This Solicitation opportunity from California was posted on May 4, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Police Department Flooring Replacement Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
This contract concerns the replacement of flooring at the secure Manhattan Beach Police Department Building, a site with 24/7 controlled access requiring contractor personnel to undergo stringent security protocols including provision of approved government IDs, a current Real ID Driver's License or U.S. Passport, Live Scan Background Checks at the contractor’s expense, and warrant checks prior to site entry. Work must be completed within 60 working days from the date set in the Notice to Proceed, primarily during off-hours between 8:00 pm and 5:00 am Sunday night through Friday morning, with potential schedule adjustments to maintain police department operations. The contractor is responsible for complying with all applicable permits, codes, environmental regulations, and must ensure work meets the mandatory standards specified in the contract, including adherence to local labor and safety laws, prevailing wage requirements, and specifications consistent with the 2021 Standard Specifications for Public Works Construction. Inspection and acceptance will be conducted by City-appointed personnel at the project site, with final acceptance by the City Council contingent on full completion and satisfactory correction of any deficiencies. The contract operates under a Lowest Price Technically Acceptable (LPTA) award method where bids are evaluated on responsiveness, contractor responsibility (financial stability, licensing, experience), and price, without subjective trade-offs. Deliverables include flooring installation in strict accordance with manufacturer specifications and industry standards such as ASTM and ACI, with materials delivered and stored per defined preservation requirements. Special contract provisions direct stringent security clearances and operational controls onsite, mandatory use of carpooling, restricted parking, and prohibition of material storage in sensitive areas. Change orders are tightly regulated with submission deadlines and audit rights retained by the City for several years post-completion. Proposals must be submitted electronically by June 1, 2026, through the City’s procurement portal with specified documentation including bid bonds and subcontractor designations. The contract lacks standardized Federal Acquisition Regulation clauses and federal identifiers, reflecting its municipal nature, but includes comprehensive provisions addressing quality, safety, environmental compliance, and contract administration consistent with public works practices in California.
General Info
Agency
NAICS
Place of Performance
CA, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Interested Companies (23)
See All 23 Interested Companies
Start a free trial to view all interested companies, their contact details, and full contractor profiles.
Full Description
More opportunities from California → Public Works
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS
