii licensed Architect-Engineer (A/E), design reviews, weekly progress meetings, design development, construction documents, basis of design documents, site investigation, site measurements and verification, code compliance, reproduction services, consultant coordination, contract administration, contract close-out, record drawings and as-builts. Construction services shall include, but are not limited to, complete and timely submission of security clearance applications for workers (HSPD-12 and tenant agency review), project schedule, cost estimating, 3-week look ahead schedules, demolition, site supervision, drywall, mechanical, electrical, automatic sprinkler system, architectural finishes, submittal samples, submittal schedule, HVAC, system balancing, structural, fire and life safety, security infrastructure, protocols for utility outages, separation of utilities to avoid impacts to occupied areas, temporary barricade plan, noise mitigation, clean up after work, lead weekly meetings and provide minutes, file and record management, and all other work to meet the contract requirements.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS