Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

POLE CREEK CULVERT PROJECT - SAWTOOTH SNRA

Active
AG-0261-S-13-0043Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Contract Value

$133,222.33

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

STANLEY, ID, USA

Set-Aside

SBA

Award Issued Date

Documents

2

AMENDMENT_1.pdf

PDF

POLE_CREEK_CULVERT_REPLACEMENT_PROJECT_2013.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseSolicitation
Posted

Presolicitation

Notice updated

The notice description changed.

Type Changed

Presolicitation → Solicitation

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Boise National Forest
Contacts2 people available
OfficeBOISE, ID, 83709, USA
Office AddressBOISE, ID, 83709, USA

Full Description

Show more
POLE CREEK CULVERT PROJECT -- SAWTOOTH SNRA IN APPROXIMATELY 15 DAY'S, THE SOLICITATION FOR THIS CONSTRUCTION PROJECT WILL BE AVAILABLE TO VIEW AND PRINT. The intent of the contract is to provide for the complete construction of the project described in the contract. Unless otherwise provided, the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies and perform all work required to complete the project in accordance with drawings, specifications, and provisions of the contract. This Request for Proposal consists of furnishing all of the material and labor to construct a bypass and divert the creek, remove an existing 5'-5" x 7'-9" arch culvert, supply and construct new treated timber abutments and wingwalls, the installation of structural backfill, a treated timber superstructure, timber curbs, installing a bituminous wear surface on bridge and approaches, and installing 4 Type 3 object markers on glued-laminated guard posts. Incidental work may include but is not limited to reconstruction of approximately 40' of streambed, installing rip rap, minor roadway work to create a smooth transition from bridge to roadway, erosion control and traffic control for the project. LOCATION AND DESCRIPTION This project is located on FS Road 70194; Blaine County; Township 7 North, Range 15 East, Section 30; approximately 25 miles south of Stanley and 36 miles north of Ketchum. The project may be reached by following State Highway 75 south out of Stanley for approximately 25 miles, or traveling north on Highway 75 out of Ketchum approximately 36 miles, turn east onto Forest Road 70194, and proceed approximately 2.0 miles to the crossing of Pole Creek. CONTACT KEVIN DUCHOW (208) 737-3318 FOR MORE INFORMATION. ESTIMATED PRICE RANGE - Between $100,00 to $250,000 Contract Time Will Be 130 days with an estimated start date of June 1, 2013. NAICS Code: 237110 Size Standard: $33.5 This proposed procurement is a TOTAL SMALL BUSINESS set aside.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with an estimated value of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The contractor is responsible for delivering a fully operational facility, including the installation of pumps, a generator, odor control equipment, new gravity sewers, and manholes, while managing by-pass pumping, testing, and commissioning. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on MWBE compliance through the submission of Good Faith Efforts and Table A documentation. Bids are due by November 12, 2026, and must be submitted using the EJCDC C-410 Bid Form. The project is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds and proof of insurance. Technical standards include AWWA Specification C-600 for pipelines, NEMA MG1 for motors, and AWS D1.2 for aluminum welding. Project administration is managed by the City of Belmont with Willis Engineers serving as the project engineer. Payment is processed via Applications for Payment, with terms set at 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 9 hours ago

DEADLINE

in 20 days
View Details

More opportunities from Department Of Agriculture → Boise National Forest

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS