Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

POL,PPS,AASF Concord-Fuel System Repairs

Active
W9128F27RA040Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of Defense → W071 Endist OmahaView Agency

NAICS

237120 - Oil and Gas Pipeline and Related Structures ConstructionView NAICS

Place of Performance

Concord, NH, NE, 03054

Set-Aside

SBA

Documents

(2)

Synopsis_Concord.pdf

PDF

CONH00100 - Fueling System Repairs Technical SOW

PDFsow

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

PhasePresolicitation
Posted

Presolicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W071 Endist Omaha
Contacts1 person available
OfficeOMAHA, NE, 68102-4901, USA
Organization / Agency
Department Of Defense → W071 Endist Omaha
View Agency Profile
Office AddressOMAHA, NE, 68102-4901, USA

Full Description

Show more
****This is a pre solicitation notice only and includes a draft Scope of Work.This project includes replacing the grounding and high-level shut-off valves for both F-24 tanks (Tank 1 and Tank 2), extending the tank catwalk platform, and installing a check valve on the relief discharge into Tank 2. Additionally, the scope involves installing a truck offload meter, a visual fuel flow indicator, an eyewash station, and a filter separator maintenance platform for the truck offload/fillstand, while providing integrated truck overfill prevention and ground verification systems. To complete the facility upgrades, the project also incorporates all necessary work to install protective pipe bollards for the offload/fillstand, replace the equipment shelter ground system, provide a ground verification system for offload operations, and execute the complete supply, installation, and testing of the Automatic Tank Gauging (ATG) system on fuel storage tanks 1 and 2.

Similar Contracts

Same NAICS industry code

NAICS: 237120
New
Federal
Concord-Fuel System Repairs
Solicitation # W9128F26RA075
The Concord-Fuel System Repairs project, managed by the U.S. Army Corps of Engineers Omaha District, involves comprehensive upgrades to the fueling systems at the Army Aviation Support Facility in Concord, New Hampshire. This 100% Small Business Set-Aside project under NAICS 237120 focuses on the design, construction, and testing of critical infrastructure. Key technical requirements include replacing grounding and high-level shut-off valves for F-24 tanks, extending tank catwalk platforms, and installing a relief discharge check valve on Tank 2. The scope also encompasses the installation of a truck offload meter, a visual fuel flow indicator, a filter separator maintenance platform, and a heated emergency eyewash station certified to ANSI/ISEA Z358.1. Additional facility improvements include the installation of protective pipe bollards for the offload/fillstand, a new ground verification system for offload operations, and the replacement of the equipment shelter ground system. A primary component of the project is the complete supply, installation, and testing of an Automatic Tank Gauging (ATG) system for fuel storage tanks 1 and 2. All work must adhere to strict regulatory standards, including UFC 3-460-01, NFPA 30, and EM 385-1-1 safety requirements. Award is based on the submission of a technically acceptable proposal in accordance with the Statement of Work, with the solicitation expected to be issued around October 7, 2026, and closing on or about November 6, 2026.
W071 Endist Omaha

POSTED

about 19 hours ago

DEADLINE

in 15 days
View Details
NAICS: 237120
New
International
Civic Yards Fuel Site Upgrades
Solicitation # 2026-085
The City of Red Deer is seeking proposals for the Civic Yards Fuel Site Redevelopment project under solicitation 2026-085. The scope of work involves a comprehensive assessment, engineering design, and the upgrade or replacement of aging fueling infrastructure, including fuel dispensers, concrete pads, and fuel monitoring systems such as Petro-Vend and Maglink. The selected proponent will provide end-to-end services encompassing procurement, construction management, testing, commissioning, and staff training. Proposals must be submitted electronically via the bids and tenders platform by October 16, 2026, at 4:00:59 P.M. Alberta Time. The contract includes a two-year warranty period from the date of installation or commissioning and requires the submission of as-built drawings within 90 days of substantial completion. Financial security is a key requirement, with the successful contractor providing both a performance bond and a labour and material payment bond, each valued at 50 percent of the contract price. Payment terms are set at 30 days from receipt of invoice, though the City may withhold 20 percent of fees based on performance and 5 percent until as-built drawings are received. Safety compliance is mandatory, requiring a current COR or SECOR certification endorsed by the Government of Alberta or an equivalent safety program. Award selection is based on a multi-stage evaluation of mandatory requirements, rated criteria, and optional interviews, with a tie-breaking preference for the highest score in the proposed solution and methodology.
City of Red Deer

POSTED

3 days ago

DEADLINE

in 25 days
View Details
NAICS: 237120
New
SLED
Gas Station Renovation Naval Base Kingsbay
Solicitation # P27-4200-09
The Camden County Board of Commissioners is soliciting competitive sealed proposals under RFP #P27-4200-09 for the turn-key renovation of the NEX Mini Mart and Gas Station at Naval Submarine Base Kingsbay. The project involves a comprehensive overhaul of fuel storage, dispensing, electrical, and POS infrastructure, including the removal of old underground storage tanks and the installation of new USTs, piping, and Gilbarco dispensers. The work must be executed in six phases over a 90-day window following the Notice to Proceed, with a mandatory pre-proposal meeting scheduled for October 1, 2026. All work must comply with EPA, Georgia EPD, DoD, and NFPA standards, and final acceptance requires third-party tightness testing and factory-certified commissioning by technicians from Gilbarco, Veeder-Root, and Verifone. Proposals are due by 2:30 p.m. on October 15, 2026, and must be submitted in a sealed envelope to the Camden County purchasing office. Submission requirements include one original and three copies of the proposal, featuring a notarized E-Verify affidavit, a signed W-9, and a detailed fee schedule. The contract will be awarded to the most responsible and responsive bidder based on price, equipment quality, and warranty. Selected contractors must provide performance and payment bonds totaling 100% of the contract amount, maintain at least $1,000,000 in liability insurance, and ensure all personnel pass the Defense Biometric Identification System security clearance for base access. Payment is structured as 90% of approved estimates within 30 days, with a 10% retainage held by the owner.
Camden County Board of Commissioners

POSTED

4 days ago

DEADLINE

in 24 days
View Details
NAICS: 237120
New
Federal
117 Fuel Tank Removal
Solicitation # W50S6M26QA018
Solicitation W50S6M26QA018 is a total small business set-aside for the 117th Air Refueling Wing in Birmingham, Alabama, to provide non-personal services for the environmental closure and removal of three 5,500-gallon steel, double-walled fuel tanks. The scope of work includes the removal of associated catwalks, scaffolding, and electrical components, including all wiring and conduit leading into Building 40. The contractor is responsible for purging the tanks, disposing of fuel and water mixtures, and ensuring all activities comply with EPA and Air Force regulations, as well as ANGETL, ANG Handbook, and Unified Facilities Criteria. The period of performance is 90 days, spanning from September 30, 2026, to January 8, 2027. The government intends to award a Firm Fixed Price contract based on the best value, evaluating price, technical acceptability, and past performance. Offerors must be registered in SAM.gov and submit a complete package including a signed SF 1449, a priced CLIN schedule, and two to three past performance references by September 23, 2026. A site visit is highly encouraged on September 17, 2026, and requires pre-registration with security details. Payments will be processed monthly in arrears through the Wide Area Workflow system. The project falls under NAICS code 237120 and adheres to specific labor standards and cybersecurity requirements.
W7MT Uspfo Activity Alang 117

POSTED

6 days ago

DEADLINE

in 1 day
View Details
NAICS: 237120
New
SLED
Camp Washoe Gas Upgrade
Solicitation # 43ADG-S4017
The Nevada National Guard Office of the Military is soliciting proposals under solicitation 43ADG-S4017 for gas supply line restoration services at Camp Washoe in Reno, Nevada. The project involves the installation of approximately 160 to 170 linear feet of 2-inch polyethylene gas service pipe, including all necessary trenching, excavation, and final surface restoration. The selected contractor will be responsible for obtaining all required City of Reno permits for pavement cutting and traffic control, coordinating with NV Energy and the NVARG Project Manager, and ensuring the installation is code-compliant according to the Gas Distribution Guide Vol. 15. A mandatory site visit was scheduled for October 16, 2026, and final proposals must be submitted via nevadaepro.com by November 10, 2026. Award decisions will be based on the best interest of the State, evaluating factors such as competence, experience, personnel, and cost, with a 30 percent weight assigned to the cost factor and a five percent preference for Nevada-based businesses. Contractors must provide a minimum one-year warranty on all labor and materials. Strict security and compliance requirements are in place, including mandatory background checks via Annex D for all personnel, proof of liability and worker's compensation insurance naming the Office of the Military as additionally insured, and adherence to State of Nevada Occupational Safety and Health Standards. Payment will be processed via electronic transfer, and vendors must be registered with the State of Nevada Controllers Office.
431 - Adjutant General and National Guard

POSTED

6 days ago

DEADLINE

in about 1 month
View Details

More opportunities from Department Of Defense → W071 Endist Omaha

Same awarding agency

NAICS: 236220
New
Federal
Industry Feedback for Draft Requirements, Solicitation, and Request for White Papers for Other Transaction (OT) - Initial Minot Sentinel Beddown (IMSB), Minot Air Force Base, North Dakota (ND)
Solicitation # W9128F26SM025
The Initial Minot Sentinel Beddown (IMSB) project suite, managed by the USACE Omaha District, involves the construction of three key facilities at Minot Air Force Base, North Dakota: a Consolidated Vehicle Maintenance Complex, a Security Forces Operations Complex, and an Athletic Complex. These projects support the Ground Based Strategic Deterrent (GBSD) Sentinel Program to modernize the nation's land-based nuclear deterrent. The procurement utilizes a Design-Bid-Build approach under Other Transaction Authority (OTA) pursuant to 10 U.S.C. § 2808a, meaning it is not subject to standard FAR-based contract clauses. The total project suite funding is capped at 203 million dollars, with individual project magnitudes ranging from 5 million to 108 million dollars. Performance periods are specified as 920 calendar days for the Security Forces Operations Complex and 550 calendar days for the Athletic Complex. The government is employing a qualifications-based selection methodology consisting of a two-step evaluation process. Step one involves a comparative evaluation of white papers focusing on bonding capacity, relevant experience, staffing, and execution strategy. Approximately three highly qualified contractors will then be invited to step two, which consists of a pitch meeting to evaluate their understanding of the project suite, subcontractor engagement, and technical approach. The project is structured in two phases, with phase one focusing on pre-construction services and open-book pricing to develop a final construction price for the phase two award. Interested parties must be registered in the System for Award Management (SAM) and possess a valid Unique Entity Identifier. Feedback on the draft requirements and white paper requests was due by September 23, 2026, with the official request for qualifications planned for October 2026.
Commercial and Institutional Building Construction

POSTED

about 19 hours ago

DEADLINE

in 1 day
View Details
NAICS: 238120
New
Federal
Gavins Point Crane Rail Replacement
Solicitation # W9128F26RA023
The U.S. Army Corps of Engineers, Omaha District, is soliciting bids for the Gavins Point Intake Crane Rail Replacement project located in Crofton, Nebraska. This unrestricted solicitation, open to both large and small businesses under NAICS code 238120, involves the removal and replacement of the 80-ton powerhouse intake gantry crane runway rail. The scope of work includes an initial alignment survey, demolition of existing rails, clips, and anchors, and the installation of new rails aligned to CMAA 70 standards. A key requirement is the replacement of approximately 80 percent of existing anchors and all joint bar anchors with hardware suitable for cracked concrete and seismic loading, followed by filling grout pockets with two-component aliphatic polyurethane elastomer grout. The project is estimated to cost between 1,000,000 and 5,000,000 dollars, with a performance period of 365 calendar days from the Notice to Proceed. Contractors must follow a specific sequencing plan to minimize crane downtime, typically progressing from one side of the dam to the other. The solicitation closes on October 2, 2026, and includes a site visit scheduled for September 3, 2026. Amendment 0001 has updated the submission requirements to include a Small Business Participation Proposal Worksheet. Proposals will be evaluated based on a best-value unrestricted RFP process, with firm-fixed-price line items for mobilization, demolition, and installation.
Structural Steel and Precast Concrete Contractors

POSTED

about 19 hours ago

DEADLINE

in 11 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS