Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

PLN23-0150 Fitwell Health Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The PLN23-0150 Fitwell Health Project involves the two-phase development of an 8.27-acre site in Menifee, Riverside County, California. Phase 1 consists of a 69,618-square-foot building, approximately 54 feet in height, which will house a fitness center, multipurpose center, and museum. Phase 2 is planned for future development and will include a 16,616-square-foot two-story office building. The project includes comprehensive site improvements such as landscaping, drainage enhancements, and the installation of water and sewer lines connecting to facilities on Haun Road. Total parking for the project is 468 spaces, featuring a mix of standard, ADA, ADA van, and electric vehicle charging and capable spaces. The project is subject to the California Environmental Quality Act (CEQA), with a Mitigated Negative Declaration indicating no significant environmental effects. Extensive technical assessments have been completed, including a Phase I Environmental Site Assessment, geotechnical and infiltration feasibility studies, and a Transportation Impact Analysis forecasting 2,376 daily trips. The construction schedule begins with grading in October 2025, followed by building construction through November 2026, and concludes with architectural coating in late 2026. Special requirements include strict protocols for the discovery of human remains and the submission of cultural and paleontological monitoring reports to the City of Menifee.

General Info

Two-phase development of fitness, museum, and office buildings in Menifee, California.

Agency

California → City of Menifee

NAICS

236220 - Commercial and Institutional Building ConstructionView NAICS

Place of Performance

Garbani Road and Haun Road, Menifee, CA, 92584

Set-Aside

NONE

Documents

(15)

Noise Measurement Report NM-1 and NM-2 06/19/2024

PDFnoise-measurement-report

Preliminary Drainage Report for Fitwell Health Campus Menifee

PDFreport

Cultural Resources and Paleontological Identification Report for PLN23-0150 Fitwell Health Project

PDFreport

Biological Resources Habitat Assessment for PLN 23-0150 Fitwell Health Project

PDFbiological-resources-assessment

PLN23-0150 Fitwell Health Notice of Public Hearing and Intent to Adopt Mitigated Negative Declaration

PDFspecial-notice

PLN23-0150 Fitwell Health Project Notice of Completion

PDFnotice-of-completion

Transportation Impact Analysis for Fitwell Health Project

PDFtransportation-impact-analysis

PLN23-0150 Fitwell Health Project Summary Form

PDFenvironmental-summary

PLN23-0150 Phase I Environmental Site Assessment Fitwell Health Campus

PDFphase-i-esa

PLN23-0150 Fitwell Health Draft Initial Study/Mitigated Negative Declaration

PDFenvironmental-study

H2_VMT Memo - Fitwell Health VMT Assessment

PDFtechnical-memorandum

Preliminary Geotechnical and Infiltration Feasibility Investigation for Fitwell Campus

PDFgeotechnical-report

Menifee Fitwell Health Phase 1 Emissions and Climate Risk Report

PDFreport

F2 Preliminary Water Quality Management Plan for Fitwell Health Campus Menifee

PDFwqmp

PLN23-0150 Fitwell Health Project Notice of Determination

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Menifee
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Menifee
Office AddressN/A
Contacts
Fernando HerreraSenior Planner
Dr. Moustafa El-GuindyApplicant

Interested Companies (1)

Show more
Michael Baker International
Lakewood, Colorado

Full Description

Show more
The proposed PLN23-0150 Fitwell Health Project (project) consists of the development of two buildings on an 8.27-acre site in two phases. Phase 1 would include development of an approximately 69,618-square-foot building which would house a fitness center, multipurpose center and museum in the southern portion of the project site. Phase 2, proposed for future development, would include an approximately 16,616-square foot two-story office building in the northern portion of the project site. The proposed building height of the Phase 1 building would be approximately 54 feet. Phase 1 would provide approximately 418 parking spaces, inclusive of 7 ADA spaces, 2 ADA van spaces, 63 electric vehicle (EV) capable spaces, 21 electric vehicle charging station (EVCS) spaces, and 325 standard parking spaces. Phase 2 would provide 50 parking spaces, inclusive of 1 ADA parking space, 1 ADA van parking space, 6 EV capable spaces, 2 EVCS space, and 40 standard parking spaces. In total, the project would provide approximately 468 parking spaces. The project would also include the development of drainage improvements, landscaping, and site access. Additional improvements include installation of water and sewer lines to connect to existing water and sewer facilities on Haun Road.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
SLED
DB Construction for HC-130J Flight Simulator Facility at USCG Elizabeth City, NC
Solicitation # 32000479
This design-build project involves the construction of a full motion Weapons System Trainer flight simulator facility for C-130J aircraft at USCG Base Elizabeth City, North Carolina. The approximately 13,000 gross square foot facility will include a simulator bay for Government Furnish, Government Installed equipment, classrooms, debriefing areas, administrative offices, and various support spaces such as electrical, mechanical, and telecommunications rooms. Site work includes the installation of sidewalks and landscaping while utilizing existing parking areas. The project is issued as a task order under the National Multiple Award Construction Contract III, Pool Two, with an estimated contract value of approximately 16 million dollars and a period of performance of 719 calendar days from award. The procurement utilizes a best-value tradeoff selection process, weighing price against non-price factors including planning, organization, communication, and the proposed construction approach. Technical requirements specify the use of Siemens Building Automation Systems for installation-wide compatibility and adherence to UFC 4-010-06 cybersecurity standards. All on-site personnel must be US citizens, and security clearance is managed via RAPIDGate. The project is subject to Davis-Bacon Act wage determinations for building and heavy construction in Pasquotank County. Quality control is mandated per FAR 52.246-12, with specific ASTM standards required for the testing of concrete, soil, and structural steel.
Bristol Alliance of Companies

POSTED

about 9 hours ago

DEADLINE

in 3 days
View Details
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is seeking pricing for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility, as well as an optional 17,978 square foot laboratory facility. Both structures will feature shallow foundations, structural steel framing, standing-seam roofs, and a combination of masonry and metal panel exterior walls. The scope of work is extensive, covering everything from demolition of an existing engineering facility to comprehensive site improvements, including stormwater retention, utilities, landscaping, and parking. Bids are requested across numerous trades, including concrete, masonry, electrical, mechanical, plumbing, and structural steel. The project adheres to Davis Bacon Wage Rates and is exempt from sales tax. This opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, and SDVOSB. Interested parties must contact Rahul Maheshwari to receive the formal bid invitation and project documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 9 hours ago

DEADLINE

in 2 months
View Details
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
This solicitation by J & J Contractors, Inc. is for the construction of the P1102 Weapons Magazine and Ordnance Operations Facility at the Naval Submarine Base New London in Groton, Connecticut. The project involves a comprehensive scope of work over 1828 calendar days, including the construction of six Containerized Long Weapons Storage units and three earth-covered high-explosive magazines equipped with overhead cranes. Additional structures include a new Ordnance Operations building, a Truck Inspection area, and a Sentry building. The project also requires the demolition of 18 existing magazines and two specific buildings, along with extensive site preparation involving rock excavation, grading, and wetland mitigation. Technical requirements include specialized foundation features such as rigid inclusions and load transfer mats, as well as the installation of grounding, lightning protection, and intrusion detection systems. The scope covers a wide array of trades, including structural steel, electrical utilities, plumbing, mechanical systems, and paving for access roads and loading areas. This opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, and SDVOSB. Interested parties must respond by October 31, 2026, and should contact Rahul Maheshwari for bid invitations and documentation.
J & J Contractors, Inc

POSTED

about 9 hours ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS